Exploring the feasibility of implicit allocation in the gas market

Slides:



Advertisements
Similar presentations
IG meeting TITRE 04/04/2013 IG meeting Coordination of the (early) implementation of network codes Programme Office.
Advertisements

1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
RCC meeting Feasibility of implicit allocation in the gas market TITRE 18/10/2012 RCC meeting Feasibility of implicit allocation in the gas market NMa.
Early implementation of CAM : PRISMA initiative GRI South – SG Meeting Madrid, 30 April 2013.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Preparation of the 9th Stakeholder Group meeting Programme Office RCC meeting, 9 September 2011.
Exploring the feasibility of implicit allocation TITRE 04/04/2013 IG meeting Exploring the feasibility of implicit allocation in the gas market NMa.
GRI NW European Energy Work Plan 2011 – 2014 Programme Office RCC meeting, 15 September 2011.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
RCC meeting Gas Regional Investment Plan project TITRE 18/10/2012 RCC meeting Gas Regional Investment Plan project CRE.
Erik Rakhou - Energiekamer 19th Madrid Forum 22 March 2011 Amendment of the Guidelines of Good Practice for Storage System Operators - Capacity allocation.
Click to edit Master title style 1 5 th GRI Coordination meeting Brussels, 25 th October 2011.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
Madrid, 1 st April 2008 Proposal for the commercialisation of existing and committed capacity at the cross border point of Larrau between France and Spain.
GRI NW Investment - Update on project Common effort on making regional investment happen 21 September 2010.
Bonn Workshops 8 and 9 Feb Balancing workstream.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
Draft Framework Guidelines on Capacity Allocation and Congestion Management Florence Forum 13 December 2010 Alain Marien ENM TF co-chair.
Gas Regional Initiative Impact of the 3rd package & creation of RIG Benoît Esnault (CRE), GRI TF co-chair NW GRI – RCC and ministerial meeting Paris, 8.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
1 Dublin 23/24 April CONCLUSIONS Regulatory Co-ordination Responses to Deliverables 3 and 4 due by 8 th May Papers redrafted to take comments into account.
European Developments Transmission Workgroup 3 rd May 2012.
NRA’s vision on GRI NW work plan 2011 Stakeholder Group meeting Brussels, 26 November 2010 Peter Plug Chairman of GRI NW.
CNMC and CRE intend to formally approve IFE rules 3.1 by mid-March
Gas Regional Initiative South South-East
29th November 2016 Teleconference
19th GRI Coordination Group meeting
21st IG Meeting South Gas Regional Initiative
Enagás, GRTgaz, Reganosa, REN and TIGF
Harmonization of Cross Border Transmission Tariffs between
Update on CAM roadmap/ joint European Capacity Platform
43th IG Meeting South Gas Regional Initiative
GSE worked with ERGEG on CAM/CMP since
Work plan of GRI NW for 2011 Three out of four projects are started
Gas Regional Initiative
Feasibility of implicit allocation in the gas market
GRI NW European Energy Work Plan 2011 – 2014
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
ACER’s view on the future role of the Gas Regional Initiative
Coordination of the (early) implementation of network codes
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Preparation of the 9th Stakeholder Group meeting
First thoughts on project approach for assessing market liquidity within GRI NW Programme Office RCC meeting TITRE 18/10/2012.
29th April 2014 Teleconference
Update on CAM roadmap/ joint European Capacity Platform
43th IG Meeting South Gas Regional Initiative
Enagás, GRTgaz, Reganosa, REN and TIGF
Gas Regional Investment Plan project
Preparation of the 9th Stakeholder Group meeting
Coordination of the (early) implementation of network codes
Purpose Transparency is a critical element in ensuring an effective functioning internal European Gas market Gas Regulation No 715/2009, effective from.
Gas Regional Initiative Update on progress and latest developments
29th November 2016 Teleconference
GRI NW European Energy Work Plan 2011 – 2014
Gas Regional Initiative South South-East
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Coordination of the (early) implementation of network codes
ERGEG comment to KEMA study on Art. 3 and 7
Gas European Network Code Implementation
ACER’s view on the future role of the Gas Regional Initiative
Exploring the feasibility of implicit allocation in the gas market
Work plan of GRI NW for 2011 Three out of four projects are started
Feasibility of implicit allocation in the gas market
Gas Regional Initiative South South-East
EU CAM Network Code and CMP Guideline Proposal Update
Presentation transcript:

Exploring the feasibility of implicit allocation in the gas market NMa IG meeting TITRE 04/04/2013

Report of The Brattle Group (commisisoned by NMa) The drafting process of the position paper of NRAs within GRI NW on the feasibility of implicit allocation is in its final stages Report of The Brattle Group (commisisoned by NMa) Draft RCC position paper up for consultation Initial conclusions presented at SG meeting Finalisation position paper by RCC Process so far

The consultation signalled that stakeholders consider the timing not right to determine the feasibility of implicit allocation Implicit allocation is useful arbitrage instrument if price difference is sufficient Implicit allocation can raise liquidity/ lower transaction costs, improve use of capacity No coordination problem exists or is likely to exist once CAM/CMP are in full swing Gas fired plant is back up for renewables (no sourcing short term cross-border) Avoid a “one size fits all” approach CAM /CMP will improve allocation and use of capacity and will (likely) raise liquidity, lower transaction costs... .. thus asses added value once CAM/CMP are up and running .. now focus on development/ implementation of new rules

NRAs conclusion at SG meeting: CAM and CMP should be up and running before deciding whether implicit allocation should be default CAM and CMP can indeed solve issues related to allocation and use of capacity, thus no full scale implementation until effects are fully known But: implicit allocation can have added value under certain conditions: e.g. sufficient price differences and FAPDs, severe congestion NRAs will identify these conditions in the final position paper. If met, implicit allocation (via pilot) should ideally be explored on that border NRAs are not sure that no coordination problem will exist for Within Day once profiled booking is full swing, time should tell NRAs believe that under the right circumstances (to be identified) implicit allocation can serve as an optimization tool for gas fired plants

Following the RCC meeting ACM will revise the position paper and (following RCC approval) will publish the position paper 4 April 9 April 16 April 18 April 21 April Publication position paper/ EoC Revised position paper RCC meeting Announcement position paper at Madrid Forum Feedback of RCC on position paper/ EoC

NRAs within GRI NW will publish three types of document on the GRI NW part on the ACER website once position paper is finalized Consultation responses Public consultation responses and minutes of workshop Evaluation of comments Document explains stakeholder feedback per consultation question and how NRAs within GRI NW treat response Final position paper Document explains final view of NRAs within GRI NW on feasibility of implicit allocation (based upon EoC)