GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
Advertisements

GLAST LAT ProjectMonthly Status Meeting Jan 26, Project Status January 26, 2006 Gamma-ray Large Area Space Telescope Lowell A. Klaisner Project.
SVACInstrument Analysis Meeting, October 7, 2005 Anders W. Borgland 1 CAL Calibrations And High Energy Muon Gain Anders W. Borgland Science Verification,
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
GLAST LAT ProjectOnline Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project Aug 1, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
SVAC/PVOC&A Meeting, February 6, 2006 Anders W. Borgland 1 Instrument Analysis Activities Anders W. Borgland Science Verification, Analysis and Calibrations.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status May 2, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray Large.
A.Chekhtman1 GLAST LAT ProjectCalibration and Analysis group meeting, April, 3, 2006 CAL on-orbit calibration with protons. Alexandre Chekhtman NRL/GMU.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
SVAC Instrument Analysis Meeting Aug 5, 2005 E. do Couto e Silva and Anders W. Borgland 1/7 SVAC 8 tower testing+ACD Anders and Eduardo.
GLAST LAT ProjectGLAST Flight Software IDT, October 16, 2001 JJRussell1 October 16, 2001 What’s Covered Activity –Monitoring FSW defines this as activity.
SVACInstrument Analysis Meeting, January 13, 2006 Anders W. Borgland 1 Data Is (Nearly) Here! Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review LAT Test Verification Process Presentation 4 of 12 GLAST Large Area Telescope Gamma-ray Large.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT Project Oct 5, GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Current Status Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 1 GLAST Large Area Telescope Pre-Environmental Test Review EMI/EMC.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Systems Engineering Mike DeKlotz GSFC Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Instrument Configuration by File James Swain Stanford.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
LAT EMI Test LAT test levels derived from LAT-SS-0778 Use CAL EMI test procedure as template –LAT-PS Test Suite: –CE102 Conducted Emissions, Power.
GLAST LAT Project SE Test Planning Dec 7, 2004 E. do Couto e Silva 1/27 Trigger and SVAC Tests During LAT integration Su Dong, Eduardo do Couto e Silva.
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Gamma-ray Large Area Space Telescope
GLAST Large Area Telescope
GLAST LAT System Engineering
GLAST Large Area Telescope
GLAST Large Area Telescope:
Electrical Ground Support Equipment Verification Test Support
7E: Tower test plans GLAST Large Area Telescope: Tracker Subsystem
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
Calorimeter calibrations with Flight Software.
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST LAT System Engineering
LAT Operations Scenario Subsystem Meetings
Integration and Test Organization Chart
GLAST LAT System Engineering
GLAST Large Area Telescope
GLAST Large Area Telescope: I&T Test Readiness Review
Introduction and Overview
GLAST Large Area Telescope
Overview Cost to Complete
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Test Readiness Review
Presentation transcript:

GLAST Large Area Telescope: Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Results of LAT Level Test Issues Meeting Held on 10/28 Pat Hascall

Overview On October 28, we held a meeting to resolve a few remaining LAT level test issues The guests of honor were Mike Huffer and JJ Other attendees were Dick Horn, Neil Johnson, Anders Borgland, Lester Miller, Selim Tuvi, and Ric Claus Additionally we discussed the use of test points. The IRD states that “Data collected to verify acceptance or qualification of performance requirements shall be acquired through flight interfaces and not through test point interfaces“. Our interpretation is that the LATTE 4x based testing defined below is not verification of LAT level performance requirements.

Results LRS counter testing / verification The LRS counters functionality is sold off at box level and will be demonstrated in test case LAT22x (Science Mode Demo) No LAT level test for CAL or TKR requires LRS counters. For the ACD HLDCAL, we will use the calibrations acquired using LATTE 4x tests. We do need a test that demonstrates CNO detection that uses charge injection and either event data or LRS counters. (part of vetohitmap test in ACD CPT) Register test Near term we will use LATTE 4x based test and the GASU register tests (Test case LAT05x). This will be part of the testing done before LAT ships to NRL, and may be repeated at NRL. According to Mike, GASU register tests must be augmented with TEM reg tests and ACD register tests We will consider adding a FSW based register test as a diagnostic later. A potential interim solution is the “poor mans” register test that uses LATC to load 4 or so bit patterns (requires FSW change).

Results (Continued) Time tag accuracy The LAT part of this test will be put in the trigger tests. The test is based on triggering the LAT with the 1PPS and examining the event time tags – this will demonstrate time tags at a point in the 1 second cycle. Part of LAT21x The second piece is tests on the test bed that demonstrate time tags across the entire 1 second cycle. Analysis will be used to combine the test results to show that the LAT will meet the time tag accuracy requirements. Flow control A LATTE 4x based test (ported from subsystems) will verify that the flow control functionality is working at the LAT level within the data flow portion of the LAT. Run once via LATTE4x at the beginning of phase 2 There needs to be a FSW filter that will not respond to events to check the flow control between data flow and FSW. (part of test case LAT21x)

Results (Continued) Frequency margin tests This will be the CAL, Tracker and ACD LPTs run at 18 and 22MHz. (TBR) This is a one time test during the engineering checkout of the LAT, after integration of all 3rd layer boxes LAT input voltage margin tests The LAT will be tested with input voltage at 27 and 29V. The subsystem LPTs will be performed. (Or a short muon run) Test case LAT03x Verification of attitude information from the spacecraft The FQT (or test on the testbed) will verify that the spacecraft geometry is correctly used to determine GRB position by feeding in the simulation of a GRB at a known location. At the LAT level, we only need to demonstrate that the attitude information is correctly transported across the interface (Part of test case LAT23x) Parity bit tests Use DAQ LATTE 4 based test that does this function. It will be run one time before shipment to NRL First part of phase 2