ACI/GM/3011/1.0 ACI's Portable ATN Software Products & Services Technology for next-generation aviation data communication… Presented by Forrest Colliver.

Slides:



Advertisements
Similar presentations
Competency-Based Training Solutions in a non-standardized world APATS September 2009 Capt. Kris Van den Bergh Vice-President Pilot Provisioning.
Advertisements

GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
U.S. Plans for ADS-B Briefing for
NEXCOM Next Generation Air/Ground Communications AEEC General Session December 2001 Jim Eck Air/Ground Communications Product Team Lead.
1 C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE PHARE Aeronautical Telecommunication Network: PATN By Gérard Mittaux-Biron PATN Project Leader CENA.
ATN99 International ConferencePage September 1999 London ATN99 INTERNATIONAL CONFERENCE September 1999 London Paul Hennig, United Airlines.
ATN 99 Service Technique de la Navigation Aérienne 1 ATN Activities & Plans ATN in FRANCE FOR SAFETY REASONS MAIN FUTURE DATA/LINK ATSC WILL BE ATN.
The Future of PETAL Technology
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
Upgrading the Oracle Applications: Going Beyond the Technical Upgrade Atlanta OAUG March 19, 1999 Robert Cooney.
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
VHF Digital Link Mode 2 Deployment Strategy Vic Nagowski
Mission Trajectory Step 1 From planning to deployment.
AIM Operational Concept
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
2009 – E. Félix Security DSL Toward model-based security engineering: developing a security analysis DSML Véronique Normand, Edith Félix, Thales Research.
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Air-Ground Data Link - DFS Strategy
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
18-19 September 2001ATN2001 (London)1 A Commitment to ATN Implementing Aeronautical Data Link Today Presented by Kevin Wohlers ACI Program Manager.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
ATN 2002 London September 2002 Presented by Aloke Roy Authors: Christophe Hamel Tom Judd Ketan Nguyen Bryan Rowe Kevin Wohlers ATN AIRBORNE IMPLEMENTATION.
Sixth Hour Lecture 10:30 – 11:20 am, September 9 Framework for a Software Management Process – Artifacts of the Process (Part II, Chapter 6 of Royce’ book)
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/2012/ASBU/Nairobi.
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
© 2004 Visible Systems Corporation. All rights reserved. 1 (800) 6VISIBLE Holistic View of the Enterprise Business Development Operations.
1 Samples The following slides are provided as samples and references for the Quarterly Reviews Additional slides will be added.
1 ITC242 – Introduction to Data Communications Week 12 Topic 18 Chapter 19 Network Management.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-25/PIA-2 Increased Interoperability, Efficiency and Capacity through.
How the PETAL Trial Relates to the FAA’s CPLDC Program ATN 2001 Focus on the Reality of Data Link IEE London, England 18 September 2001 Gregg Anderson.
ATN Subnetwork Implementation:
Effective Methods for Software and Systems Integration
Next Generation Air/Ground Communications (NEXCOM) Presented to ATN 2002 London, England 25 September 2002 James H. Williams Communications Integrated.
Weather-in-the-Cockpit Vision
CLEANROOM SOFTWARE ENGINEERING.
The Challenge of IT-Business Alignment
Federal Aviation Administration Federal Aviation Administration 1 Presentation to: Name: Date: Federal Aviation Administration AMHS Security Security Sub-Group.
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
26-27 September 2000ATN2000 (London)1 Certifiable Software for the ATN Making ATN a reality…now… Presented by Forrest Colliver ACI General Manager.
1 EUROCAE EUROCAE Dedicated to Aviation Standardisation ASAS Standards: “From concept to equipment” David Bowen (Technical Secretary) April 24 th 2007.
OOI CI LCA REVIEW August 2010 Ocean Observatories Initiative OOI Cyberinfrastructure Architecture Overview Michael Meisinger Life Cycle Architecture Review.
CHECKPOINTS OF THE PROCESS Three sequences of project checkpoints are used to synchronize stakeholder expectations throughout the lifecycle: 1)Major milestones,
International Data Link Symposium st October 2003, Newbury, UK FEASIBILITY STUDY FOR CIVIL AVIATION DATA LINK FOR ADS-B BASED ON MIDS / LINK16 Bob.
Presented by Philip Clinch on 27 September 2000 at ATN 2000 Aeronautical Telecommunications Services.
© 2009 Cisco Systems, Inc. All rights reserved. ROUTE v1.0—1-1 Planning Routing Services Creating an Implementation Plan and Documenting the Implementation.
An organizational structure is a mostly hierarchical concept of subordination of entities that collaborate and contribute to serve one common aim... Organizational.
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
LINK EEC Test Facility - ATN 2003 London 1 LINK Test Facility Overview Located at EEC Bretigny - France In support to LINK EATMP project.
Workshop on preparations for ANConf/12 − ASBU methodology
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Workshop on preparations for ANConf/12 − ASBU methodology
NEXCOM Next Generation Air/Ground Communications
Workshop on preparations for ANConf/12 − ASBU methodology
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/19
Presented by Thales Avionics ATN 2003 London, UK September 2003
AIM Operational Concept
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
NEXCOM Next Generation Air/Ground Communications Appendix G
Ground based ATN Router Requirements
BU IS GIG Chemical, Oil & Gas
Workshop on preparations for ANConf/12 − ASBU methodology
Engineering Processes
Safety & Security of future SATCOM based Aviation Data Links
Presentation transcript:

ACI/GM/3011/1.0 ACI's Portable ATN Software Products & Services Technology for next-generation aviation data communication… Presented by Forrest Colliver ACI General Manager

ACI/GM/3011/1.0 Presentation Overview Aeronautical Communication International LLC Who is ACI and what do we do? What are ACIs ATN products & services? ACIs contributions to ATN deployment… Standards-based Portable ATN Protocol Software Product Integration, Deployment & Support Services Network Management Capabilities Quality Assurance & Certification/Approval Support

ACI/GM/3011/1.0 Aeronautical Communication International LLC ACI was formed in 1997 by five suppliers of airborne and ground-based aeronautical software, equipment and services From 1997 to-date, focus has been: ATNSI Router Project Support (RRI) Complementary Application/Management Software ATN standardization support (AEEC, IATA & ICAO) FAA CPDLC Program Support EUROCONTROL Petal II Program Support

ACI/GM/3011/1.0 Scope & Charter of ACI To bring to market portable, cost-effective and interoperable Aeronautical Telecommunication Network (ATN) software products meeting aviation communication infrastructure & application needs To complement these products with portation, integration, consultation, training and lifecycle-support services To support standards-based ATN deployment

ACI/GM/3011/1.0 ACIs status today… Activities now in progress: Developing Router Reference Implementation (RRI) software under contract to ATN Systems, Inc. (ATNSI) Developing ACIs own complementary Application Service Element (ASE) & Network Management (NM) software Packaging turnkey ATN product/service offerings ACI offers full product lifecycle support For ATNSIs RRI product… For complementary ACI products (e.g. ASE, NM)… Integration, product evolution, consultation and training services ACIs fully-supported ATN protocol products will be available from 1Q2000

ACI/GM/3011/1.0 ACIs Products and Services Product Overview Portable ATN software products Designed to international and industry standards (ICAO, AEEC, etc.), and designed for ease of portability to multiple platforms Both ground-based & airborne products available Design assurance via RTCA DO-178B & MIL 498B Integrated software/systems packages Both ground-based & airborne systems available Licensed to OEMs and end-users

ACI/GM/3011/1.0 ACIs Products and Services Product Availability Portable ATN Software: from 1Q 2000 Air Traffic Service (ATS) Applications Context Management (CM) Controller-Pilot Data Link Communication (CPDLC) Automatic Dependent Surveillance (ADS) Flight Information Services (FIS) Aircraft Operational Communication Services (AOCS) Air/ground & ground-based subnetwork access enabled Integrated Software Packages: from 2Q 2000 Integrated Ground Systems: from 3Q 2000

ACI/GM/3011/1.0 ACIs Products and Services Product/Service Portfolio RRI CPD LC CMADSFISNMAAO CS BIS ES Portable ATN Software Integrated Software & Systems l Integrated & Turnkey versions available l Pre-ported for real-time OS application l Turnkey Unix based platforms Lifecycle Support l System definition l Extended Warranty l On-site support l Training l ATS End System l AOC End System l Air/Ground Router l Ground Router

ACI/GM/3011/1.0 ACIs Products and Services Product Features (1 of 2) ACIs products conform to ICAO Doc 9705 and industry (AEEC) ATN standards High degree of software portability Streams-based, designed for portability Designed for single-task or multi-task environments Software Quality & Design Level Assurance RRI/ASE developed essential DO-178B Level C Supplied with certification support artifacts

ACI/GM/3011/1.0 ACIs Products and Services Product Features (2 of 2) Reduced Integration & Interoperability Risk Products (RRI & ASE) warranted to interoperate in peer airborne & ground-based implementations ASEs integrate seamlessly with RRI-based implementations Software packages supplied pre-integrated Full Product Lifecycle Support Product life consistent with aeronautical needs Configuration control & update/change management throughout entire product lifecycle

ACI/GM/3011/1.0 ACIs Products and Services Extended Warranty Support Starts after initial warranty, and includes: Software updates & upgrades Direct engineering support Extended warranty response levels: RL1: Telephone hot line & same day first-aid RL2: Response within 36 hours, technical analysis & error correction start within 7 days, patch when error corrected RL3: Response within 7 days, technical analysis & error correction start within 30 days, correction by software release

ACI/GM/3011/1.0 ACIs Products and Services Training & Consultancy Services Training Offered at systems integrator & end-user levels ATN concepts & Protocols Network Management Consulting System Architecture & Implementation Design Assurance, Methodology & Certification Integration & Test Support Financial and Cost/Benefit Analyses

ACI/GM/3011/1.0 Network Management and the ATN (1 of 3) Current Industry Situation: Neither industry nor ICAO standards baseline yet available But, operational need identified for management of initially deployed ATN, based on telecommunication industry experience ACIs approach to problem… Meet near-term needs (1Q 2000) for managed prototype ATN routers, offering ProATN-compatible NM products Meet mid-term needs (4Q 2000) for managed operational ATN routers, offering RRI-compatible NM products Address longer-term needs (2001+) for managed ATN ground- based and airborne systems by supporting government/industry requirements definition process

ACI/GM/3011/1.0 Network Management and the ATN (2 of 3) Phase 1a (1998) Completed Phase 1 MIB produced as result of industry collaboration Phase 1 MIB Features & Functions Fault, Performance, Security, Configuration & Accounting Functionality consistent with ProATN & RRI/ASE capabilities Phase 1b (1999) In Progress NMA-1P: ATN Prototype Network Management Agent Developed for & integrated with ProATN Router by ACI Methodology consistent with that of ProATN Managed via NMS-1P, developed by ProATN Consortium Validate network management concept in ProATN context

ACI/GM/3011/1.0 Network Management and the ATN (3 of 3) Phase 2 (2000+) Planning Stage Develop Phase 2 concept of operations (CONOPS) Incorporate operational safety assessment Define design assurance level consistent with application Define architectures (air/ground) based on CONOPS Upgrade NMA-1P to interface with RRI Develop Phase 2 air & ground components Network Management Agents Managers

ACI/GM/3011/1.0 Software Quality & ATN Considerations (1 of 2) ATN architecture created for support of safety-critical ATS and AOC applications Controller/pilot communications (ATS), e.g. clearances Controller/controller communications (ATS), e.g. handoff Airline dispatch/pilot communications (AOC), e.g. re-routing How? Integrity Assurance via protocol design what is received is what was sent Enhanced Availability via routing architecture information transferred end-to-end in a timely manner

ACI/GM/3011/1.0 Software Quality & ATN Considerations (2 of 2) Safety-critical application of ATN protocols demands software design & quality assurance consistent with Essential systems Rationale: undetected integrity/availability failures may cause unacceptable dispatch/controller/pilot work-load RTCA DO-178B provides software development guidelines for Level C, to meet Essential systems requirements ACIs approach to problem… To ensure ATN software mission-readiness…all ACI RRI/ASE software conforms to DO178B Level C guidelines

ACI/GM/3011/1.0 Software Quality & ATN Results (1 of 2) Result: software products meet requirements Airborne systems require DO-178B Level C software ATS ground systems recommend or require DO-178B Level C software AOC ground systems require mission-critical treatment; DO- 178B Level C meets this requirement Result: reduced lifecycle cost to user Formalized nature of DO-178B Level C development process leads to high overall product quality Process facilitates change management & lifecycle support

ACI/GM/3011/1.0 Software Quality & ATN Results (2 of 2) Result: comprehensive verification & validation Production of required artifacts demonstrates compliance and supports users of software products Full traceability of functions to design, to code, and to test Full functional test coverage Verifies that all functions have been tested Full structural test coverage Verifies that all code is executed Result: reduced end-to-end integration risk Development of airborne and ground-based software to common standards reduces interoperability risk

ACI/GM/3011/1.0 In summary… ACI has been working since 1997 in support of global ATN deployment for the new millennium To this end, ACI is developing a line of lifecycle supported ATN software, along with integrated software packages and turnkey ground systems ACI continues to work aggressively with ATN stakeholders to address ATN deployment challenges, including issues of network management, certification, and design level assurance standardization

ACI/GM/3011/1.0 For more information… Contact… Forrest Colliver, General Manager Bob Kerr, Marketing & Communications Or, visit the ACI web site at…