Presentation is loading. Please wait.

Presentation is loading. Please wait.

The Additional Programme

Similar presentations


Presentation on theme: "The Additional Programme"— Presentation transcript:

1 The Additional Programme
3 possibilities to apply for access to CoRoT data within the Additional Programme corresponding to different types of observations: 1 – data from the Core programme 2 – data from specific windows in the seismology and exoplanet field during long runs 3 – data from specific short runs The programme is open to all members of the participating countries AO-1 Answer July 5th, Selection: September 5th2005 AO-n each year 2nd CoRoT Brazil Workshop Ubatuba, November 2005

2 2nd CoRoT Brazil Workshop Ubatuba, November 2005
AO-1 Results * LOI december proposals Remarks from scientific Committee - acceptable for AP or not - cooperation efforts AO-1 july proposals, 28 accepted, 7 phase B - teams gathering the experts in the CoRoT Community - many ask for Core programme data - several ask for specific windows - 7 short runs in Phase B, for complementary studies - feasibility - complementary targets 2nd CoRoT Brazil Workshop Ubatuba, November 2005

3 2nd CoRoT Brazil Workshop Ubatuba, November 2005
Clusters NGC 2264 Dolitze 25 Under study Selected 50 windows Phase B 2nd CoRoT Brazil Workshop Ubatuba, November 2005

4 2nd CoRoT Brazil Workshop Ubatuba, November 2005
AcRoCoRoT 7 To be discussed during this meeting 2nd CoRoT Brazil Workshop Ubatuba, November 2005

5 Exoplanets and binaries
} Dolitze 25 GU Mon DD Mon ? Difficult to reach! V501 Mon ? 2nd CoRoT Brazil Workshop Ubatuba, November 2005

6 2nd CoRoT Brazil Workshop Ubatuba, November 2005
Seismology Presented In this meeting 2nd CoRoT Brazil Workshop Ubatuba, November 2005

7 Extragalactic studies
2nd CoRoT Brazil Workshop Ubatuba, November 2005

8 2nd CoRoT Brazil Workshop Ubatuba, November 2005
Short runs in phase B NGC 2264 46375 SdBs LEDA 85926 46885 All accepted proposals Are in the Anticentre They are in Phase B till March 31th 2006 For priorities Need for proposals of short runs In the Centre 2nd CoRoT Brazil Workshop Ubatuba, November 2005

9 2nd CoRoT Brazil Workshop Ubatuba, November 2005
AO-2 LRa2 and LRc2 (selected at CW10 June 2006) Core programme data Specific windows *Short runs update To be issued next year in fall 2nd CoRoT Brazil Workshop Ubatuba, November 2005


Download ppt "The Additional Programme"

Similar presentations


Ads by Google