July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.

Slides:



Advertisements
Similar presentations
Update on IDNO/DNO working group DCMF 12 November 2009.
Advertisements

Review of NTS entry charge setting arrangements - IA 1 July 2010.
Third Energy Package for Change of Supplier 2009/73/EC.
DCMF Treatment of pre 2005 generation – DNO position Nigel Turvey 29 April | Energy Networks Association.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Charging Methodology Development Oliver Day © Copyright EDF Energy plc. All rights reserved. HV/LV Generation Charging April 2008 Oliver Day Distribution.
3 June 2010 energynetworks.org 1 SPEN Pre 2005 DG Draft Modification Report currently with Ofgem Proposed methodology for charging pre April 2010 EHV generators.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
CE Electric UK – Potential developments in long-term charging arrangements and IDNO charging methodologies 1 April 9, 2008 Potential developments in long-term.
EDCM update Mo Sukumaran (on behalf of CMG)
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
A DNO Perspective by Stephen Parker for Structure of Charges Workshop 15 July 2003.
June 2003 Structure of Electricity Distribution Charges Next Steps Martin Crouch Director, Distribution.
July 2003 Structure of Electricity Distribution Charges Welcome and Introduction Charles Gallacher Deputy Director, Scotland.
5 February 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY ON BEHALF OF WORKSTREAM 3 Workstream 3 Tariff Application.
KEY CONSULTATIONS an overview Louise Masters InnogyOne, Innogy UK Offshore Wind 2003.
Retail Energy Forum Andrew Neves Central Networks - CMG Chair 2 March | Energy Networks Association.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
Charging Methodology Development Oliver Day © Copyright EDF Energy plc. All rights reserved. Charging Methodology Update April 2008 Oliver Day Distribution.
Code Administrators Working Group Introduction 28 August 2008.
1 st April 2010 energynetworks.org 1 Common Methodology Group Work PRESENTED BY Tony McEntee, ENW Workstream 4 Update Common Connection Charging Methodology.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.
G3 Update to DCMF 22nd November Significant progress made Consultation on common methodology - May Stakeholder workshop - June Summary of responses.
EHV generation charging methodology change Harvey Jones.
19 March 2010 energynetworks.org 1 PRESENTED BY Nigel Turvey Workshop on Distributed Generation Connected pre April March 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Samordningsrådet med kunskapsplattform för smarta elnät Smart Grid and Smart Metering - Swedish Experiences Karin Widegren, Director Swedish Coordination.
1 EHV DG Charging Nigel Turvey. 2 Background Our current EHV charging methodology was not vetoed on 18 th February 2010 with the following treatment of.
Provision of third party access to licence exempt electricity and gas networks Andy Pace 4 October | Energy Networks Association - DCMF.
17 May 2011 Generation Dominated Areas Oliver Day UK Power Networks (on behalf of DNOs) 1 | Energy Networks Association.
Energy Suppliers Forum CDCM/EDCM - CMG Update Mo Sukumaran – CMG 10 November | Energy Networks Association.
Provision of third party access to licence exempt electricity and gas networks Tony McEntee 5 April | Energy Networks Association - DCMF.
11 December 2008 energynetworks.org 1 Common Methodology Group Work PRESENTED BY GEORGE MORAN, CENTRAL NETWORKS, ON BEHALF OF WORKSTREAM 2 Presentation.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
The EDCM proposals A summary of Ofgem’s consultation Ynon Gablinger 2 June 2011.
EDCM update Mo Sukumaran On behalf of DNOs ( WSB Chair) 1 December | Energy Networks Association - DCMF.
Structure of Charges Year-end review for DCMF 22 November 2007.
EDCM Workshop Workstream C Update Andy Pace - Chair 10 November | Energy Networks Association.
Customer Charge On behalf of all DNs 25 October 2010.
15 February 2006 TPCR second consultation: gas offtake Offtake Arrangements Workstream 15 February 2006.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
CDCM Annual Review Workshop Mo Sukumaran SSEPD (on behalf of DNOs) 17 May May | Energy Networks Association - CMG.
Energy Networks Association RIIO-ED1 Update for Suppliers December 2012.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Agency Charging Statement Overview of Consultation 11 th February 2008.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
EDCM update Andrew Neves CMG Chair 2 June | Energy Networks Association - DCMF.
DNPC08 Review of Standard LDZ System Charges Consultation Responses 25 October 2010.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Industry Dialogue on xoserve Services 14 th September 2007.
24 October 2006 Industry Dialogue on xoserve services – Work Plan.
4 June 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY ON BEHALF OF WORKSTREAM 3 Workstream 3 Tariff Application.
DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.
7th DCMF on 19th June Connection Boundary Review Network charges comprise Connection Charges and ongoing Use of System (UoS) charges. The Connection.
Presentation at REEEP Regulatory Forum, 28 September 2004
Background Current balance of LDZ System and Customer charges
The Apprenticeship Levy and the Construction Sector
Transmission Planning Code – Draft Document
Code Governance Review UNC Modification Proposals
Transmission Planning Code
SO Incentives from April 2010
NPA 450/579 (Area Code) Relief in Quebec
Exit Capacity Substitution and Revision
Generation Dominated Areas(GDA)
Joint Office Presentation for Modification 0678
Strategy
Charging For Active Network Management / Flexible Connections
Presentation transcript:

July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution

July 2003 Introduction Background June 2003 Initial conclusions document – key proposals Implementation Links with other work

July 2003 Background The structure of charges project has three key aims: To review the charging principles established by the Electricity Council in the early 1980s; To establish a transparent and consistent boundary between connection and use of system charges for all network users; and To establish a robust framework for generator distribution use of system (GDUoS) charges.

July 2003 Background - continued December 2000 – initial consultation document setting out the main background and key themes March 2002 – proposals on interim measures for DG October 2002 – structure of charges update document February 2003 – industry workshop June 2003 – Initial conclusions document

July 2003 Background - continued Workshops – today and 24 July in Glasgow Responses to June 2003 document requested by 8 August Project enters implementation stage

July 2003 Initial conclusions document Key themes: Charging principles Charging methodologies Connection boundary Use of system Transitional arrangements Implementation

July 2003 Initial conclusions document Charging principles October 2002 document proposed that common charging principles should be recognised and applied across similar networks: -cost reflectivity; -simplicity; -ease of implementation; -transparency; and -predictability Responses to the document supported these principles

July 2003 Initial conclusions document Charging methodologies June document proposes that DNOs should be required by licence to set out a methodology that: -facilitates competition in the generation, transmission, distribution and supply of electricity; -leads to changes which, as far as reasonably practicable (taking into account implementation costs and the impact on competition) reflect the costs and benefits incurred by DNOs in such a way as to encourage efficient decisions by network users; and -is capable of evolution over time to reflect changing network characteristics and commercial arrangements

July 2003 Initial conclusions document Connection Boundary Previous consultation responses have indicated strong support from industry for: -common boundary applying to all connections -shallower connection charges for DG Guided by the common principles, the June document proposes: -shallow charges for EHV (33kV and above) connections and locationally varying use of system tariffs -shallowish charges for HV and LV (less than 33kV) connections – retaining locational signals – and simple use of system tariffs

July 2003 Initial conclusions document Connection Boundary (2) – Issues: Define reinforcement contribution rule for shallowish connections -de minimis rule e.g. if connectee does not exceed 25% of existing capacity no reinforcement contribution -when de minimis rule exceeded: -connectee charged for the proportion it uses of marginal increase in capacity? -connectee charged for the proportion it uses of the total capacity? -other? Need for contribution rules for other impacts e.g. upon fault level? Abolish Tariff Support Allowance and Capitalised Operation & Maintenance Further discussion this afternoon in work group A

July 2003 Initial conclusions document Use of system Shallower charges will require the remainder of the connection and O&M charges to be recovered via ongoing use of system charges June document proposes the introduction of use of system charges for generation (GDUoS) Issue: who pays – suppliers or generators? No change to the balance except where cost reflective Issue: network services – what services should GDUoS recover? Issue: should charges reflect forward or backward looking costs? Different signals to users require charges based on forward-looking costs Implementation stage of project will deal with these issues in detail Further discussion this afternoon in work group B

July 2003 Initial conclusions document Transitional arrangements Options for a transitional regime -no exemptions after April exempt pre-existing generators for a period of time e.g. until 2010 or for 15 years -make pre-existing generators liable for GDUoS from April 2005, but offset the charge with a lump sum or annualised rebate of the reinforcement and capitalised O&M elements of their connection charge -another option?

July 2003 Implementation Important interaction with DPCR4 – structure of charges proposals scheduled to come into effect April 2005 Implementation Steering Group (ISG) to be established in August and to hold first meeting in September Ofgems October 2003 Initial decision document will firm up the proposals in the June document, and discuss the issues of GDUoS, transitional arrangements and implementation in detail

July 2003 Implementation Steering Group Group to be chaired by Ofgem Ideally group will consist of approximately 12 individuals (plus Ofgem), representing all industry sectors and representatives of all DNO groups First meeting of the group in September 2003 –Agenda Terms of reference DNOs to set out proposed approach All parties to discuss requirements of Ofgem Second meeting in October 2003 Thereafter group to meet approximately bi-monthly Further discussion in work group C and in the next steps discussion at the end of today

July 2003 Links with other work DPCR4 -structure of charges proposals will affect DPCR 4 decisions Distributed Generation Co-ordination Group -joint Ofgem/DTI group that is aiming to facilitate the achievement of the Governments targets for renewable generation and CHP

July 2003 The remainder of today……… Industry perspectives Q&A panel session Lunch Work groups Feedback/discussion session

July 2003 Promoting choice and value for all gas and electricity customers