1 Scheme Combination Product and Labeling Lists. 2 Agenda Scheme Combination Background Task Team 11 Current Update Process Interim Update Process Future.

Slides:



Advertisements
Similar presentations
Economic Development Ad Valorem Tax Exemption Ordinance Presentation to the Orange County Board of County Commissioners February 7, 2012.
Advertisements

2011 ITRS Revision Guidelines1 JAN – MARCH – ITRS TABLES DRAFTS PREPARED –ITWGs and CrossTWG Study Group meet each month with their teams to work Difficult.
Membership & Roster Maintenance Officers Training Workshop September 2012 Kevin Shanahan 1.
Accommodations Updates Carrie Perkis Division of Accountability Services March 9, 2011.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group Part 2: Functional Testing.
1 Lisa Alexander and Helen Dennis April 16, 2008 Data Updates/Data Review Form District Test Coordinator Meeting.
Clinical Management for Behavioral Health Services (CMBHS) Mental Health Implementation Project Update Presented October 9th and 16th, 2012.
Year-end Planning Key Changes Accruals Receiving P-Cards Roles/Responsibilities Handout Year-end calendar 1.
NCOAUG Training Day Summer 2008 Presentation Approve and Send Your Purchase Order via Possible Configuration Options (11i) Presented by Al Kannan,
We have developed CV easy management (CVem) a fast and effective fully automated software solution for effective and rapid management of all personnel.
iStar How to Create an Amendment
WHY YOUR OFFICE IS THE LEVEL IT IS UNDERSTANDING THE PS150 CREATED OVER 30 YEARS AGO.
The Office Procedures and Technology
VC Smart Mail Save time and money by managing all of your posted letters through VC Smart Mail No printing, no stuffing and no stamps!
Using EU-fin Interactive user manual for coordinators (Using EU-fin to the fullest)
Copyright © 2013, Oracle and/or its affiliates. All rights reserved. Insert Information Protection Policy Classification from Slide 12 of the corporate.
SRWG Activity Report (as presented) March 21-23, 2012 TSS Meeting #160 WECC Offices Salt Lake City, Utah Mark Graham, SRWG Chair/David Franklin TSS.
1 DISTRICT ASSEMBLY E- Coordination/Communication OBJECTIVES To maintain online database of all the District members. To ensure website is updated.
OASIS Development Update General Information Session October 13,
Introduction to the Standards for Professional Learning
USG INFORMATION SECURITY PROGRAM AUDIT: ACHIEVING SUCCESSFUL AUDIT OUTCOMES Cara King Senior IT Auditor, OIAC.
20&27 May Agenda 1.Highlight the difference between system flow of e- Invoice and paper invoice – 15 minutes 2.Demonstrate the operation procedure.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
PROCEDURES TO USE TO ESTABLISH STANDARDS DEVELOPMENT COMMITTEES TO REPLACE COMMON CORE'S STANDARDS 1.
Achieving Success as Vice President Public Relations Achieving Success as Vice President Public Relations Club Leadership Training Session.
UMS Submission of PEAR using eTransfer Overview User Security Submit Electronic Transfer Viewing Status of Fund Change Fund Change Reject and Resubmit.
® 1 Mail Prep and Entry Steering Committee Meeting May 14, 2013.
Mailing List Mania An ACEware Webinar April 3, pm.
1 DSCF Entry Discount Review Tampa Bay Suncoast PCC January 14, 2015.
Mail Entry & Payment Technology Agenda  Benefits of IMpb  IMpb Requirements Unique Barcode Shipping Services File (SSF)  Postal Wizard Enhancements.
Background on USPS mail forwarding operations Overview of PARS
Arkansas Department of Education Hope Allen, Director of Assessment
Best Kept Secrets of the NCSC Keeping You in the Know! Speakers: Adam Avrick – Design Distributors Inc Cosmo Infantolino – USPS.
FAST for Periodicals MTAC Workgroup 95 Washington, D.C. November 8, 2007.
Network Rationalization Mail Moves, Labeling Lists and Mail Direction File Industry Webinar July 1, 2013 To listen to a recording of this presentation.
 Computer Fundamentals Introduction to Computers.
Monthly Updates to Presort Data. Agenda What is Presort Data? History of Update Schedule Important Terms to Understand The New Schedule Transition to.
® MTAC 131 Workgroup Update. 2 MTAC 131 Charter Recap MTAC charter:  This workgroup will focus on the issues regarding communicating what separations.
MP Online Data Entry Project Update WMS / ROS August 2013 Troy Anderson.
1 MTAC 117 Intelligent Mail Barcodes and Electronic Documentation Workgroup Update.
1 DELIVERY SEQUENCE FILE 2ND GENERATION WELCOME!!.
Corporate Flats Strategy MTAC November 7, Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.
® MTAC WG #135 Transportation Management Systems (TMS) Combined Data Limitations November 18, 2010.
Standard Mail Sub Group MTAC WG #114 May 7, 2007.
1 FOOTER (10PT. ARIAL, BOLD, GREY, CAPS) TITLE OF PRESENTATION (24PT. ARIAL, BOLD, ALL UPPERCASE) Subtitle (20pt. Arial, Bold, Title Case) Network Rationalization.
MTAC Workgroup 106 Improve, integrate, and optimize data sources… Brian Euclide, Perry Judd’s Inc. Bob Galaher, USPS Marketing Nov 02, 2006 Washington.
1 1 Aeronautical Information Services Brief to AIXM User Group 27 February 2007.
MTAC Workgroup # 87 Update Improving the Drop Shipment Process Washington, D.C. May 18, 2006.
1 FOOTER (10PT. ARIAL, BOLD, GREY, CAPS) TITLE OF PRESENTATION (24PT. ARIAL, BOLD, ALL UPPERCASE) Subtitle (20pt. Arial, Bold, Title Case) Network Rationalization.
Communications Subcommittee Report 2010 JPC Nashville, TN July 27, 2010 Barbara Leary, Chair Mike Fisher, Vice Chair James Clarke Amy Gerards Allan Dokhan.
MTAC Workgroup #87 - Update Improving the Drop Shipment Process August 3, 2006.
The Countywide Zoning Dataset AIMS Coordinators Meeting 1/15/2004.
® Service Standards and Performance Measurement MTAC Workgroup 114 Status Report.
Workgroup # 120 Communicating Entry Requirements/ In-Home Delivery Dates Solutions/ Seasonality Impacts INDUSTRY CO-CHAIR DALE MILLER POSTAL CO-CHAIR CHRIS.
On Site Review Process. 2 Overview of On Site Review Materials and Process.
Planning Matrix Step-by-Step Guide Office of Data Analytics Institutional Research.
March 24, 2010 Sunflower Project Monthly Conversion Meeting – March.
TPTF CIM Health Check Raj Chudgar Program Director for Market Redesign.
ORIS SAGE Release Plan Overview System to Administer Grants Electronically Monthly Research Administrators Meeting Jennifer Dobbelaere January 14, 2010.
Accreditation (AdvancED) Process School Improvement Activities February 2016 Office of Service Quality Veda Hudge, Director Donna Boruch, Coordinator of.
2016 TELPAS Online Testing. TELPAS Assessment Management System Accessed at
2012 TELPAS Online Testing & Data Collection. Disclaimer  These slides have been prepared by the Student Assessment Division of the Texas Education Agency.
A Joint USPS/NALC Agreement for an Expedited Route Evaluation and Adjustment Process Allows Swift Reaction to Unprecedented Volume Loss –Quick, Simple,
Locational Net Benefit Analysis Working Group June 1, am – 3 pm Webinar drpwg.org.
2016 TELPAS Online Testing & Data Collection. Disclaimer  These slides have been prepared by the Student Assessment Division of the Texas Education Agency.
1 MTAC WG #175 Update for Northeast Area Focus Group May 4 th,
Omnibus Rate Case Implementation Pricing and Classification Implementation Pricing and Product Design, USPS - HQ.
WHY YOUR OFFICE IS THE LEVEL IT IS
Integrity - Service - Innovation
McKinney-Vento Homeless Directors Meeting
Presentation transcript:

1 Scheme Combination Product and Labeling Lists

2 Agenda Scheme Combination Background Task Team 11 Current Update Process Interim Update Process Future Update Process ELLS Background Submission Schedule Submission Form

3 City State Product Background The City State product contains five (5) separate products –City State Detail –Alias –Scheme Combinations –Seasonal ZIP Codes –Zone Split

4 Scheme Combinations Product File Contains a listing of 5-digit ZIP Code groupings Processed and finalized on the same piece of equipment at the same time at plants and delivery units Mailers use this data product to qualify for 5-digit automation rates

5 Task Team 11 Review current release cycle for data products specifically: –Labeling Lists –Zone Charts –Mail Direction File Review current process for file dissemination and make changes to release cycle to align with operational needs –Developed a structured release cycle for data products disseminated to the mailing industry –Created L012 labeling list for scheme combinations and remove from AMS product file

6 Scheme Combination Current Update Process In-Plant Support determines what ZIP Codes can be sorted together on the same sort plan –Sends information to AMS District AMS enters ZIP Code combinations in AMS –ZIP Code – Combination Maintenance Changes released in scheme combination product file on pre-defined release cycle

7 Scheme Combination Interim Update Process Current AMS process will remain same –In-Plant Support will communicate changes to District AMS office –District AMS will input changes into AMS system Network Operations will receive file from AMS of scheme combination updates AMS will continue to publish files in City State Product Network Operations publish data in new L012 labeling list –Based on structured release cycle –Process will continue through 2012 –AMS will suspend its process in July 2013

8 Scheme Combination Final Process Local In-Plant Support will submit changes via form to ELLS coordinator at Area Distribution Networks Office Area will review form and submit to Network Operations Network Operations will review If approved, Network Operations will inform ELLS coordinator to input change into ELLS system Changes will be reflected in L012 labeling list –Published on a pre-defined schedule

9 ELLS Background Automated system that maintains external label list that are published in Postal Explorer Generates label lists updates that are sent to downstream stakeholders –Postal Explorer –NCSC Disseminates product files sent to mailers –System enables ELLS coordinator personnel to input changes to labeling lists

10 ELLS Coordinator Area representative that manages labeling list changes –Interfaces with local site to identify necessary changes –Interfaces with area counterparts to determine best timing for labeling list changes Responsible for adhering to the submission schedule developed by Network Operations Makes changes to labeling list entries in ELLS system

11 Labeling List Structured Release Cycle 2012 Labeling List Submission Schedule 2013 Labeling List Submission Schedule

12 Labeling List Change Submission Form

13 Questions?