802.11af Liaison Report Date: Authors: May 2012 Month Year

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0095r0 Submission July 2013 Hyunduk Kang, ETRISlide 1 TG1 Closing Report for July 2013 Notice: This document has been prepared to.
Advertisements

Doc.: IEEE /147r0 Submission Nov 2011 Slide 1 [Report on Activities ] Notice: This document has been prepared to assist IEEE It.
Doc.: IEEE /0054r0 Submission March 2013 Mika Kasslin, NokiaSlide 1 TG1 Closing Report for March 2013 Notice: This document has been prepared.
Doc.: IEEE /0110r1 Submission September 2011 Prabodh Varshney, NokiaSlide af Liaison Report Notice: This document has been prepared to.
Doc.: IEEE /0185r0 Submission September 2012 Prabodh Varshney, NokiaSlide af Liaison Report Notice: This document has been prepared to.
Doc.: IEEE /0077r1 Submission May 2013 Hyunduk Kang, ETRISlide 1 TG1 Closing Report for May 2013 Notice: This document has been prepared to assist.
Submission doc.: IEEE /0052r1 March 2016 Sho Furuichi, SonySlide 1 Supplemental document for text proposal on amendment to entity operations Date:
TG 1 March Session Closing Report
TGaf Dallas Closing Report
TG1 Introduction and Status
TGaf San Francisco Closing Report
doc.: IEEE <doc#>
January 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for January 2016] Date.
doc.: IEEE <doc#>
Submission Title: [WG-TG3 Opening Report May03]
January 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for January 2018] Date.
doc.: IEEE <doc#>
TGaf Waikoloa Closing Report
July 2014 doc.: IEEE /3/2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
July 2014 doc.: IEEE /3/2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
March 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for March 2016] Date.
January 2013 doc.: IEEE < > January 2013
Submission Title: [WG-TG3 closing Report May02]
September 2002 Project: IEEE P Working Group for Wireless Local Area Networks (WLANs) Submission Title: Liaison Report, September 2002 Date.
doc.: IEEE <doc#>
Submission Title: TG4m-4TV Closing Report for November 2011
802.11af Liaison Report Date: Authors: November 2011
802.11af Liaison Report Date: Authors: March 2011
doc.: IEEE <doc#>
802.11af Liaison Report Date: Authors: January 2012
802.11af Liaison Report Date: Authors: March 2012
IEEE TGaf Beijing Closing Report
Submission Title: TG4m 4TV Closing Report for January 2013
Tutorial Introduction Section
March 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for March 2015] Date.
TGaf Geneva Closing Report
IEEE TGaf Waikoloa Closing Report
TGaf Indian Wells Closing Report
TGaf San Francisco Closing Report
doc.: IEEE <doc#>
IEEE TGaf Orlando Closing Report
IEEE TGaf Dallas Closing Report
Liaison Report to Date: Authors: May 2012
TGaf San Antonio Closing Report
July 2013 doc.: IEEE < > July 2013
IEEE TGaf Singapore Closing Report
TGaf Waikoloa Closing Report
Tutorial Introduction Section
IEEE TGaf DRAFT Meeting Plan and Agenda
Nov 2012 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Opening report for TG4j (MBAN) Task Group, Nov.
IEEE TGaf Palm Springs Closing Report
IEEE P802.22b May 2014 Plan & Report
doc.: IEEE <doc#>
RR-TAG Liaison Report Mar07 IEEE
Liaison Report to Date: Authors:
TGaf Orlando Closing Report
TGaf Nanjing Closing Report
TG 1 November Session Opening Report
January 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [17.
July 2014 doc.: IEEE /24/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
TGaf San Antonio Closing Report
802.11af Liaison Report Date: Authors: January 2013
Submission Title: TG4m 4TV Closing Report for May 2012
802.11af Liaison Report Date: Authors: July 2011 Month Year
Liaison Report from Date: Authors: September 2011
May 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [15 May.
Liaison Report to Date: Authors: January 2013
July 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [ July.
TGaf Waikoloa Closing Report
IEEE TGaf Beijing Closing Report
Presentation transcript:

802.11af Liaison Report Date: 2012-05-17 Authors: May 2012 Month Year doc.: IEEE 802.19-11-0090-00-0000 May 2012 802.11af Liaison Report Date: 2012-05-17 Authors: Notice: This document has been prepared to assist IEEE 802.19. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Prabodh Varshney, Nokia John Doe, Some Company

Abstract Liaison report from 802.11af as presented to 802.19. May 2012 Month Year doc.: IEEE 802.19-11-0090-00-0000 May 2012 Abstract Liaison report from 802.11af as presented to 802.19. Prabodh Varshney, Nokia John Doe, Some Company

802.11af Status before May Meeting Group had telcos on March 20, 27, April 3, 10, 17, May 1, and May 8. Regulatory discussions from FCC’s latest changes (third M&O FCC-12-36A1 released on April 5th) regarding absolute values for out of band emission levels, Ofcom (TV tuner measurements based on actual field data in UK) and SE43 (currently creating a working document towards complementary Report to ECC Report 159). PHY discussions continued on impact to channel bandwidth based on FCC’s changes on emission masks, but no specific plan yet on contributions. Ofcom has not finalized its ACLR values yet. Discussions on Cambridge trial, especially the highlight there on rural internet use cases, and protection requirements for PMSE and DTT. FCC is considering to open up more unlicensed or lightly licensed spectrum especially on 3550-3650 MHz. High level submission on down-clocking and channel bandwidth proposal again in May F2F, and would like to get decision. Meeting with TGac PHY people to estimate ETA for TGaf PHY submissions Regulatory report of the Japanese TVWS will be presented in May face to face meeting. . Prabodh Varshney, Nokia

802.11af Status before May Meeting Plan for May meeting: Approve meeting and teleconference minutes Review the results of LB171 Approve draft P802.11af D1.07 as the working draft Officer Elections Review of the progress since March Regulatory update PHY planning PHY Comment resolution Plan for July meeting and teleconferences Task Group Officers Chair: Rich Kennedy (Research In Motion) Vice-chair and Editor: Peter Ecclesine (Cisco Systems) Vice-chair and Recording Secretary: Zhou Lan (NICT). . Prabodh Varshney, Nokia

Current 802.11af Status May 2012 Elected task Group Officers Chair: Rich Kennedy (Research In Motion) Vice-chair and Editor: Peter Ecclesine (Cisco Systems) Vice-chair and Recording Secretary: Zhou Lan (NICT). Approved speculative draft 1.07 as working draft. Document 699 (Broadcom and Qualcomm) : PHY design proposal approved by group. The PHY for one TVWS channel (6MHz, 7MHz or 8MHz) is based on the 40MHz 128FFT VHT PHY as defined in clause 22. For 6 MHz TVWS channels: tone spacing is 41.66 kHz with sampling frequency of 5.33 MHz. For 8 MHz TVWS channels: tone spacing is 55.55 kHz with sampling frequency of 7.11 MHz. Support for multi-channel coexistence: the pre-VHT fields shall be placed around the middle of each TVWS channel irrespective of the number and location of the channels used for transmission. Prabodh Varshney, Nokia

Current 802.11af Status Regulatory update: May 2012 FCC released 3rd memorandum opinion and order and following changes (as compared to 2nd MO & O) were made: Modifyed rules to establish a maximum HAAT for a fixed device antenna of 250 meters (from 76 meters) and maintain the limit for fixed device antenna height AGL at 30 meters. Modifyed the rules for adjacent channel emission limits to specify fixed values, rather than vary the limit relative to the in-band power. Increased the PSD limit for each category of TV bands device by 0.4 dB, which will allow a TV bands device to operate at the maximum permissible power in a bandwidth of 5.5 MHz instead of 6 MHz. These are final rules in the sense that they cannot be petitioned anymore. Ofcom VNS (Voluntary National Standard): It is applicable for UK only. They are bringing all this to ETSI so that it can be adopted by rest of EU. Trying to get this done by end of June. Prabodh Varshney, Nokia

Current 802.11af Status Regulatory update (contd): May 2012 Japan: White Space Promotion council objective is to expand nation-wide white space utilization. They have created a working group for coexistence (between primary and secondary users) in white space applications. WG has published report in March 2012. Services permitted in TV white space with conditions summarized by White space utilized broadcasting system WG. It is not license-exempt (need to register with MIC and they decide if service can be used). Main use case right now is for broadcasting but usage for broadband internet access and sensor network may increase in future. Prabodh Varshney, Nokia

May 2012 Current 802.11af Status Document 602r0 defines the specification development process for the group. BandID in clause 8 needs to be added for TVWS. Then define in MAC sections (clause 8, 9, 10) MAC features which are valid for TVWS with BandID set as TVWS MAC. Documents 647r2, 648r1 and 649r1 (LG) provided comment resolution related to CSM, information value field and editorial. Prabodh Varshney, Nokia

Plan for July Meeting Approve minutes from Atlanta and teleconferences May 2012 Plan for July Meeting Approve minutes from Atlanta and teleconferences Clause 23 submission Complete LB 171 comment resolution Create Draft 2.0 and ask the WG for approval to begin a new Letter Ballot Regulatory update Teleconferences: Weekly on Tuesdays starting May 29th. Time: 21:00 ET for up to 2 hours. Prabodh Varshney, Nokia

Official TGaf Timeline May 2012 Official TGaf Timeline Initial Working Group Letter Ballot: January 2011 Second Working Group Letter Ballot: July 2012 Recirculation Letter Ballot: November 2012 Form Sponsor Ballot Pool: February 2013 Initial Sponsor Ballot: March 2013 Recirculate Sponsor Ballot: July 2013 Final WG/EC Approval: March 2014 RevCom/Standards Board Approval: March 2014 Prabodh Varshney, Nokia