REGULATORY FRAMEWORK FOR ENERGY INFRASTRUCTURE INVESTMENT – GHANAS EXPERIENCE (PURC). ABUJA – NIGERIA MAY 1, 2008 By Commissioner Andrew Quayson Chairman,

Slides:



Advertisements
Similar presentations
Hydropower Development Policy & Regulatory Framework
Advertisements

A 2030 framework for climate and energy policies Marten Westrup
INVESTMENTS IN POWER SECTOR
1 MDG Needs Assessment Process in Tajikistan Temur Basilia MDG Team Leader UNDP Tajikistan July 2005.
A strategy for a Secure Information Society –
PRESENTATION AT THE WORKSHOP ON LDC PRIORITY NEEDS FOR TECHNICAL AND FINANCIAL COOPERATION 29 OCTOBER 2009 GENEVA Sari Laaksonen Coordinator, Integrated.
Pakistans Power Sector Need for Reforms By Kalim A. Siddiqui President-Petroleum Marketing Byco Petroleum Paksitan Limited 4 th International Power Generation.
Reliability in British Columbia
Good governance for water, sanitation and hygiene services
European Commission/IEA seminar with support of the Czech Government Rome 24 March 2003 Guidelines and Strategies for Energy Policies in Transition Economies.
1 Syria at a Turning Point Trends in the Syrian Economy University of Reading 23 rd February 2005 Dr Ken Charman.
Setting a New Course for Electricity in Ontario Presented to the WNA Annual Symposium by Milton Caplan 2004 September 8.
Privatised Electricity Distribution Companies: A Bankable Prospect? A Presentation at the Bankers Committee/BPE Technical Workshop on Nigerian Power Sector.
31 Mount Pleasant, London WC1X 0AD UK Tel Fax LONDON | BEIJING | PHILADELPHIA | WASHINGTON The Energy.
EMIG Electricity Market Investment Group Presentation to the Ontario Energy Board February 17, 2004.
PERSPECTIVES OF THE COMMON BALTIC ELECTRICITY MARKET Prof. Inna Steinbuka, Chair, Public Utilities Commission, Latvia The Institute of Economic Affairs.
Evaluating administrative and institutional capacity building
Offshore Transmission Giles Stevens Head of offshore electricity transmission.
Regulatory Environment and Small-hydro Development Professor Priyantha D C Wijayatunga Public Utilities Commission of Sri Lanka and University of Moratuwa.
Albanian power market Sokol RAMADANI Chairman ERE- Albania 1 FEBRUARY 2012 Electricity market design and regulatory issues in Albania and South East Europe.
TARIFF REGULATION IN THE NIGERIAN ELECTRICITY SUPPLY INDUSTRY
RENEWABLE ENERGY FEED – IN TARIFF REGULATORY GUIDELINES Waste-to-Energy Seminar 17 July 2009 Cape Town By Bianka Belinska.
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
Hydropower Development: Experience of Nepal
BY S. U. YAMUSA II AND A. H. ANSARI
1 Georgian National Energy and Water Supply Regulatory Commission Tariff Regulation Gocha Shonia Department of Methodology and informational provision.
+ PROJECT BACKGROUND: KENYA THE NEED FOR CONSUMER PARTICIPATION IN THE REFORMS PROCESS OF THE ELECTRICTY SUB-SECTOR Susanne Rabisch, CUTS Nairobi.
Incentive Regulation Topics Scott A. Struck, CPA Financial Analysis Division Public Utilities Bureau Illinois Commerce Commission.
NATIONAL STRATEGY FOR WSP IMPLEMENTATION IN GHANA. Nii Okai Kotei Director, Water Public Utilities Regulatory Commission, Accra, GHANA IWA Africa Region.
Electricity Reforms and Regulations in Nepal Navin Dahal South Asia Watch on Trade, Economics & Environment (SAWTEE)
Competition and Regulation Interface in Developing Countries: Realities from the Power Sector By Ama Asantewah Ahene* and Emmanuel A. Codjoe** *Institute.
Regulatory Flexibility Committee Competitive Procurement September 18 th Joe Kerecman Director Government and Regulatory Affairs
Electricity Reforms in Bangladesh
1 United States Agency for International Development (USAID) National Association of Regulatory Utility Commissioners (NARUC) Sponsored.
 Energy Conclave 2006 Energy and Sustainable Development July 2006.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
Energy Sector Reform L ancaster House, 21 / 22 February 2002 Energy Sector Reform Poverty Reduction, Growth and Debt Sustainability in Low-Income CIS Countries.
E P D K 1 Turkish Electricity Market and Recent Developments Cemal Çelik Energy Expert EMRA-TURKEY March ANTALYA.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 5 Energy Regulation Module 5: STRUCTURE, COMPOSITION AND ROLE OF AN ENERGY REGULATOR.
1 WHOLESALE ELECTRICITY MARKET AN OVERVIEW By:Ag. Manager, Market Operations.
© 2005 by Center for Energy Economics, Bureau of Economic Geology, The University of Texas at Austin. All rights reserved. 1 Efficacy of Energy Regulators.
The strategy for improved electricity distribution maintenance 9 June 2008.
1 Electricity Industry – Municipal Tariff Issues and NERSA Approval Processes Compiled by Nhlanhla Ngidi.
SEVENTH MEETING OF THE OSLO GROUP OF ENERGY STATISTICS HELSINKI, FINLAND 23 – 26 TH OCTOBER, 2012 BY SALIFU ADDO ENERGY COMMISSION OF GHANA ENERGY STATISTICS.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
An update on the Market Development Program Phil Bishop New Zealand Electricity Commission Presentation to the EPOC Winter Workshop 3 September 2009.
IPP and Corruption in Indonesia Fabby Tumiwa Institute for Essential Services Reform 14 th IACC Workshop CLEAN ENERGY 13 November 2010.
1 Belarus CEM Discussions Energy Sector Stable sector structure and governance over the past decade together with recent macro economic performance of.
1. Mirza Hamid Hasan 29 September  Need for Regulation  Historical regulation authority and mechanism  Creation of present regulatory agencies.
1 Vienna Economic Forum –VEF- ERE AND THE REGULATORY FRAMEWORK FOR THE PRIVATISATION OF DSO Bujar Nepravishta Chairman of ERE Tirana-8 th and 9 th June.
Independence and powers of regulators: legal and institutional requirements Heinz Hilbrecht, Director, European Commission World Forum on Energy Regulation.
Energy Issues and Regulatory Developments In Europe and Eurasia NARUC Winter Meeting International Committee February 17, 2008 Robert A. Archer Energy.
Electricity Sector April Electricity sector in perspective Electrification of households is one of Government’s priority programmes The country.
Course 3.6 Regulatory Commissions: Management & Staff Functions, Bangladesh, Mar 31- Apr 4, 2002 SOUTH ASIA REGIONAL INITIATIVE/ENERGY Regulatory Commission.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
EABC/EAC ENERGY CONFERENCE: 8-9TH JUNE, AVAILABLE BUSINESS OPPORTUNITIES IN THE ENERGY SECTOR By Eng. B.J. Mrindoko.
EgyptEra 1 Market Reform By: H. Waheed. 2 Objectives Of Regulatory Agency  Regulates and supervises all electricity generation, transmission, and distribution.
Gints Zeltiņš Commissioner of the Public Utilities Commission of Latvia Multi-sectoral regulator: Public Utilities Commission of Latvia.
Energy and Power Supply Papua New Guinea 1. PNG Power Limited PNG Power Ltd  is a State owned Corporation with the Government’s ownership interest held.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
Energy Regulatory Authority (ERA) of Mongolia Mr.Tumentsogt Tsevegmid, MSc, MPA Regulator, Energy Regulatory Authority University Street 2A, Ulaanbaatar.
Japanese Electricity Market M. Hossein Javidi Iran Electricity Market Regulatory Organization & Administrative Department for Electricity Market Regulatory.
RENEWABLE ENERGY REGULATION IN KENYA KENYA-SPAIN MULTILATERAL PARTNERSHIP MEETING HELD AT CROWNE PLAZA Presented by Caroline Kimathi Asst Manager, Licensing.
ERERA AND ECOWAS ELECTRICITY MARKET DEVELOPMENT AND REGULATION
GREEN MINIGRID REGULATORY REFORM: TRENDS AND APPROACHES *
WATER REGULATORY AUTHORITY
progress of the water reform in bulgaria
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Presentation to the Parliamentary Portfolio Committee
Albanian power market ERE- Albania Sokol RAMADANI Chairman E R E
Presentation transcript:

REGULATORY FRAMEWORK FOR ENERGY INFRASTRUCTURE INVESTMENT – GHANAS EXPERIENCE (PURC). ABUJA – NIGERIA MAY 1, 2008 By Commissioner Andrew Quayson Chairman, Technical Committee Public Utilities Regulatory Commission (PURC-GHANA)

2 Presentation Outline 1. Background to Establishment 2. PURC-The Commission Act Tariffs 4. PURC Tariff Responsibilities 5. Tariff Decision Process 6. Composition of tariff 7. Key Tariff Considerations 8. Challenges 9. PURCs Experience to date 10. Conclusion

3 1.0PURC – Background to establishment Independent regulatory institution Established by an Act of Parliament (Act 538) To regulate and oversee the provision of utility services Created out of power sector reform recommendation Chronic lack of investment in Energy Sector Poor Quality of Service Low Tariffs Poor Financial Performance by Utilities Recommendation by the World Bank to Reform Sector Power Sector Reform Committee (PSRC) Recommendations by PSRC Unbundling of System Establish Regulatory Framework Restructure the Distribution System Attract private Investment

4 PURC – Background to establishment -Contd Goals of Power Sector Reform Increase access to electricity to all sectors of the economy Ensure efficiency in delivery of power to consumers Specific Objectives Enhance the management and accountability of the public utilities Promote private sector participation in the Generation and Distribution Sectors Ensure an effective regulatory environment Energy Commission: Technical Standards and Licensing PURC: Economic Regulation Quality of Service Regulation

5 2.0 PURC - The Commission Act 538 Functions Provide guidelines for rates to be charged by utilities. Examine and approve rates to be charged by utilities for services provided Monitor standards of performance for provision of utility services Protect interest of both consumers and providers of utility services Promote fair competition.

6 3.0Tariffs History of Electricity Tariffs in Ghana Previously determined by Government (both as Regulator and operator) Tariff structure was not cost reflective (Tariff levels too low to cover cost of production) Low tariffs resulted in chronic lack of investment and poor quality of service PURC constituted as an independent body to take charge of regulatory functions including tariffs setting 2000 PURC developed and issued Electricity Rate Setting Guidelines

7 History of Electricity Tariffs in Ghana Continued Transitional plan for gradual tariff adjustment also developed in 2001 PURC has carried out two major tariff reviews since its inception in 1997.( ) Quarterly Automatic Adjustment Formula implemented from March 2003 to August 2006 PURC carried out a third major tariff review in 2006

8 Develop tariff setting mechanism which is fair and predictable. Ensure transparency in the tariff making process. Set efficient economic tariffs, based on efficient production costs Provide opportunity for utilities to earn a fair risk- adjusted return To enable utilities to improve quality of service 4.0PURC Tariff Responsibilities

9 5.0Tariff Decision Process Submission of tariff proposals by utilities to PURC Submission of tariff proposals to key institutions Publicise proposals – through electronic & print media Organise Public hearings Consultation with key stakeholders Utilities Consumers – all major classes Government

Composition of Tariff Bulk Generation Tariff – weighted average of all generation sources Imports Combined cycle thermal Simple cycle thermal Hydro Renewables Fair RoR on investment

11 Composition of Tariff contd Transmission Service Charge Cost of transmission, Transmission losses Reasonable RoR Distribution Service Charge Cost of distribution, Distribution losses Energy purchase Fair RoR on Investment

12 Composition of Tariff contd Bulk Supply Tariff – sum of the Bulk Generation Tariff and Transmission Service Charge Average End User Tariff: Sum of the Bulk Supply Tariff and Distribution Service Charge

13 Trend of Bulk Supply Tariff (BST), Distribution Service Charge (DSC) and Average End-User Tariff (AEUT) in cents/kwh for the Period

14 7.0Key Tariff Considerations 7.1Objectives of tariff Ensure full Cost recovery of reasonable and efficient costs Encourage efficiency through performance targets Provide incentives for operational efficiency Ensure financial viability of utilities 7.2Tariff structure Structure inherited contained cross subsidies Too many bands for residential consumers

15 Compound house effect/multi tenanted dwellings Low collection rate and high system losses Subsidy Life line tariff – subsidy was enjoyed by all consumers 7.3 Tariff Decisions Reduced cross subsidies and band Gradual move to economic tariff Rebalance of max demand and energy for industry Lifeline tariff targeted at low income consumers Efficiency benchmarks for system losses and collection rate Customer outage duration and frequency targets per year Key Tariff Considerations (contd)

Challenges Regulatory Independence Determined by: Level of discretionary decision making power Staffing autonomy, own procedures, determine own salaries Funding mechanism Accountability Regulators must be able to justify decisions Regulatory decisions can be subjected to public scrutiny

17 9.0PURCS EXPERIENCE TO DATE First decade devoted to addressing tariffs Bold tariff decisions taken to restore viability of utility (from 4.2 cents US in 1998 to 13.4 cents in 2008) Increasing access of electricity from 40% in 2000 to 54% in 2005 Generation capacity increased by over 60% from 1072MW (1997) to 1730MW (2005) No significant improvement in quality of Service delivery (load shedding 1998, 2003, ) Energy Commission has developed a Strategic National Electricity Plan Generation separated from transmission Independent System Operator set up (GRIDCO – 2007)

18 PURCS EXPERIENCE TO DATE contd Encouraging private sector participation in Generation TICO MW Simple Cycle Since 2007, 12 IPPs showed interest to generate a total of over 1500MW. Construction of first phase of 540MW combined cycle 2008 Government sourced funds for investment in Power Sector Retrofit of Akosombo generation plant at a cost of US$130M increased capacity from 912MW to 1020MW US$ 622M Chinese loan for 400MW Hydro Electric Dam at Bui ( 2007 ) US$ 250M from Eurobond market for investment in Transmission and Distribution (2007)

Conclusion Opportunities for investors Political Stability Planned accelerated economic growth of 8% Established Regulatory Institutions 20% supply gap Establishment of WAPP Fair risk adjusted RoR for investors Oil/Gas find in Ghana