TGn Closing Report – November 05

Slides:



Advertisements
Similar presentations
TGu Timeline Date: Authors: March 2006 March 2006
Advertisements

Coexistence Motions for LB84 Comment Resolution
LB84 General AdHoc Group Sept. Closing TGn Motions
LB84 General AdHoc Group Sept. Closing TGn Motions
[ Interim Meetings 2006] Date: Authors: July 2005
TGn Closing Report – July ‘05
London TGu Motions Authors: January 2007 Date: Month Year
LB73 Noise and Location Categories
LB73 Noise and Location Categories
SG CUB Tentative Timeline
TGs Closing Report Date: Authors: January 2006 January 2006
Waveform Generator Source Code
TGu Closing Report Date: Authors: November 2005
March 2014 Election Results
Attendance and Documentation for the March 2007 Plenary
Attendance and Documentation for the March 2007 Plenary
[ Policies and Procedure Summary]
[ Policies and Procedure Summary]
November Opening Report
Motion to accept Draft p 2.0
[place presentation subject title text here]
Motions Date: Authors: January 2006
TGp Closing Report Date: Authors: March 2006 Month Year
TGn PSMP ad hoc Agenda – September 14 ‘06
TGp Closing Report Date: Authors: March 2006 Month Year
Reflector Tutorial Date: Authors: July 2006 Month Year
TGv Redline D0.07 Insert and Deletion
TGu Timeline Date: Authors: January 2005 January 2005
TGv Redline D0.06 Insert and Deletion
TGs San Diego Closing Report
ADS Study Group Mid-week Report
TGu Timeline Date: Authors: July 2005 July 2005
TGu Timeline Date: Authors: July 2006 July 2006
TGu Timeline Date: Authors: November 2006 November 2006
TGn Closing Report – May ‘05
Attendance for November 2006
TGn PSMP Adhoc Group Dallas Opening report
TGu-changes-from-d0-01-to-d0-02
TGu Timeline Date: Authors: May 2006 May 2006
LB73 Noise and Location Categories
PHY Ad Hoc September Opening Report
March 2012 Opening Report Date: Authors: March 2012
TGy draft 2.0 with changebars from draft 1.0
TGv Redline D0.10 Insert and Deletion
TGn PSMP Adhoc Group Dallas Opening report
TGu Timeline Date: Authors: May 2006 May 2006
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Redline of draft P802.11w D2.2 Date: Authors:
TGp Closing Report Date: Authors: March 2007 Month Year
November Opening Report
TGr Proposed Draft Revision Notice
TGu-changes-from-d0-02-to-d0-03
[ Policies and Procedure Summary]
March Opening Report Date: Authors: March 2011
Beamforming and Link Adaptation Motions
TGn Proposed Draft Revision Notice
[ Policies and Procedure Summary]
PHY Motions for LB84 Comment Resolution
November 2012 Opening Report
September 2012 Opening Report
January Opening Report
TGu Timeline Date: Authors: May 2006 May 2006
TGu-changes-from-d0-03-to-d0-04
TGu Timeline Date: Authors: January 2005 January 2005
TGu Timeline Date: Authors: May 2005 May 2005
TGu Timeline Date: Authors: July 2005 July 2005
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
TGu Timeline Date: Authors: July 2005 July 2005
TGr Proposed Draft Revision Notice
TGs March Mid-Week Report
Presentation transcript:

TGn Closing Report – November 05 September 2005 doc.: IEEE 802.11-05/0854r0 November 2005 TGn Closing Report – November 05 Date: 2005-11-18 Authors: Notice: This document has been prepared to assist IEEE 802.11. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.11. Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures <http:// ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair <stuart.kerry@philips.com> as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE 802.11 Working Group. If you have questions, contact the IEEE Patent Committee Administrator at <patcom@ieee.org>. Bruce Kraemer, Conexant Bruce Kraemer, Conexant

November 14-18, 2005 Vancouver Agenda Plan September 2005 doc.: IEEE 802.11-05/0854r0 November 2005 November 14-18, 2005 Vancouver Agenda Plan Agenda Items  Merged proposal Presentation & Discussion, Q&A  1st Confirmation vote Technical Editor Election  Joint proposal group authorized by unanimous vote to continue through end of January interim meeting  Coexistence Assurance status update  Review Timeline Bruce Kraemer, Conexant Bruce Kraemer, Conexant

Major Documents posted for Nov meeting November 2005 Major Documents posted for Nov meeting Submissions 05-1051 r0 JP Opening Report 05-1160 r0 JP Advanced Coding Timeline 05-1165 r1 JP MAC Presentation 05-1095 r2 JP MAC Proposal Text 05-1161 r0 JP PHY Presentation 05-1102 r2 JP PHY Proposal Text 05-1221 r0 JP Closing Report 05-1148 r0 TGn Minutes for Nov meeting Bruce Kraemer, Conexant

January 16-20, 2005 Waikoloa Agenda Plan September 2005 doc.: IEEE 802.11-05/0854r0 November 2005 January 16-20, 2005 Waikoloa Agenda Plan Between now and January Merged proposal draft posted to server & announced on reflector targeted by Monday, Jan 9 (1 week prior to meeting) January Meeting Plan Presentation of full technical proposal & discussion , Q&A 1st confirmation vote, “no” vote explanations & remedies if <75% “yes” Technical editor election and development of draft text in preparation TG-level review of proposal and text in preparation for March WG LB Coexistence assurance status update Review timeline Between now and next plenary No teleconference calls or interim meetings of TGn are requested Bruce Kraemer, Conexant Bruce Kraemer, Conexant

November 2005 End of Closing Report Bruce Kraemer, Conexant