MONTERY COUNTY 2005 GENERAL PLAN UPDATE STUDY SESSION – WATER RESOURCES May 19, 2005.

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

Monterey Peninsula Water Management District 1 11.Consider Proposed Agreement with California American Water Regarding Management and Operation of Aquifer.
1 Mitigation Program Summary Insures compliance with MPWMD Water Allocation Program EIR measures to mitigate for impacts from the extraction of water to.
WATER FOR THE 21 st CENTURY ECONOMY AND ENVIRONMENT Santa Ana River Watershed Conference April 11, 2013.
California Water Balance. Water Reserved for the Environment.
MONTERY COUNTY 2005 GENERAL PLAN UPDATE STUDY SESSION INFRASTRUCTURE REVISIONS July 7, 2005.
Integrating Water Management The Future of Integrated Water Management: Moving the Program Forward Gary Bardini, Deputy Director CA Department of Water.
NPDES Phase II in Wake County: Forging A Collaborative Approach to Stormwater Management APWA Conference September 19, 2005.
Zone 7 Water Agency Zone 7’s Salt Management Plan Past, Present & Future May 9, 2012 Kurt Arends, P.E. AGM Engineering and Operations Zone 7 Water Agency.
MONTERY COUNTY 2005 GENERAL PLAN UPDATE STUDY SESSION – DOMESTIC WATER May 19, 2005.
Proposed Stormwater Regulations Public Forum Richland County Government September 2009.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Preparing for the Rainy Season SFWMD Operations & Actions.
Monterey Peninsula Water Supply Project - Presentation to Monterey Co. Water Resources Agency June 25, 2012.
Presented by Chris Stone Assistant Deputy Director Water Resources Division.
California Recycled Water Plan California Recycled Water Plan A comprehensive approach to California’s long-term water supply By Gregory B. Ryan and Meagan.
Community GPU Forums California Native Plant Society, Monterey Bay Chapter Carmel Valley Association Citizens for Responsible Growth Coalition to Protect.
Overview of California’s System Yield Threats, Challenges, and the Need to Augment and Diversify Water Portfolios Robert Shibatani CEO & Principal Hydrologist.
Water Resource Division San Joaquin County Water Resource Management Planning Update C. Mel Lytle, Ph.D. Water Resource Coordinator San Joaquin County.
Overview of Indian Wells Valley Hydrogeology and Management Presenters.
Water Resources State Mission guided by the National Water Mission
Bay Area IRWMP Public Workshop #1 July 23, OBJECTIVES I BAIRWMP-Goals and Objectives II. DWR Guidance- “Measures” III Process IV. Proposed.
National Pollutant Discharge Elimination System(NPDES) Permit.
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
Monterey Rate Application Satellite Systems May 13, 2008.
NRCS Watershed Rehabilitation
Watershed Council June 22,2010 BAIRWMP Update BAIRWMP Update State Funding: State Funding: Prop 50 Prop 50 Prop 1-E (Stormwater Flood Management), Prop.
Policy Position Statement.  Ground Water Replenishment (GWR) - by Monterey Regional Pollution Control Agency (MRWPCA) and Monterey Peninsula Water Management.
Southern California Regional Watershed Supply Alternatives
COMPREHENSIVE FLOODPLAIN MANAGEMENT : Promoting Wise Uses of Floodplains CA Department of Water Resources/ CIFMCG Workshop July 2006.
Jim Heitzman General Manager Marina Coast Water District
Introduction to PA Act 167 Stormwater Management Planning Little Juniata River Watershed April 21, 2005.
1 California Water Plan Update 2009 Resource Management Strategies Overview 1 st Plenary Meeting Sacramento October 23, 2007.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Presentation prepared by: Toni Crosby Antoinette Aguirre Mike Belanger Beata O’Brien.
1 The Rise of Regionalism in Water Resources John K. Woodling California Department of Water Resources North Bay Watershed Association Conference April.
Water for Monterey County Regional Project Capital and O&M Cost Description 1 Lyndel Melton, P.E. RMC Water and Environment.
Monterey Peninsula Water Supply Project April 23, 2012.
Governor’s Strategic Growth Plan Flood Protection and Clean, Safe, Reliable Water Supply Bond and Financing Acts of 2006 and 2010 Southern California Water.
Integrated Regional Watershed Management Plan Presentation – March 12, 2013 HLVRCD.
An Interregional Water Solution with Conjunctive Use of Groundwater Haskell L. Simon President, Coastal Plains Groundwater Conservation District Vice President,
Stormwater Retrofitting: The Art of Opportunity Prepared by the Center for Watershed Protection.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Technical Workshops on Monterey Peninsula Water Supply Project A July 26 & 27, 2012.
What are some ways to reduce the risks to public health in drinking water from Salinas Valley? Andrew Mims Nitrates In Groundwater Presentation ENSTU 300.
Comprehensive Policy Plan Amendments Wekiva Parkway and Protection Act December 18, 2007 Comprehensive Policy Plan Amendments Wekiva Parkway and Protection.
U.S. Army Corps of Engineers Inter-Agency Coordination BLM PILOT VERNAL & GLENWOOD SPRINGS U.S. Army Corps of Engineers & U.S. Bureau of Land.
Cooperating Partners Presentation October 12, 2006 Integrated Regional Water Management Plan (IRWMP) B S Strategies and Objectives C ANTA ARBARA OUNTY.
Maximizing Water Supply Sustainability for the Goleta Valley Ryan Drake Water Supply and Conservation Manager 2015 Central Coast Sustainability Summit.
Groundwater Assessment Study for the Metropolitan Water District of Southern California Southern California Water Dialogue May 2008.
1 State Water Resources Control Board Draft Cease and Desist Order Community Leader Workshop March 28, 2008.
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
Oakdale Irrigation District Agricultural Water Management Plan Briefing on 2015 Update January 5, /5/2016 OID AWMP Update Briefing.
Regionalism in Water Resources Management
California Water Plan Update Advisory Committee Meeting January 20, 2005.
Chris Stone Assistant Deputy Director Water Resources Division.
San Gabriel Valley From Stormwater to Supply
Climate Change Threat Drought 1. Potential Impacts from Drought How might our community be impacted by drought? 2.
Climate Change Threat Reduced Snowpack 1. Potential Impacts Related to Reduced Snowpack How might our community be impacted by reduced snowpack? 2.
Water Resource Management Planning Update
Sacramento County Stormwater Quality Program
Zone 7 And WaterFix March 7, 2018
Water Resource Management Planning Update
Nebraska Water Infrastructure Funding and Financing Programs
Salt and Nutrient Management Plans
Orange County Groundwater Basin Compliance with SGMA
Status after Second Year of Work Implementing the Recommendations of the Santa Cruz Water Supply Advisory Committee Joint Meeting Santa Cruz City Council.
Sacramento County Stormwater Quality Program
Is the Bay Area Ready for Potable Reuse?
Antelope Valley-East Kern Water Agency
Presentation transcript:

MONTERY COUNTY 2005 GENERAL PLAN UPDATE STUDY SESSION – WATER RESOURCES May 19, 2005

Introduction – GPU Water Issues Regional Water supply Regional Water supply Use and demand Use and demand Management and governance Management and governance Challenges Challenges Solutions Solutions

What is an Acre-Foot? One water measurement is an acre-foot (AF) One acre-foot = 326,000 gallons Covers one acre, one foot deep Or about one football field to one foot deep In general, two or three households use about one acre-foot of water per year

Monterey County Water Use Total Estimate 600,000 acre-ft Urban 60,000 acre-ft Agriculture 540,000 acre-ft

Monterey County Water Use Salinas Valley 550,000 acre-ft North County 31,000 acre-ft Peninsula 15,000 acre-ft

Monterey Water Supply Monterey County has ample water supplies Monterey County has ample water supplies Over 400,000 ac-ft of undeveloped surafce water Over 400,000 ac-ft of undeveloped surafce water Issue is how to manage the supplies we have Issue is how to manage the supplies we have Develop better distribution infrastructure Develop better distribution infrastructure

Monterey County: Total Available H 2 O - 1,000,000 ac-ft Environmental ? Undeveloped Surface Water 400,000 ac-ft Developed Water Sources 600,000 ac-ft

Average Annual Outflow: 60,000 AF Average Annual Outflow: 250,000 AF Average Annual Outflow: 100,000 AF Surface Water Supplies

Groundwater is the Primary Source of Supply and Storage

ReservoirReleases95% Ground Water Conservation 5% Monterey County: Current Developed Surface Water Recycled Water Desalination

Urban Water Resource Challenges Salinas Valley Groundwater Basin Salinas Valley Groundwater Basin 9,000 acft Seawater Intrusion 9,000 acft Seawater Intrusion MCWD/FOR A MCWD/FOR A groundwater quality and augmentation groundwater quality and augmentation No Mo Co (PVWMA and WRA) No Mo Co (PVWMA and WRA) 15,000 acft overdraft 15,000 acft overdraft Salinas and Valley Cities Salinas and Valley Cities water quality concerns water quality concerns MPWMD MPWMD 10,730 acft draw without water rights 10,730 acft draw without water rights Seaside basin in overdraft Seaside basin in overdraft

ReservoirReleases Conservation 95% 95% Ground Water 5% 5% Surface Water Recycled Water Desalination Monterey County : Future Developed

GPU Policy Consideration Develop infrastructure to better manage the water supplies we have Develop infrastructure to better manage the water supplies we have Regional water supply solutions Regional water supply solutions Eliminate overdraft and seawater intrusion Eliminate overdraft and seawater intrusion Enhance our groundwater resources Enhance our groundwater resources Develop new supplies Develop new supplies Develop IRWMP and CIP Develop IRWMP and CIP

Salinas Valley Water Project Critically needed infrastructure Spillway Modification Surface Diversion Reservoir Re-op Cost $18.8 mil

Regional Desal Transmission Pipeline & Facilities

Water Resource Governance Water Resource Management Water Resource Management Monterey County Water Resources Agency Monterey County Water Resources Agency Monterey Peninsula Water Management District Monterey Peninsula Water Management District Pajaro Valley Water Management Agency Pajaro Valley Water Management Agency

REGIONAL WATER SUPPLY Support programs to secure and protect the County's water resources. Support programs to secure and protect the County's water resources. Reduce overdraft and seawater intrusion and bring the groundwater basins into balance. Reduce overdraft and seawater intrusion and bring the groundwater basins into balance. Develop Capital Improvement Plan to address regional needs. Develop Capital Improvement Plan to address regional needs.

DISTRIBUTION ELEMENTS Identify needs - to improve local distribution (minimize mutual water companies). Identify needs - to improve local distribution (minimize mutual water companies). Capacity to maintain (TMF). Capacity to maintain (TMF). Support consolidation. Support consolidation.

Water Purveyors Water Purveyors Water Purveyors PVWMA PVWMA Aromas Aromas Pajaro Sunny Mesa Pajaro Sunny Mesa Cal Water Cal Water ALCO Water ALCO Water California-American Water California-American Water Castroville Water District Castroville Water District Marina Coast Water District Marina Coast Water District PBCSD/CAWD PBCSD/CAWD MCWRA MCWRA

NoMoCo Water Management Plan PVWMA and WRA have need for improved distribution PVWMA and WRA have need for improved distribution PVWMA – Basin Management Plan 2002 with recycled water and imported state water PVWMA – Basin Management Plan 2002 with recycled water and imported state water WRA – NoMoCo plan for the Salinas watershed WRA – NoMoCo plan for the Salinas watershed

Springfield Ag Irrigation Project 4

CSIP Extension 5

Water Supply System Consolidation Prunedale Area Only 6

System Consolidation with New Wells 7

FLOOD MANAGEMENT PROGRAM

Salinas River near Las Palmas Ranch, 1995

Lower Carmel River, 1998

Pajaro River, 1995

TOTAL COSTS OF PRIOR PROJECTS October 2002 Approximate Project Costs Salinas River $ 9,000,000 Carmel River 8,000,000 Pajaro River 100,000,000 Other 120,000,000 Total Costs $237,000,000

FLOOD MANAGEMENT PROGRAM Establish policies to minimize impacts to flood prone areas (flood plains). Establish policies to minimize impacts to flood prone areas (flood plains). Establish mitigation measures and design requirements to reduce flood risks. Establish mitigation measures and design requirements to reduce flood risks. Include flood prevention facilities in a Capitol Improvement Plan. Include flood prevention facilities in a Capitol Improvement Plan.

STORM WATER RUNOFF MANAGEMENT Develop performance standards (BMPs). Develop performance standards (BMPs). Design and construction of facilities should reduce peak storm flows and provide water quality benefits. Design and construction of facilities should reduce peak storm flows and provide water quality benefits. Work with County Cities to implement our Regional Storm Water Phase II Program. Work with County Cities to implement our Regional Storm Water Phase II Program.

DRAINAGE AND EROSION Inventory areas of the County that have high probability of erosion, sedimentation and chemical pollution Inventory areas of the County that have high probability of erosion, sedimentation and chemical pollution Require drainage and erosion management plans, best management practices and drainage improvements for development Require drainage and erosion management plans, best management practices and drainage improvements for development Require regular maintenance of drainage improvements Require regular maintenance of drainage improvements

RECOMMENDATIONS WATERRESOURCES

DEVELOPMENT OF WATER RESOURCES (1 of 2) 1. Coordinate and collaborate with all agencies responsible for the management of existing and new water resources. 2. Develop a program to eliminate overdraft it its water basins through a variety of strategies to be included in a Capital Improvement Program (CIP) including water banking, groundwater and aquifer recharge and recovery, desalination, pipelines to new supplies and a variety of conjunctive use techniques (consistent with Health and Safety Regulations). 3. As part of an overall conservation strategy and to improve water quality, the County shall encouraging taking development on erosive soils out of production.

DEVELOPMENT OF WATER RESOURCES (2 of 2) 4. The County Building Division shall establish guidelines that integrate National Greenbook construction materials and fixtures that contribute to increased levels of water conservation. 5. Water recycling including dual plumbing shall be for outdoor irrigation only. A cross- connection control program to provide regulatory oversight is needed. 6. The use of grey water for commercial landscaping purposes shall require a discretionary permit.

FLOOD MANAGEMENT 7.County Flood Management Program shall include: Mapping of floodplain and high risk areas Mapping of floodplain and high risk areas Establish policies to keep intensive uses out of flood prone areas Establish policies to keep intensive uses out of flood prone areas Establish mitigation measures and design requirements to reduce flood risks Establish mitigation measures and design requirements to reduce flood risks Incorporate local and regional flood management plans and facilities Incorporate local and regional flood management plans and facilities Construct flood prevention facilities where fundable Construct flood prevention facilities where fundable Employ both structural and non-structural solutions to maintain floodplain functions of sedimentation, deposition, water filtering and flood water absorption Employ both structural and non-structural solutions to maintain floodplain functions of sedimentation, deposition, water filtering and flood water absorption 8.Develop runoff performance standards that result in an array of site planning and design techniques. These techniques should reduce storm flows, capture and recharge runoff water. Design and construction of facilities should reduce peak storm flows and provide water quality benefits.

DRAINAGE AND EROSION 9. Inventory areas of the County that have a high probability of erosion, sedimentation and chemical pollution. 10. Require erosion management plans for development in these areas. 11. Require drainage improvements as a condition of project approval.