LCLS RF Stability Requirements

Slides:



Advertisements
Similar presentations
Beam-based Measurements of HOMs in the HTC Adam Bartnik for ERL Team, Daniel Hall, John Dobbins, Mike Billing, Matthias Liepe, Ivan Bazarov.
Advertisements

Particle Accelerator Engineering, London, October 2014 Phase Synchronisation Systems Dr A.C. Dexter Overview Accelerator Synchronisation Examples Categories.
R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 LCLS RF Stability Requirements LCLS Requirements The SLAC Linac.
Bunch Length Measurements at the Swiss Light Source (SLS) Linac at the PSI using Electro-Optical Sampling A.Winter, Aachen University and DESY Miniworkshop.
R. Akre XFEL Short Bunch Measurement and July 26, 2004 LCLS Drive Laser Timing Stability Measurements XFEL Short Bunch Measurement.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
RF Synchronisation Issues
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Ron Akre, Dayle Kotturi LCLS LLRF April 16, 2007 Linac.
SLAC XFEL Short Bunch Measurement and Timing Workshop 1 Current status of the FERMI project (slides provided by Rene Bakker) Photoinjector laser system.
Patrick Krejcik LCLS April 7-8, 2005 Breakout Session: Controls Physics Requirements and Technology Choices for LCLS Instrumentation.
Ron Akre, Dayle Kotturi LCLS February 8, 2006 Linac Coherent.
Stefan Simrock 3 rd LC School, Oak Brook, IL, USA, 2008, Radio Frequency Systems 1 Timing and Synchronization S. Simrock and Axel Winter DESY, Hamburg,
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
Siegfried Schreiber, DESY The TTF Laser System Laser Material Properties Conclusion? Issues on Longitudinal Photoinjector.
RF Synchronization Activity at SPARC A.Gallo and D. Alesini, M. Bellaveglia, R. Boni, G. Di Pirro, A. Drago, A.Ghigo P. Baldini, L. Cacciotti, M. Scampati,
Holger Schlarb, DESY Normal conducting cavity for arrival time stabilization.
LCLS-II Linac LLRF Control System – L2, L3 Zheqiao Geng Preliminary Design Review May 7, 2012.
R. Akre RF / Timing August 11, 2004 LCLS Drive Laser Timing Stability Measurements Department of Energy Review of the Linac.
SPPS, Beam stability and pulse-to-pulse jitter Patrick Krejcik For the SPPS collaboration Zeuthen Workshop on Start-to-End Simulations of X-ray FEL’s August.
LLRF ILC GDE Meeting Feb.6,2007 Shin Michizono LLRF - Stability requirements and proposed llrf system - Typical rf perturbations - Achieved stability at.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
1 Franz-Josef Decker 1 Multi-Bunch Operation for LCLS Franz-Josef Decker March 17, Definitions and goals multi-bunch within.
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
P. Krejcik LINAC 2004 – Lübeck, August 16-20, 2004 LCLS - Accelerator System Overview Patrick Krejcik on behalf of the LCLS.
‘S2E’ Study of Linac for TESLA XFEL P. Emma SLAC  Tracking  Comparison to LCLS  Re-optimization  Tolerances  Jitter  CSR Effects.
Sept 16-17, 2003 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Controls.
Ron Akre, Dayle Kotturi Lehman October 24-26, 2006 Linac.
RF low level control & synchronization A. Gallo, M. Bellaveglia, L. Cacciotti SPARC review committee – ENEA Frascati – 16/11/2005.
X-band Based FEL proposal
LLRF 15 Daresbury Andrew Moss ASTeC, STFC Daresbury Laboratory.
SABER Longitudinal Tracking Studies P. Emma, K. Bane Mar. 1, 2006
LCLS_II High Rep Rate Operation and Femtosecond Timing
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
A 6 GeV Compact X-ray FEL (CXFEL) Driven by an X-Band Linac
RF Synchronization Activity
An X-band system for phase space linearisation on CLARA
ILC Phase Reference Distribution R&D
Timing and synchronization at SPARC
RF Synchronisation Issues
LLRF Controls Outline Requirements External Interfaces Schedule Design
Few Slides from RF Deflector Developments and Applications at SLAC
A Portion of the SCP RF Control System LCLS Related
CEPC RF Power Sources System
Low Level RF Status Outline LLRF controls system overview
LLRF Control System Outline Scope Requirements Design Considerations
LCLS Longitudinal Feedback and Stability Requirements
FPGA Based Trigger System for the Klystron Department
LCLS Drive Laser Timing Stability Measurements
Low Level RF Status Outline LLRF controls system overview
Linac/BC1 Commissioning P
LCLS Linac Overview E. Bong Lehman Review August 10, 2004
Linac Coherent Light Source (LCLS) LLRF Preliminary Design Review LLRF Monitor and Control System September 26, 2005 Ron Akre.
Linac Coherent Light Source (LCLS) Low Level RF Status
Linac (WBS 1.2.2) Vinod Bharadwaj April 23, 2002
LCLS Tracking Studies CSR micro-bunching in compressors
Linac Diagnostics Patrick Krejcik, SLAC April 24, 2002
Linac LLP Outline LINAC Long Lead Procurements
Breakout Sessions SC1/SC2 – Accelerator Physics
Undulator Cavity BPM System Status
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Breakout Session SC5 – Control Systems
Operational Experience with LCLS RF systems
Linac Coherent Light Source (LCLS) Low Level RF Status
Low Level RF Status Outline Overview showing hardware instances
Linac Coherent Light Source (LCLS) Low Level RF System Injector Turn-on December 2006 February 8, 2006.
LCLS Longitudinal Feedback System and Bunch Length Monitor Juhao Wu Stanford Linear Accelerator Center LCLS DOE Review, February 08, 2006 LCLS longitudinal.
Enhanced Self-Amplified Spontaneous Emission
Breakout Session SC5 – Control Systems
Analysis of the Phase Drift in the Main Drive Line and L2 Reference Lines along the LCLS Using MATLAB By: Guy Grubbs II.
Presentation transcript:

LCLS RF Stability Requirements LCLS Requirements The SLAC Linac SLAC Linac Stability Data SPPS Measurements LCLS RF System

LCLS INJECTOR / LINAC P. Emma

LCLS Machine Stability Tolerance Budget Lowest Noise Floor Requirement 0.5deg X-Band = 125fS Structure Fill time = 100nS Noise floor = -108dBc/Hz @ 11GHz 5MHz BW -134dBc/Hz @ 476MHz X-band X- RMS tolerance budget for <12% rms peak-current jitter or <0.1% rms final e− energy jitter. All tolerances are rms levels and the voltage and phase tolerances per klystron for L2 and L3 are Nk larger, assuming uncorrelated errors, where Nk is the number of klystrons per linac. P. Emma

LINAC RF and Timing System LCLS must be compatible with the existing linac operation including PEP timing shifts Master Oscillator is located 1.3 miles from LCLS Injector 1.3 Miles to LCLS Injector PEP PHASE SHIFT ON MAIN DRIVE LINE MDL RF with TIMING Pulse – Sync to DR

SLAC Linac RF The PAD measures phase noise between the reference RF and the high power system. The beam sees 3.5uS of RF from SLED cavity which the klystron fills and is then dumped into the accelerator structure.

LINAC RF MEETS ALL LCLS SPECIFICATIONS for 2 Seconds when running well Amplitude fast time plots show pulse to pulse variation at 30Hz. Standard deviation in percent of average amplitude over 2 seconds are 0.026% for 22-6 and 0.036% for 22-7. Phase fast time plots show pulse to pulse variation at 30Hz. Standard deviation in degrees of 2856MHz over 2 seconds for the three stations are 0.037 for 22-6 and 0.057 for 22-7.

LINAC RF is Out of LCLS Specs in 1 Minute Phase 22-6 1.2 Deg pp Amplitude 22-6 0.20%pp Amplitude 22-7 0.43%pp Phase 22-7 1.2 Deg pp 14 minutes data taken using the SCP correlation plot Note that 22-6 and 22-7 are correlated in phase and amplitude They also track the temperature of the water system

Linac Phase Reference System Main Drive Line - 3 1/8 Rigid Coax Anchored to Concrete Floor Every Sector Phase Reference Line - Each Sector Independent ½ inch Heliax MDL 200fS rms / Sector PRL 640fS rms

Phase as Seen by Electron is Difficult to Measure Accelerator Water Temperature Effects on SLED Phase[1] The tuning angle of the SLED cavity goes as:  = tan -1 (2QLT), Where T = L/L = -/ QL= 17000 = 10-5 / F Thermal expansion of copper. =tan -1 (0.34T) Where T is in F. For small T, (S)= 20T(F) The relation between the tuning angle  and the measured output phase of the klystron  varies with the time after PSK with about the following relation:  /  = 0.35 just after PSK (S)= 7T(F)  /  = 0.50 800nS after PSK (S)= 10T(F)  / T~ +8.5 S / F for SLED Cavity Accelerator Water Temperature Effects on the Accelerator Phase[2] The phase change of the structure goes as follows:  =  f Where  = phase through structure  = Angular frequency f = Filling time of structure  =  f = / x f / = -L/L = -T = -10-5 T / F for copper  = -10-5 T / F22856MHz0.84S = -0.15 T rad/F = -8.6 T S / F  / T = -8.6 S / F for Accelerator Structure Water / Accelerator Temperature Variation is 0.1F rms  through structure is 0.86F rms [1] Info from D. Farkas [2] Info from P. Wilson

Phase as Seen by Electron is Difficult to Measure Accelerator Water Temperature Effects on the Phase Through the Accelerator -8.6 S / F SLAC Linac Accelerator Water Temperatures T< .08Frms Phase Variations Input to Output of Accelerator > 0.5ºS-Band rms Single Measurement Can’t Determine the Phase the Beam Sees Passing Through the Structure to LCLS Specifications Feedback on Input Phase, Output Phase, Temperature, Beam Based Parameters (Energy and Bunch Length) is Required to Meet LCLS Specifications

Linac Phase Stability Estimate Based on Energy Jitter in the Chicane BPM SLAC Linac 1 GeV 30 GeV 9 GeV e- Energy (MeV) sE/E0  0.06% Df 21/2 < 0.1 deg (100 fs) P. Emma

Electro-Optical Sampling Timing Jitter (20 Shots) 200 mm thick ZnTe crystal Single-Shot e- <300 fs Ti:Sapphire laser e- temporal information is encoded on transverse profile of laser beam 170 fs rms LASER to BEAM Jitter Adrian Cavalieri et al., U. Mich.

SPPS Laser Phase Jump Tracking R. Akre, A. Cavalieri

SPPS Laser Phase Jump Tracking ~ 200uS Laser Phase Error – Output Phase to Input Reference - Modulated with 1 Hz Square Wave 0.25pS pk Square Wave 2.0pS pk Square Wave

SPPS Laser Amplitude of Phase Transfer Function Phase Modulation placed on RF Reference and measured on Diode at Laser output. During the Blue part of the curve the modulation amplitude was reduced by 12dB to prevent laser from unlocking. Data taken 10/22/03

LCLS Phase Noise Associated Time Referenced to Beam Time LCLS Laser ~200uS Off Scale Below LCLS Gun 1.1uS SLED / Accelerator 3.5uS Phase Detector (Existing) 30nS Distribution System 200nS 1km @ c-97%c=100nS Far Hall Trigger 2uS 3km @ c-80%c=2uS Except for the LASER common mode noise levels below ~100kHz would not cause instabilities – the entire system would track the deviations -3.5us SLED Starts to Fill -2uS Far Hall Trig RF Starts Trip -1.1uS Gun Starts to Fill Beam Time 0 Reference TIME

RF Distribution Phase Noise New Master Oscillator in Linac Front End Less than 25fS rms jitter in Bandwidth from 38Hz to 5MHz R. Akre, K. Schaffold

RF Distribution Phase Noise Integrated Noise - Timing Jitter fs rms Integral end 5MHz 10kHz Integral start 1M 100k 10k 1k 100 10 Master Osc. 18 20 20 20 10 16 PEP Phase 22 26 34 36 120 120 Master Amp 48 54 62 74 136 144 MDL 48 56 62 74 144 152 Sector 30 - 2 miles 54 60 66 76 150 164 Need to lower phase noise in PEP Phase Shifter and Master Amplifier

LINAC SECTOR 20 – LCLS INJECTOR RF Stability < 50fS rms : Timing/Trigger Stability 30pS rms Using LASER as LCLS RF OSCILLATOR is UNDER CONCIDERATION

LCLS RF System – Sector 20 Layout 100ft ½” Heliax = 0.3ºS/ºF Tunnel Temperature < 0.1deg F rms

Beam Trigger for User Facility Single Pulse with 30fS stability (1Hz to 3GHz BW) Tightest Noise Tolerance of LCLS Wide Bandwidth Low Phase Noise 30fS Stability today 10fS Stability tomorrow 1fS The Day After Currently users are expected to use local beam timing measurement, EO, to achieve this.

LCLS RF System Injector RF – FY06 X-Band RF system – FY06 Upgrade of existing system / Lower Noise Timing requirements Injector/L1 Phase Reference System Phase and Amplitude measurement system Solid State Sub-Boosters Beam Phase Monitor System X-Band RF system – FY06 Linac Phase Reference System – FY07 Linac Feedback Control – FY07 Feedback Development – FY07 Far Hall Trigger – FY08

Near Term (6 Month) Tasks Measure Phase Noise of SPPS Laser Lower phase noise in PEP phase shifter and Master Amplifiers Determine Type of RF Phase and Amplitude Measurement System

FY05/06 Tasks and Resources Ready to Ramp Up Start on X-Band system Complete SLAC Linac Front End Upgrades Complete Design of Phase Reference System Complete Design of LLRF Control System Define Beam Phase Cavity Monitor Further Studies on Linac Stability SLAC Klystron Department to Support 75% of RF manpower Manpower available from other SLAC groups (ARDA, ARDB, NLC, and Controls) and LBNL