P roblem S olving I nnovator Solving Tomorrows Problems Today The 1 st Why can be formed once the Team has Brainstormed for Potential Causes The 1 st.

Slides:



Advertisements
Similar presentations
P roblem S olving I nnovator Solving Tomorrows Problems Today IS - IS NOT / COMPARITIVE ANALYSIS motivates deliberate thinking about the Boundaries of.
Advertisements

P roblem S olving I nnovator Solving Tomorrows Problems Today Electronic Brainstorm Database Electronic Brainstorm Database Brainstorming stimulates new.
P roblem S olving I nnovator Solving Tomorrows Problems Today 4 th Why / Root Cause Cause & Effect (Fishbone) 4 th Why / Root Cause Cause & Effect (Fishbone)
P roblem S olving I nnovator Solving Tomorrows Problems Today Primary function is to identify and organize possible causes of a specific effect and then.
P roblem S olving I nnovator Solving Tomorrows Problems Today To prevent any potential defects reaching the customer, define and implement containment.
Introduction It is expected your completed plan will require you to refer to applicable specifications, refer to reference documents and follow established.
P roblem S olving I nnovator Team problem solving in a production Environment.
P roblem S olving I nnovator Solving Tomorrows Problems Today Overview of how the 5 why automatically generates an FMEA & Control Plans 5 Why - FMEA Relationship.
P roblem S olving I nnovator Solving Tomorrows Problems Today Manual Prioritisation of 1 st Why / Functions. Manual Prioritisation of 1 st Why / Functions.
P roblem S olving I nnovator Solving Tomorrows Problems Today User Help The help feature is found through out the PSI.This enables the user to gain a.
Restricted © Siemens AG 2013 All rights reserved.siemens.co.uk/education Topic 16: Keeping it lean and mean Siemens Education.
P roblem S olving I nnovator Solving Tomorrows Problems Today 3 rd Why / Failure Effect Development 3 rd Why / Failure Effect Development 3 rd Why / Failure.
once the Team has Completed the 4th Why
P roblem S olving I nnovator Solving Tomorrows Problems Today Warnings Clear All prepares the PSI for the next problem. Clearing of D1-D3.
P roblem S olving I nnovator Solving Tomorrows Problems Today Potential Failure Mode DBS & Chart Root Cause DBS Reviewing/Updating the Databases and Analysing.
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
P roblem S olving I nnovator Solving Tomorrows Problems Today Identify the need and reason for the PSI. Clearly document the Opportunity Description Identify.
P roblem S olving I nnovator Solving Tomorrows Problems Today 2 nd Why/Voting Techniques Automatic Ranking 2 nd Why/Voting Techniques Automatic Ranking.
P roblem S olving I nnovator Solving Tomorrows Problems Today 1 st Why / Function Pareto Chart 1 st Why / Function Pareto Chart Overview of Percentage.
P roblem S olving I nnovator Solving Tomorrows Problems Today 2 nd Why / Requirements Cause & Effect (Fishbone) 2 nd Why / Requirements Cause & Effect.
P roblem S olving I nnovator Solving Tomorrows Problems Today Potential Benefit Description Force Field Analysis will identify the viability of Recommended.
P roblem S olving I nnovator Solving Tomorrows Problems Today The Team should Accept the PSI Innovation and develop the Team Structure & Logistics The.
P roblem S olving I nnovator Solving Tomorrows Problems Today Potential Causes of a Problem can be Arranged into Independent Groups and each Group can.
Popcorn Sample PFMEA: Process Flow
P roblem S olving I nnovator Solving Tomorrows Problems Today Once the Problem Profile is determined, the Process Control can be implemented correctly.
P roblem S olving I nnovator Solving Tomorrows Problems Today Problem / Improvement Confirmation Problem / Improvement Confirmation Management should.
8D Report provides a summary of the PSI
Systems Engineering – Risk Analysis with FMEA
P roblem S olving I nnovator Solving Tomorrows Problems Today The Fault Tree will automatically be generated once the Team has Completed the 5 th Why.
Lesson 7.2 Putting Your Best Foot Forward May 4, 2015 I can….BW… Explain how to prepare for an interview. Describe what happens in an interview. Summarize.
P roblem S olving I nnovator Solving Tomorrows Problems Today Databases for Improvements Prevention/ Lessons Learned Prevention/ Lessons Learned Potential.
P roblem S olving I nnovator Solving Tomorrows Problems Today Before beginning, establish the parameters of the opportunity. Do this by completing the.
Arithmetic Sequences Explicit Formula.
P roblem S olving I nnovator Solving Tomorrows Problems Today Current Situation Prevention / Detection Current Situation Prevention / Detection Analyzing.
Level 2 Unit 4 Producing Engineering Solutions Engineering Diploma Level 2 Unit 4 Producing Engineering Solutions An Approach to Unit Delivery and Assessment.
Test Friday (Safety and Collisions) To the back of the room: -Determine your Mass off egg and compartment -choose a spokesperson to explain your design.
What’s Coming…. Today (2/16) Update and review a sample final presentation (20’) Group Presentations- milestones and resource requirements (50’) Work Sessions.
PowerPoint Two: Ready, Steady, Get Cooking!. Starter Activity Can you give examples of meals you have tried which contain mushrooms? Which type of mushroom.
P roblem S olving I nnovator Solving Tomorrows Problems Today Analysis to minimize all future negative unforeseen effects of stated PSI subject Risk Analysis.
Inductive and Deductive Reasoning. Inductive Observing the data, recognizing a pattern and making generalizations Do you see a pattern Can you describe.
Breadboard Core Values, Beliefs about Learning and Learning Expectations.
200B ½”-2”. Modification Overview  Production of the 200B (Watts 719) began in 2003 and is current.
P roblem S olving I nnovator Solving Tomorrows Problems Today Saving with a Backup insures that the work that has been done in the PSI can be recovered.
P roblem S olving I nnovator Solving Tomorrows Problems Today Actions taken refers to the actual action taken as described in the FMEA Prevention & Detection.
4D-200, 4D-700 2½”- 10”. Modification Overview  Production began in 2003 and was discontinued in  The 4D-700 (RPDA) uses a Type-II bypass (single.
½”-10”. Modification Overview  Production of the series began in 1989 and is current.
450 4”-10”. Modification Overview  Production of the 4” - 10” sizes began in  The lead free version (XL) was introduced in 2011.
Rules of the Game In kitchens Wednesday(entree) and Thursday (dessert) Split kitchen group into two teams – entrée and dessert On days you are cooking,
Rules of the Game In kitchens Wednesday(entree) and Thursday (dessert) Split kitchen group into two teams – entrée and dessert On days you are cooking,
”-10”.
½”-10”.
Participant and Leader Training
Arithmetic and Geometric Means
Automotive Engines Theory and Servicing
4.2 Energy Flow in Ecosystems
Affinity Diagram.
Ken Periman Problem solving, Brake Booster Fluid leak
½”-10”.
450 2½”- 3”.
4n + 2 1st term = 4 × = 6 2nd term = 4 × = 10 3rd term
Invention List & Survey Brainstorm Page 4
719 ½”-2”.
880V 21/2”-10”.
Recipes.
1st Individually brainstorm and write down everything you remember from the Constitution! People Vocabulary Places Documents Constitution.
May is Coming !!! January 31st: Project approval (16 days from now) • Brainstorming, team formation, successful RFA February 7th: Project proposal (+7.
450DA 4”-10”.
Automotive Engines Theory and Servicing
Automotive Technology Principles, Diagnosis, and Service
6 Step Problem Solving Process
Presentation transcript:

P roblem S olving I nnovator Solving Tomorrows Problems Today The 1 st Why can be formed once the Team has Brainstormed for Potential Causes The 1 st Why can be formed once the Team has Brainstormed for Potential Causes 1 st Why / Function Development 1 st Why / Function Development 1 st Why / Function Examples 1 st Why / Function Examples 1 st Why / Function & FMEA 1 st Why / Function & FMEA 1 st Why / Function & Cause & Effect (Fishbone) 1 st Why / Function & Cause & Effect (Fishbone)

COVER PAGE

D4 - Developing the 1 st Why / Function …Options Option 1: Use the Affinity Diagram to naturally group ideas, Example VALVE MANUFACTURING 1st Why/Function Development OR Option 2: Use the Product (Assembly) Components, Example VALVE LEAKS POSTURE SPINAL COLUMNMUSCLES NERVES ASSOCIATED ORGANS Option 5: Use any other logical method or Sequence, Example BACK ACHES OR Option 4: Use a Process Orientated (Process Flow ) approach, Example COOKING OR RAW MATERIAL MACHININGTAPPING ASSEMBLY/ TEST DESIGN/ APPLICATION PREPARE INGREDIENTSCOOK/BAKE FOOD PLATE UP EAT FOODBUY INGREDIENTS Option 3: Use a Circumstantial Approach, Example TEAM DISAGREEMENT OR DEADLINESFRUSTRATION INCONSIDERATION PERSONALITYCOMMUNICATION WASHER VALVE BODY TEST/ ASSEMBLY ADAPTORFLUID & FITMENT

Applicable points from the Brainstorming Seal Surface Deteriorates Wrong Washer Damaged face of Valve I Adaptor damaged thread Missing Washer Vibration of Valve Thread Pitch Operational Use RAW MATERIAL MACHININGTAPPING ASSEMBLY/ TEST DESIGN/ APPLICATION WASHER VALVE BODYTEST/ASSEMBLYADAPTORFLUID & FITMENT RAW MATERIAL MACHININGTAPPING ASSEMBLY/ TEST DESIGN/ APPLICATION Components of Valve Washer Valve Body Test/Assembly Adaptor Fluid & Fitment D4 - Developing the 1 st Why / Function …Options Option 1: Use the Affinity Diagram to naturally group ideas, Example VALVE MANUFACTURING D4 - Developing the 1 st Why / Function …Options Option 2: Use the Product (assembly) Components, Example VALVE LEAKS 1st Why/Function Examples

1 st Why = the Function The Function describes each Process Step in a Process Select which Possible 1 st Why Function you would like to Investigate 2 nd Why 3 rd Why 4 th Why 5 th Why RAW MATERIAL TAPPING ASSEMBLY/ TEST DESIGN/ APPLICATION MACHINING 1 st Why / Functions & FMEA 1st Why Functions

The 1 st Why will be forwarded to the 1 st Arms of the Cause & Effect Diagram Automatic Population of C&E (Fishbone)

P roblem S olving I nnovator Solving Tomorrows Problems Today This completes the D4 1 st Why Now start the D4 2 nd Why