Implementation of New Source Review Changes

Slides:



Advertisements
Similar presentations
Fine Particle Health Impacts and the Need for Control Measures in New Jersey Kenneth Fradkin, US EPA Region 2 Air Programs Branch Hearing of the New Jersey.
Advertisements

Transportation Conformity Basics. What is Transportation Conformity? Transportation conformity (conformity) is a way to ensure that Federal funding and.
SUBCHAPTER19. SC 19 Study Where do numbers come from? Re-evaluate the basis of the numbers How would you come up with the numbers today?
Session 6: What do I include in my PM 2.5 conformity analysis? FHWA Transportation Conformity and CMAQ Workshop Summer 2004.
National Implementation Assistance Ideas Reducing Emissions and State SIP Burdens NACAA Spring Membership Meeting, May 19, 2010 Greg Green, Director OAQPS/Outreach.
“Cleaner Air Sooner” South Carolina Department of Health and Environmental Control Bureau of Air Quality.
Status of 8-Hour Ozone NAAQS Program in Clark County Presentation to Air Quality Forum May 10, 2005.
Ozone, PM2.5 and Regional Haze Timeline Dan Johnson Western States Air Resources Council.
Beyond Federal Standards Nevada Mercury Air Emission Control Program Leo M. Drozdoff, P.E. Administrator Nevada Division of Environmental Protection December.
1 Indiana NSR Reform Training Presented by the Office of Air Quality NSR Reform Team.
1 Control Techniques Guidelines Joel Leon September 16, 2011.
Frank Steitz Air Quality Permitting Program 10/12/2012
IOWA Department of Natural Resources Air Quality Program Development Jim McGraw Environmental Program Supervisor  8 hr Ozone and PM2.5 NAAQS Implementation.
Developing a Workplan for Implementing the Strategic Plan for the WRAP Board October 1, 2008.
Development of PM2.5 Interpollutant Trading Ratios James Boylan and Byeong-Uk Kim Georgia EPD – Air Protection Branch 2012 CMAS Conference October 16,
Mississippi Air Update Mississippi Dept. of Environmental Quality September 12, 2012.
Environmental and Clean Air Regulations M IDSTREAM E NERGY L AW C ONFERENCE : M EETING THE D EMAND FOR I NFRASTRUCTURE H OUSTON, T EXAS December 7, 2012.
Air Quality Policy Division D P A Q PM 2.5 Final NSR Implementation Rule Nat’l Tribal Air Assoc. July 16, 2008.
Sound solutions delivered uncommonly well Understanding the Permitting Impacts of the Proposed Ozone NAAQS Pine Mountain, GA ♦ August 20, 2015 Courtney.
1. Carbon dioxide (CO 2 ) – Naturally occurring and man- made. 5,505.2 mmts emitted in 2009, GWP = 1 Methane (CH 4 ) - Naturally occurring and man-made.
HAP Rule 372 Guidance Permitting Division Maricopa County Air Quality Department.
1 SJVAPCD DRAFT SCHEDULES May 2, Hr OZONE ATTAINMENT DEMONSTRATION PLAN PM10 ATTAINMENT DEMONSTRATION PLAN.
Final Clean Air Fine Particle Implementation Rule Briefing for NTAA EPA Office of Air Quality Planning and Standards April 17, 2007.
Jessica Montanez Environmental Protection Agency NEW SOURCE REVIEW (NSR) PROGRAM.
1 OTC Regional Attainment Strategy Danny Wong OTC November 2005 Meeting Wilmington, DE.
How to get Tribal Permitting Authority: Options and Procedures Nancy Mayer U.S. EPA OAQPS.
1 Consideration of Final Rulemaking Clean Air Interstate Rule Environmental Quality Board Meeting Harrisburg, PA December 18, 2007 Joyce E. Epps Director,
NSR and Title V Activities WESTAR Business Meeting May 2005.
MassDEP Response to EPA GHG Initiatives SIP Steering Committee January 13, 2011 Marc Wolman.
Truck Stop Electrification And Air Quality Conformity Presented by Bob Dickinson South East Texas Regional Planning Commission Air Innovation Conference.
Determining Attainment Dates for Different Types of Nonattainment Areas Rich Damberg EPA Office of Air Quality and Standards June 20, 2007.
Western Emissions Budget (WEB) Trading Program: Model Rule, Model SIP/TIP, MOU Bob Lebens, WESTAR Council Air Managers Committee March 19, 2003.
Air Quality Technical Advisory Committee Meeting September 27, 2006 Virendra Trivedi Chief, New Source Review/Title V Section Division of Permits Bureau.
ENVIRONMENTAL PROGRAMS Update on Exceptional Events and MAG Five Percent Plan for PM-10 MAG Regional Council July 28, 2010.
1 Spring Business Meeting Regional Haze SIP Development Survey San Francisco, California April 9, 2003.
Electronic Reporting Tool Ron Myers OAQPS/SPPD/MPG 9/12/2006 Software to Standardize Source Test Planning, Reporting and Assessment and Assessment.
1 MDEQ Air Division Air Update August 6, Mississippi Update Ozone PM2.5 Lead Regional Haze CAIR, CAMR Vacatur Boiler MACT Vacatur Area Source.
Session 3: When Do You Do Conformity? FHWA Transportation Conformity and CMAQ Workshop Summer 2004.
Work Items for §309 SIPs WESTAR Fall Technical Conference September 19, 2002 Tom Moore & Brian Finneran.
Senate Bill 288- Limits Changes to Air Districts’ New Source Review Rules Beverly Werner, Manager Stationary Source Division California Air Resources Board.
1 Four State / EPA Region 7 State Implementation Plan (SIP) Kaizen Process.
Perspective on Contingency Mitigation Options Presented by John Annicchiarico, Senior Engineer August 17, 2015.
Samuel Short, Manager Air Permits Division Texas Commission on Environmental Quality.
Final Omitted Rulemakings Repeals: Employer Trip Reduction; Portable Fuel Container Requirements; and St. Joe Resources Company Emission Limits Environmental.
Regional Haze SIP Template: Mobile Sources Edie Chang California Air Resources Board WESTAR Fall Technical Conference September 2002.
1 Update on New Source Review (NSR) Activities and Priorities for Information Transfer and Program Integration Division April 7, 2004.
Final Rulemaking: 25 Pa. Code Chapters 121 and 139 Measurement and Reporting of Condensable Particulate Matter Emissions Environmental Quality Board Meeting.
Developing a Tribal Implementation Plan
Ozone Redesignation Substitutes for the HGB and DFW Areas
National Ambient Air Quality Standards (NAAQS)
Sources Committee Presentation Spring 2003 WESTAR Business Meeting
Final Rulemaking Nonattainment Source Review 25 Pa. Code, Chapter 121
IMPLICATIONS AND STRATEGIES
Arsenic Acceptable Ambient Level Revision
Clean Air Act (CAA) Purpose
NACAA Permitting Workshop, Chicago June 14, 2011
AIR PERMITTING GUIDANCE
Major New Source Review (NSR) Part 2
GHG Permitting: Regulatory Update
Upcoming projects* to support Regional Haze SIP/TIP planning
U.S. EPA Clean Air Markets Division
New Source Review Update
How to get Tribal Permitting Authority
PM2.5 NSR and Designations
BERCEN Plenary Meeting Budapest, September 9, 2002 Agenda item 4
AGENDA ITEM G.7 electronic Monitoring - Review of Existing and Out-of-Cycle Exempted Fishing Permits (EFPs)   Agenda Item G.7 Supplemental Staff Presentation.
Navajo Nation Minor Source Regulations
Uinta Basin General Conformity
WESTAR Staff Reports Technical Coordinator Report
EPA’s Roadmap for the Second Planning Period
Presentation transcript:

Implementation of New Source Review Changes Western States Air Resources Council Business Meeting September 18, 2003

Some of the Key Issues Adoption of final rules by States and approval by EPA “Do I have to wait until I change my rules to implement the changes?” “Unlike those other states, I clearly have a better, more stringent program……Right?” “I know what equivalent or better means but what does EPA think it means?” Judging equivalence in a case-by-case world Metric will be emission reductions not number of permits required Supplemental environmental analysis When is it going to end? Delegated States trying to be SIP-approved SIP-approved States

More Key Issues Will EPA be updating the draft 1990 NSR Workshop Manual (aka puzzle book) or issuing other kind of guidance? Practical implementation of changes