C100 Refurbishment Brainstorming

Slides:



Advertisements
Similar presentations
Lorentz force detuning measurements on the CEA cavity
Advertisements

SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
Vertical Test Area RF qualification of C100 cavities for 12 GeV project Mircea Stirbet Open Collaboration Meeting on Superconducting Linacs for High Power.
Cost comparison of tuners H. Hayano, KEK AWLC14
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
TDR Part 2: 3.3 Cavity Integration (10 pages) H. Hayano Baseline Design based on the meeting discussion.
PIP Update Aug 6 th Agenda Summary Update – Current Activities/Updates – New Tuner Test Result: Reid & Slabaugh – Anode Supplies: Crawford.
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
SRF Cryomodule 2 Cavity Test Results Andy Hocker TD/SRF Dev Dept. All Experimenters Meeting, 10-OCT-2011.
Compatibility in the ILC ML. 主なデザインと相違点 BCD ( TTF) STF-BL その他 空洞、シー ル Φ 78 mm ビームパイ プ、アルミヘキサゴ ン Φ 80 mm ビームパイ プ、インジウムヘリ コ LL, Re 入力カプ ラー TTF-III 円筒セラミック窓.
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
Refurbished Booster RF John Reid October 24, 2012.
Shuichi NoguchiHayama ILC Lecture, Part III ILC BCD Cavity  Maximum Use of Potential Performance  Maximum Use of each Cavity Performance 
I. Ben-Zvi Update Ilan Ben-Zvi for the Stony Brook, BNL and AES SPL teams Presented by Rama Calaga.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
Definition of Work Area H. Hayano, KEK EDR-KOM-cavity at DESY Issues of Cavity and Cavity Package, Work Package discussion.
 =1 cavity: parameters Dimensions for cavity fabrication before any chemical polishing and at room Temp. outer ½ cell pick-up side inner ½ cells outer.
HiLumi-LHC/LARP Crab Cavity System External Review – May Work partly supported by the EU FP7 HiLumi LHC grant agreement No and by the.
Detail plan of S1-Global H. Hayano (KEK),
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Hayama ILC Lecture, , Shuichi Noguchi 1 Part III ILC BCD Cavity  Maximum Use of Potential Performance  Maximum Use of each Cavity Performance.
Plug compatibility discussion TILC09 cavity integration session H. Hayano.
LCLS II Tuner Mechanics; Accessibility/Replacement E. Borissov, Yu.Pischalnikov SRF cavity Tuner Workshop, FNAL, Oct. 13.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
Reliability of SNS Superconducting Linac April 12, 2011 Jeff Saunders SNS/ORNL.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
Jefferson Lab Cryomodule Cost and Optimization. Based Jlab energy upgrade Cryomodule design and produced to increase the energy gain of CEBAF to 12 GeV.
1 new module Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
Cavities, Cryomodules, and Cryogenics Working Group 2 Summary Report Mark Champion, Sang-ho Kim Project X Collaboration Meeting April 12-14, 2011.
Microphonics Discussion For LLRF Design Review Tom Powers 13 June 2016 Not for release outside of JLAB There are several MSWord documents located at: M:\asd\asddata\C100Microphonics2016.
Field Emitter Workshop Summary Rong-Li Geng 2016 CEBAF StayTreat June 28-30, 2016.
Microphonics Discussion For LLRF Design Review Tom Powers 13 June 2016 Not for release outside of JLAB There are several MSWord documents located at: M:\asd\asddata\C100Microphonics2016.
Cost Optimization Models for SRF Linacs
R100/C100 Cryomodule Microphonics
Introduction Six-Month Follow-Up on Action Items of Feb 2016 CEBAF Field Emitter Workshop Rongli Geng September 12, 2016.
RF Systems and Controls for the LERF CM Tests
S1G Experiment Schedule Plan
TDR guideline discussion on Cavity Integration
Preliminary Review of LERF as Cryomodule Testing Facility for LCLS-II
Cryomodule test stand at ESS site
WP5 Elliptical cavities
T5.2: Harmonization - Material and Component Reference
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
SCRF 21-25/Apr/2008 Measurement & Calculation of the Lorentz Detuning for the transient response of the resonant cavity Introduction “Two.
LCLS II SRF Cavity Tuner (developed by FNAL)
Update on HW commissioning
Run coordinator report March 23 – 30, 2011
S1-G Webex meeting Global Design Effort
Mechanical setups Lorentz Force Detuning System Setup
BriXS – MariX WG 8,9 LASA December 13, 2017.
Experience with High Loaded Q cavity Operation at JLAB
C100 Operational Performance
Gradient Team Plans Bob Legg 29 June 2016.
Microphonics and Energy Jitter
C75 Risk Assessment Geoff Krafft
IMP Cryomodule Assembly and Alignment
Cryomodule design modifications for C75
C75 Commissioning Michael Drury SRF Operations Support
Performance Recovery at CEBAF
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Cryomodule Test Schedule
Field Emission and Mitigation in the CEBAF Linacs R Legg, R Geng Jlab SRF Ops Dept. TTC,
JLab Users Organization Annual Meeting June 24, 2019
QCM and C50-12 Status Update
Presentation transcript:

C100 Refurbishment Brainstorming Arne Freyberger, Geoff Krafft, and Tony Reilly Also Contributing: G. Ciovati, Need More Contributions!

C100 Refurbishment C100 Refurbishment is now part of the CEBAF Performance Plan. Need to start the planning process now. Start with assembling a wish list. At this stage any input from any regular PIT attendee is welcome. Suggested initial organizing categories Measurements to be performed during disassembly Cavity (re)processing to be performed during refurbishment Best practices re-assembly procedures to apply Problems in current C100s "to fix“ Reliability improvements (methods to reduce trip/quench rates or FE) Additional important categories???

Measurements to be performed during disassembly Leak check both the insulating vacuum and the cavity string prior to disassembly to identify and replace faulty components. (Gigi) Examine internal and external probe cables for radiation damage (Hovater) (Go to SiO2?)

Cavity (re)processing to be performed Make Cavities Stiffer (Hovater, Drury, Powers) (10 and 20 Hz modes higher and lower their Q (Explicit Dampers (Powers)) Reduce Lorentz coefficient and Hz/Torr Rinsing or other processing to clean up FE (Drury)

Best practices re-assembly procedures to apply Apply LCLS II and recent C50 methods/processing leading to reduced FE (Drury)

Problems in current C100s "to fix" Tuner rework to improve mechanical response and get piezo update that works (Hovater) Cornell “elegant” piezo idea to incorporate (Rimmer)

Reliability improvements (methods to reduce trip/quench rates or FE) Cavity characterization should take into account actual linac conditions -actual operating temps in the linacs, actual cool down rate capabilities (Drury) Consider adding a foot in the center of the CM in order to suppress the 20 Hz beam mode. (Powers) Consider adding some damping to the cryo lines where they come into the CM. (Powers) Add bolt landing spots on the insulating vacuum vessel for the waveguide to insulating vacuum interconnecting struts. (Powers) Provide more steps per Hz on the tuner motor (gear box?) right now it is 9 micro steps to go from 5 degrees detuned to on tune.  It would be nice if it were at least 100 microsteps. (Powers) Add locking nuts to the nonsupporting feet.  Currently the flange above them moves 4 mils when someone pushes the insulating vessel latterally. (Powers)

SUMMARY Eventual goal: prioritized (in importance) list of items to be included in the C100 refurbishment plan