SPE 113975 The Potential For Additional Carbon Dioxide Flooding Projects in the United States SPE 113975 April 23, 2008 Hitesh Mohan – INTEK, Inc. Marshall.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Permian Basin Overview
APPA CEO Roundtable Phoenix, AZ March 15, 2011
Fill in missing numbers or operations
1
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
UNITED NATIONS Shipment Details Report – January 2006.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
16 th April 2008 Energy Outlook View of an International Oil Company Thierry PFLIMLIN President & CEO Total Oil Asia-Pacific Pte Ltd 2 nd ARF Seminar on.
This presentation includes forward-looking statements. Actual future conditions (including economic conditions, energy demand, and energy supply) could.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
CALENDAR.
0 - 0.
1 1  1 =.
1  1 =.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt FactorsFactors.
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
ZMQS ZMQS
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
Risk Management and Optimal Contract Structures for the CCS-EOR* Value Chain Anna Agarwal, John E. Parsons Center for Energy and Environmental Policy Research.
PP Test Review Sections 6-1 to 6-6
ABC Technology Project
Technologies for CCS on Natural Gas Power Systems Satish Reddy April 2104.
The Costs and Benefits of Carbon Capture and Storage Khosrow Biglarbigi Hitesh Mohan Marshall Carolus INTEK July 16, 2009 Calgary, Canada.
VOORBLAD.
Effects on UK of Eustatic sea Level rise GIS is used to evaluate flood risk. Insurance companies use GIS models to assess likely impact and consequently.
© 2006 Prentice Hall, Inc.8 – 1 Operations Management Chapter 8 – Location Strategies © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render.
© 2006 Prentice Hall, Inc.8 – 1 Operations Management Chapter 8 – Location Strategies © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
8.4 Percent Concentration
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Squares and Square Root WALK. Solve each problem REVIEW:
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
Adding Up In Chunks.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Coal to Liquids Plant Site Selection in WV Douglas G. Patchen October 25, 2007.
Before Between After.
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Subtraction: Adding UP
Test B, 100 Subtraction Facts
1 Atlantic Annual Viewing Trends Adults 35-54, Total TV, By Daypart Average Minute Audience (000) Average Weekly Reach (%) Average Weekly Hours Viewed.
Week 1.
Number bonds to 10,
We will resume in: 25 Minutes.
Converting a Fraction to %
PSSA Preparation.
Potential for Oil Shale Development in the United States
Energy Year 2014 Electricity Finnish Energy Industries.
© 2006, François Brouard Case Real Group François Brouard, DBA, CA January 6, 2006.
Presentation transcript:

SPE The Potential For Additional Carbon Dioxide Flooding Projects in the United States SPE April 23, 2008 Hitesh Mohan – INTEK, Inc. Marshall Carolus – INTEK, Inc. Khosrow Biglarbigi – INTEK, Inc. INTEK Presented at the 2008 SPE/DOE Symposium on Improved Oil Recovery

SPE CO 2 EOR: A Proven and Established Technology Technology applied for nearly 30 years In 2006, 80 projects in the United States Daily production reached 234 MBbl/Day Active CO 2 EOR Projects Daily CO 2 EOR Production

SPE How Can It Become More Widespread? Two Constraints CO 2 Sources & Candidate Fields

SPE Existing CO 2 Sources Annual CO 2 Produced: 1094 Bcf/yr (60.81 MMtn/yr) Or ~ 3 BCF/Day Daily Rate MMCF/D Wyoming Colorado Jackson DomeDenbury-JacksonMississippi220 CortezTexas1,300 McElmo CreekUtah60 Sheep Mountain Dome Sheep MountainTexas480 Bravo DomeBravoTexas482 Val Verde Gas PlantsVal VerdeTexas70 Oklahoma Fertilizer Plant Total Daily Rate2,997 LaBarge 350 SourcePipelineStates Supplied 35 McElmo Dome Local PipelineOklahoma Oil and Gas Journal

SPE Delivered CO 2 Costs Cost is dependant upon oil price Capture costs are minimal Mostly transportation Regional prices range from $1.41 to $2.82

SPE Potential CO 2 Sources: Industrial Industrial CO 2 emissions have grown more than 20% since 1990 In 2006, the U.S. industrial CO 2 emissions were more than 100 Tcf Significant volumes can be captured and used for EOR Industrial CO 2 Emissions 20% Increase

SPE Industrial Sources of CO 2 Source: Natcarb, RFA, INTEK

SPE Not Every Source Can Be Used for EOR Sources need to be screened according to –Concentration –Emission Volume –Proximity to candidate fields A database of screened sources was developed Approximately 25 Tcf could be captured and transported annually - Can we meet the CHALLENGE ?

SPE Screened Industrial Sources

SPE How Much Will Industrial CO 2 Cost? CO 2 Price = Cost of Capture + Pipeline Tariff Capture cost is dependent upon technology Pipeline Tariff depends upon distance of candidate fields to source

SPE Cost of Capturing Industrial CO 2 Capture technology are source specific Capture Cost Sources: Global Energy Technology Strategy Program, NETL, and others

SPE Where are the CO 2 EOR Candidate Fields?

SPE How Close are the Sources to the Fields?

SPE Identifying source to sink distances GIS was developed to locate source to sink Average distances for various source to a group of sinks were calculated Pipeline tariffs were estimated based on: –Distance –Volume of CO2 –Compression

SPE Industrial CO 2 Could Cost… CO 2 Price = Cost of Capture + Pipeline Tariff Capture cost is dependent upon Source –$0.50 to $2.81 per Mcf Pipeline Tariff depends upon distance of candidate fields to source –$0.39 to $0.51 per Mcf

SPE Total Wellhead CO 2 Prices & Volumes 3,082 Bcf/Yr ($3.2-$3.2 Mcf) 961 Bcf/Yr ($0.9-$3.2 Mcf) 1,178 Bcf/Yr ($1.0-$3.2 Mcf) 13,739 Bcf/Yr ($0.9-$3.2 Mcf) 5,557 Bcf/Yr ($0.9-$3.2 Mcf) 223 Bcf/Yr ($1.0-$3.2 Mcf) 1,034 Bcf/Yr ($1.0-$1.0 Mcf) Total Volume of CO 2 Available Wellhead Prices (Capture + Transportation) Industrial CO 2 : 25 Tcf/Yr Natural CO 2 : 1 Tcf/Yr 3,082 Bcf/Yr ($2.8-$3.2 Mcf) 961 Bcf/Yr ($0.9-$3.2 Mcf) 1,178 Bcf/Yr ($1.0-$3.2 Mcf) 13,739 Bcf/Yr ($0.9-$3.2 Mcf) 5,557 Bcf/Yr ($0.9-$3.2 Mcf) 223 Bcf/Yr ($1.0-$3.2 Mcf) 1,034 Bcf/Yr ($1.0-$1.50 Mcf) Total Volume of CO 2 Available Wellhead Prices (Capture + Transportation) Industrial CO 2 : 25 Tcf/Yr Natural CO 2 : 1 Tcf/Yr

SPE When Will the CO 2 Be Available? Availability and ultimate market penetration depends on : –Source –Technology –Location Sample Market Development Curve

SPE Incremental Production 25 Year Cumulative Production: 4.7 Billion Bbl Daily Oil Production from Additional CO 2 EOR

SPE Impact of Injection Volume on Production 0.4 HCPV 1.0 HCPV Daily Oil Production from Additional CO 2 EOR

SPE Additional benefit: CO 2 Storage Daily CO 2 Stored in Projects 0.4 HCPV 1.0 HCPV

SPE Summary CO 2 EOR is a mature technology Widespread application is constrained by availability of CO 2 and candidate fields Nearly 25 Tcf of Industrial CO 2 can be captured and transported to nearby fields There are 1,673 candidate fields in Onshore Lower 48 Prices at the wellhead could range between $1 and $3 per Mcf Up to 1.2 MMBbl/Day of incremental production could be realized in all regions of the U.S. Up to 5.5 Bcf/Day of CO 2 could be stored at the same time