Seismology programme Structure of the SWG – preparation phase: DAT(T. Appourchaux), Seismic interpretation (G. Berthomieu), excitation and amplitudes (I. Roxburgh), fast Rotation-perturbative (M.J. Goupil), Fast rotation –nonperturbative (M. Rieutord), … 06-… - exploitation phase: -DAT (T. Appourchaux), ESTA (M. Monteiro), B-O stars (C. Aerts), Be stars (C. Neiner), Delta Scuti stars (E. Poretti), Giants (J. De Ridder), PMS (K. Zwintz), … Solar-like puls.(…)
E. Michel COROT-CS 20 – 15/09/06- Paris E. Michel COROT-CS 20 – 15/09/06- Paris Seismology programme Publication policy and N3 products Three type of publications: Type 0: oriented Instrumental - Project team (see doc. Publication Policy 11/09/06) + (data reduction ?) Type 1: data analysis (for each star) N3 productes proposed by the DAT (see doc.in min SC15): oscillation modes parameters (freq., amplitudes, widths, phases, splittings…) – some DAT team + builders as defined in doc. … Type 2: - Modeling and interpretation works: in the hands of Co-Is+teams during priority period (Under CS supervision as define in Publi Policy doc) - Complementary analysis (specific analysis)
E. Michel COROT-CS 20 – 15/09/06- Paris E. Michel COROT-CS 20 – 15/09/06- Paris Seismology - Observation programme CoRoT book (Michel, Deleuil and Baglin): IR01: settled, a list of targets exists. IR02: settled, a list of targets exists LRC1:settled, a list of targets exists SRC1: settled, a list of targets is discussed LRA1: settled, a list of targets exist SRA1: Add Programme, list of targets tbd LRC2: SWG produced a list of targets, position tbc by ECO SRC2: tbd LRA2: SWG produced a list of targets, position tbc by ECO SRA2: tbd LRC3: principal target settled,list tbd SRC3: tbd LRA3: principal target settled, list tbd …
E. Michel COROT-CS 20 – 15/09/06- Paris E. Michel COROT-CS 20 – 15/09/06- Paris Seismology - Observation programme v=6.3 (sol+plan) v=7.9 (sol) v=5.75 (G Dor) v=5.8 (sol) v=9.47 (Ap) v=8 (Vsini=114) v=7 (Vsini=111) v= v=8.4 (Be)