Uses of UITF 10 MeV spin-polarized electron accelerator, beam current up to 100 uA M. Poelker December 12, 2018.

Slides:



Advertisements
Similar presentations
12GeV Project CD-4 Leigh Harwood Associate Project Manager Accelerator Systems.
Advertisements

5 MeV Mott Measurement for CEBAF Operations group Joe Grames, Marcy Stutzman February 14 th, 2007 Sir Nevill F. Mott at the ceremony with his Nobel Prize.
INJECTOR TEST FACILITY UPGRADE PHASE I: 5-10 MEV INJECTOR Feb. 7, 2014.
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate.
Upgrade Injector Test Facility: UITF Why Build It? HDIce commissioning Bubble chamber physics with Bremsstrahlung x-rays: photo-disintegration of oxygen.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF Project Status Meeting Matt Poelker July 31, 2015.
Polarized Injector Status QWeak Collaboration Meeting February 1, 2010 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman, R. Suleiman,
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF Project Status Meeting Matt Poelker October 21, 2015.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Re-scoping UITF Matt Poelker November 14, 2015.
Injector Status & Commissioning QWeak Collaboration Meeting May 24, 2010 P. Adderley, J. Clark, S. Covert, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility 1 Alex Bogacz UITF Beam-line Modeling (2) UITF Mtg. JLAB,
CEBAF Source and Injector Status PREx-II Collaboration Mtg Feb. 26, 2016 Matt Poelker and Joe Grames Center for Injectors and Sources.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Operated by Jefferson Science Associates, LLC for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Polarized Electron Beams.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF Project Status Meeting Matt Poelker April 12, 2016.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF Project Status Meeting Matt Poelker February 23, 2016.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting What we started with… UITF as imagined Upgraded Injector Test Facility - UITF.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF Internal Personnel Safety Review UITF Overview and Introduction Matt Poelker.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting What we started with… UITF as imagined Upgraded Injector Test Facility - UITF.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Upgrade Injector Test Facility: UITF Why Build It? HDIce commissioning Bubble chamber physics with Bremsstrahlung x-rays: photo-disintegration of oxygen.
AIP and Large Projects Arne Freyberger OPS 2015 StayTreat.
Polarized Injector & Upgrade Schedule QWeak Collaboration Meeting November 06, 2009 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF Project Status Meeting Matt Poelker July 12, 2016.
RF Systems and Controls for the LERF CM Tests
Pull Force Measurements of the Magnetized Beam Solenoid
JLEIC R&D weekly meeting, Thursday Jan 26, JLab.
CBETA Technical Review
LERF as Cryomodule Testing Facility Set-Up and Installation Logistics
Bubble Chamber Schedule – 2017
Injectors and Sources Operations and R&D M. Poelker
UITF – Upgrade Injector Test Facility
CEBAF Injector Update PREX/CREX March 3-4, 2017
Overview of LERF Status, Plans and Goals
Operational Experience - Field Emission
UITF Project Status Meeting
Injectors and Sources Operations and R&D M. Poelker
UITF Project Status Meeting
CEBAF Injector Overview
Magnetized Bunched Electron Beam from DC High Voltage Photogun
Electron Beam Setup for Bubble Chamber
Thomas Jefferson National Accelerator Facility
Upgraded Injector Test Facility
QWeak Collaboration Meeting
Upgraded Injector Test Facility - UITF
UITF MPS system requirements
Magnetized Electron Beam for Ion Cooling at JLEIC
Performance Degradation cERL Injector Cryomodule
Laboratory Directed Research and Development (LDRD) Proposal
Electron Source Configuration
Magnetized Electron Source, LDRD
Production of Magnetized Electron Beam from a DC High Voltage Photogun
Center for Injectors and Sources
Upgraded Injector Test Facility
R. Suleiman and M. Poelker October 12, 2018
Riad Suleiman February 2, 2017
A. Freyberg Aug 2016 ECT’16 =>
Carlos Hernandez-Garcia Don Bullard February 2, 2017
Test of Booster at UITF Reza Kazimi (12/12/18)
Polarized Source: Recent Activities
Electron Gun UP (EGUP) Plan
CTF Users’ Perspective
Upgraded Injector Test Facility
UITF Conduct of Operations Review
UITF Conduct of Operations Review
QCM and C50-12 Status Update
Presentation transcript:

Uses of UITF 10 MeV spin-polarized electron accelerator, beam current up to 100 uA M. Poelker December 12, 2018

Upgraded Injector Test Facility - UITF TEST NEW PHOTOGUNS TEST 200 kV WIEN FILTER TEST HDIce COMMISSION NEW QUARTER CRYOMODULE Build UITF Obtain Permission to Operate UITF Use UITF 2

Upgraded Injector Test Facility (UITF)

Build UITF –where are we today? Finish the mechanical design! Pretty close now…. Need beampipe between QCM and HDIce! Gun Group (+ Vacuum Group?) Installation group, compressed air and water to valves, viewers, cups, dumps EES: Cable-up all the MeV beamline components valves, viewers, BPMs, harps, water flow meters, current monitors, ion pumps…. Magnet group: build a third trim-card rack, cable up all magnets RF group: finish klystrons and high power amplifier, water skids SRF, re-commission the QCM with RF Electrical engineering and SSG: design and build the PSS BCM, our "credited control" to limit beam current/loss and prevent accidental exposure to x-rays SSG needs to incorporate high power RF interlocks into PSS, recertify. Commission the BLMs. Add PSS BCM to circuitry RCG: finish specifying the shielding requirements RCG to install all CARMs and electronics Ops Software to support all this! Gun group needs to build a new photogun, improve the Wien filter R&D related to sub-nanoAmp operation (this will be important for CEBAF too) 4

Obtain Permission to Operate UITF Review #1, UITF – Will it Work? Review #2, UITF Safety Concerns Review #3, What is UITF’s Conduct of Operation? (besides this review, there is a large accompanying package of documentation, e.g., OSPs) Review #4, Accelerator Readiness Review (are we ready to operate?) Review #5, and Experimental Readiness Review for each Use if UITF

Drivers, Considerations Andy has proposed a schedule, four run periods to support eventual HDIce installation CEBAF for four A- rated PAC-approved experiments. HDIce work at UITF complete February 2020 Arne suggests QCM installation at CEBAF during long 2020 shutdown Mary Logue suggests I have a naïve view of obtaining permission to operate UITF CTF limited LHe capacity, busy CMTF schedule UITF has value beyond QCM and HDIce commissioning (today’s meeting) CIS is not adequately staffed to operate it (plus CEBAF, LERF and GTS)

P. Adderley, B. Bullard, J. Grames, J. Hansknecht, Gun Group P. Adderley, B. Bullard, J. Grames, J. Hansknecht, C. Hernandez-Garcia, M. Poelker, R. Suleiman, M. Stutzman, and S. Zhang Postdoc: M. A. Mamun Graduate Students: G. Palacios, Y. Wang*, S. Wijiethunga, J. Yoskovitz, M. Stefani Frequently working with others: D. Moser, F. Hannon, R. Kazimi, A. Hofler, J. Benesch, M. Tiefenback, G. Krafft, many others….