FPSO Mooring Monitoring & In-service Inspection FPSO Research Forum Richard Leeuwenburgh College Station – May 1 st 2003.

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

Lubrication – Getting it Right Nick Thomas North Sea & Caspian Sales Manager 11 February 2004 at 1500.
Gas Plant Operation and Maintenance Overview Presented by Geoff Vail.
Safety Integrity Teamwork Excellence April 7, 2011 Forehead/Eye Laceration at B1244 Annex IRIS # S Classification: OSHA Recordable.
Why conduct supplier accreditation assessments? Executive Accreditation Specialists (Pty) Ltd November 2010.
 Without reference, identify principles relating to Fixed Radiological X-RAY PM with at least 70 percent accuracy.
®.
Self Installing Wind Turbine (SIWT) Mark Riemers – Managing Director.
Cooling Tower Maintenance Training.
Steam Generation – Operational Flexibility and Lifetime Extension Considerations Kevin Murray Senior Integrity Engineer Marsh Power Forum – Istanbul, October.
SHIPYARDS: Differences between Tankers and FPSO Specification
Crack Management – Part II Feedback From In-Service Inspections Based upon OTC “FPSO Fatigue Assessment: Feedback From In-Service Inspections” Clemens.
(Adapted from:D.T. Hall:Practical Marine Electrical Knowledge)
FPSO Research Forum Forum Discussion OTRC, College Station USA April 2003.
Shipbreaking Module 4: Heavy Equipment & Material Movement
Cosalt/Bexco Offshore Mooring Systems Single Point Moorings Mark Brooks IEng MIIE Business Development Manager for operational performance, reliability,
Rigging Equipment for Material Handling Your Safety is the #1 Priority
UPDATE: NEW REQUIREMENTS FOR COMMERCIAL FISHING INDUSTRY VESSELS Coast Guard Authorization Act of 2010 (Public Law ) UPDATE: NEW REQUIREMENTS FOR.
GCAA Management Workshop Paul C. Atkins, 2/18/09 Paul C. Atkins, 2/18/09.
COURSE IN CP INSPECTION METHODS
1 Cranes Module 13. 2Objectives After this module you should be able to – identify the most common crane hazards – take the necessary steps to avoid those.
Edit this text for your title Edit this text for your sub-title Presenter name, location, date etc. MEK 4450 Marine operations Kværner ASA, UiO, Oct
Cargo Gear Survey … …………………......……………... ILO 32 ………………….…..……………………………. ILO ………………………………... TNS 15 Regulations.
PIPELINE ENGINEERING COURSES DISTANCE LEARNING 12 WEEKS DR. ESAM AM AL-MATOUQ.
Alternative compliance program
No Offshore Wind Farm Without Certification European Offshore Wind Conference Dipl.-Ing. Matthias Laatsch Dieser Platz ist für Ihr Bild vorgesehen.
FABRICATION OF BLOCKS OWNERS REQUIREMENT DESIGN CLASSIFICATION SOCIETY
Classification Societies – Contribution to Martime Safety Gesa Heinacher-Lindemann LL.M., Legal Director.
THE SIMPLE TRUTH about the Gender Pay Gap. The pay gap is a comparison between women’s and men’s typical earnings. It can be compared by weekly earnings.
Cosalt/Bexco Offshore Mooring Systems Shell Buoy Mooring Workshop Single Point Moorings Mark Brooks IEng MIIE Business Development Manager 29 th March.
Crack management Clemens van der Nat Bluewater Energy Services BV.
Innovative Technologies, Creative Solutions Turret Mooring Design – Some Challenges and Solutions FPSO Forum 2004 NUS, Singapore Arun Duggal FMC SOFEC.
BVN BVN TM PEV2 – Boilers Head Office – Department Technology Equipment - V0 – November 2009.
PRESENTS.
Vessels ROVs & suport toolings special machines ROV multi-tasking conclusions VLV T Workshop Enabling technologies for deepwater operations Amsterdam,
© 2012 MISTRAS GROUP, INC. ALL RIGHTS RESERVED. DISSEMINATION, UNAUTHORIZED USE AND/OR DUPLICATION NOT PERMITTED. TankReporter 2.0 A Step by Step Example.
High strength materials are being increasingly used in designing critical components to save weight or meet difficult service conditions. Unfortunately.
Edit this text for your title Edit this text for your sub-title Presenter name, location, date etc. MEK 4450 Marine Operations Kværner ASA / DNV, UiO,
Industry Fundamentals and Occupational Safety Unit 6
Marine Services Condition Assessment Condition Assessment © 2003 Lloyd’s Register of Shipping.
Guided Wave Testing Method
FPSO Experience Database JIP FPSO Research Forum 16 October 2002 Santiago de Compostela, Spain Robert SpongABS Consulting Presented by:
Tony Keane Executive Director Lou Vincent President NACE International Tripartite Conrad Hotel Tokyo, Japan September 2007 Coatings Inspection &
1 TMR4225 Marine Operations, Lecture content: –Hugin operational experience –Other AUVs Urashima Munin –ROV classes and mission objectives –Minerva.
PHASE 7 FACILITIES ENGINEERING
Standards, Training, and Certifications in the Marine Coatings Industry Presented by: Earl Bowry.
Assessment of offshore wind turbines support structures within a reliability based framework 1 Dr Athanasios Kolios Research Fellow, Risk and Reliability.
What? Deployment of the first full KM3NeT string, a.k.a Detection Unit. Thanks to Aart Heijboer for the nice drawings!
 FPSO — floating production, storage, and offloading systems; offloading of the crude oil to a shuttle tanker;  These are typically converted or newly.
Fatigue Analysis in ASME B31.3 Piping
Prof.V.M.Mohamed Ali Ship Registration and Classification.
Chapter 1 Questions and Answers. 1. How long have you worked on board? I have worked on board for ---years. I have worked on board for ---years. ( I have.
And Maintenance Technologies For Air Disc Brake Equipped Vehicles
Level II Inspection.
Mould Maintenance Presented By S.K Mandal.
Introduction to Bridge INspection
Dropped Objects 12 April 2011.
Service reference ABU DHABI, United arab emirates IND 36 months
Tribology at Vattenfall R&D
1.6 Allowable Stress Allowable Load < Failure Load
Crane safety and inspections
EXPORT SUMMIT - Durban Jean Michel Marnoto VP Global Key accounts
From AS :   Part 4— Commissioning, operation and asset management
In-Service Inspection German Experiences
Bearings Relative Bearings.
Overview of SHAllow WAter Initiative (HAWAI JIP)
LF856 2½”-10”.
Quality Regulation for Mechanical Equipment RESSQ – Mech
BEARINGS.
Presentation transcript:

FPSO Mooring Monitoring & In-service Inspection FPSO Research Forum Richard Leeuwenburgh College Station – May 1 st 2003

n Typical Classification Requirements n Bluewater Experience Contents

n ABS – Guide For Building and Classing Floating Production Installations n Bureau Veritas – Rules for the Classification of Offshore Units n DnV – Classification of Offshore Units n Lloyds Register – Rules and Regulations for the classification of a floating offshore installation at a fixed location Sources

General Requirements n Annual Survey Visual Inspection of critical components n Check for excessive corrosion and abrasion n Check mooring line angles n Bearing n Special Survey (3-5 year intervals) NDT on critical components n Joining shackles n Links at chainstoppers n Marine Growth n Sea-bed condition

General Requirements n Monitoring No real requirements unless design relies on it (Safety case) System is proof loaded and checked after installation

Bluewater Experience n 2 Opportunities on North Sea FPSOs for in-service inspection –NDT tests were executed (on deck of supplier) –Thickness measurements taken –No abnormal wear/corrosion observed –Thickness measurements are now reference

Bluewater Experience n ROV Surveys (annually) –No excessive abrasion/corrosion found –No change in pre-tension angles –Missing safety pins in link plates –Trenches at touchdown areas

Bluewater Experience n Monitoring –North Sea : All lines are equipped with inclinometers/proximity switches –Brasil : Tension measurements –All : Position measurements