Rob Mead PETAL-II Trials Manager Eurocontrol, DIS/ATD

Slides:



Advertisements
Similar presentations
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
Advertisements

Overview of the interoperability Regulation
FANS (Future Air Navigation System) Flight Crew Procedures
LINK2000+ Status Søren Dissing
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 20th MEETING OF WORKING.
GLOBALink/VHF Digital Link Mode 2
NEXCOM Next Generation Air/Ground Communications Briefing Presented to AMCP Working Group M Montreal, Canada December 16, 2002 James T. Eck Air/Ground.
NEXCOM Next Generation Air/Ground Communications AEEC General Session December 2001 Jim Eck Air/Ground Communications Product Team Lead.
A GLOBALink ARINC VDL Mode 2 AOA and ATN Program Status & Deployment Activities November, 2000 AMCPWGM1 WP23.
1 LINK European Organisation for the Safety of Air Navigation ICAO WG N Brussels July 3 rd -6 th Presented by Eurocontrol – Martin Adnams.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OSED CARE-ASAS Activity 3: ASM Autonomous Aircraft OSED.
ATN99 International ConferencePage September 1999 London ATN99 INTERNATIONAL CONFERENCE September 1999 London Paul Hennig, United Airlines.
ATN 99 Service Technique de la Navigation Aérienne 1 ATN Activities & Plans ATN in FRANCE FOR SAFETY REASONS MAIN FUTURE DATA/LINK ATSC WILL BE ATN.
PETAL-II EATMP PETAL-II Ops Results Slide 1 ATN th Sep 2001 ATN th September 2001 PETAL-II Operational Results The Controller and Aircrew.
ACI/GM/3011/1.0 ACI's Portable ATN Software Products & Services Technology for next-generation aviation data communication… Presented by Forrest Colliver.
The Future of PETAL Technology
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
© DLR, Institute of Flight Guidance ASAS Thematic Network 2 nd Workshop 6-8 October 2003 – Malmö Session 1 – ATSA Application Track Bernhard Czerlitzki.
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
VHF Digital Link Mode 2 Deployment Strategy Vic Nagowski
Federal Aviation Administration Presented By: Dennis Addison, FAA Date: February 8, 2012 SOCM-2 Seminar Data Link Operations.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Controller-Pilot Data Link Communications Build I & Build IA Programs ATN 2001 Focus on the Reality of Data Link IEE London, England 19 September 2001.
FAA Presentation to CAR/SAM ATN/GNSS Seminar, Varadero, Cuba, May 2002 Current Status of FAA Controller-Pilot Data Link Communication (CPDLC) - Build 1,
ATN 2001, London - 18 Sep 01 1 PETAL II and II Extension Maastricht Multi-stack Implementation Lessons Learnt Prepared by Gustaaf Janssens/Konrad Koebe.
24 Sept '02Page 1 FANS-1/A Accommodation in an ATN Environment.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
LINK2000+ Lifecycle Context Time Towards Implementation Standardisation Validation Trials Standards.
CPDLC Expected Stakeholders 6 CPDLC Integration Team (CIT) Government/Industry/Union Team Providing Coordinated Management and Oversight of.
The ATN Avionics Vendors View. ATN2001 Sept 2001; p.2 PETAL-II Avionics.
ATN 2001, London - 18 Sep 01 1 PETAL II Extension Architecture, Integration and Testing Prepared by Martin Adnams/Isabelle Herail.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-25/PIA-2 Increased Interoperability, Efficiency and Capacity through.
How the PETAL Trial Relates to the FAA’s CPLDC Program ATN 2001 Focus on the Reality of Data Link IEE London, England 18 September 2001 Gregg Anderson.
ATN Subnetwork Implementation:
ARINC PETAL IIe VDL Mode 2, ATN …and beyond
ATN 2002, London - 24 Sep 02 1 OPERATIONAL DATA LINK AT MAASTRICHT UAC P2L PETAL TO LINK Gustaaf Janssens Maastricht UAC Project Manager P2L.
EEC-ATI (V2) 1 ATN2002 CONFERENCE LINK2000+ ATN2002 CONFERENCE LINK2000+ LINK2000+ European ATS Provider Benefits Real-time Simulation Results ATN2002.
20 FLIGHT OPERATIONS TECHNOLOGY Innovations in flight FANS-1/A involvement and future Captain Joe Burns Director – Flight Operations Technology.
Data Link Communications
FANS-1/A and ATN Data Link: An Avionics Perspective Bob Kerr
NORTH ATLANTIC ADS WAYPOINT REPORTING TRIALS. John Coulson NATS Infrastructure Services.
1 EUROCAE EUROCAE Dedicated to Aviation Standardisation ASAS Standards: “From concept to equipment” David Bowen (Technical Secretary) April 24 th 2007.
Rob Mead PETAL-II Trials & Project Manager Eurocontrol, DIS/ATD
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
Presented to: DCIT FDWG Breakout Session By: Andy Fry, Thane Inc. Date: July 11, 2012 Federal Aviation Administration Data Communications DCIT #16 Flight.
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
BOEING is a trademark of Boeing Management Company. Copyright © 2011 Boeing. All rights reserved. OMWG and All Working Groups DCIT-39 report out 11 March.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
Page 1 FAA Future Air/Ground Communications System Architecture James Williams Integrated Product Team Lead Communications Systems ATN September.
Federal Aviation Administration Data Communications Program FAA Prototype & Validation Activities Presented to:Data Comm Implementation Team By:Craig Morris.
Page 1 July 28, 2003 Richmond Facility ATN 2003 IEE London Raytheon Integrated Data Link–RIDL
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization
Workshop on preparations for ANConf/12 − ASBU methodology
Presented by Thales Avionics ATN 2003 London, UK September 2003
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
FANS (Future Air Navigation System) Flight Crew Procedures
International Civil Aviation Organization
6th May 2002 Current Status of FAA Controller-Pilot Data Link Communication (CPDLC) - Build 1, 1A, and Beyond M J A Asbury Presentation ATN3.3 The development.
Ground System implication for ASAS implementation
Presented at ICAO ACP WG-I By Robin Hughes
Data Communications Program
Workshop on preparations for ANConf/12 − ASBU methodology
ATN Subnetwork Implementation:
Presentation transcript:

Rob Mead PETAL-II Trials Manager Eurocontrol, DIS/ATD PETAL-II Preliminary Eurocontrol Test of Air/ground data Link, Phase II Operational Validation & Early Implementation Rob Mead PETAL-II Trials Manager Eurocontrol, DIS/ATD

Topics Trials Context PETAL-II Preliminary Results Current operations and status AAL / ARINC ATN Extension Preliminary Results

PETAL “Operations first, then technology.” GOAL: requirements validation & capture Are we headed in the right direction? So, we implement: ODIAC operational concept, services, procedures, & abnormal modes international standards where ever possible with airlines, industry, service providers without backing a technology (triple stack) with the ops floor and cockpit skeptics

PETAL-II Operational Package Operational trials, in situ, with users Clearly defined procedures and airspace Pilot and controller always in command Voice readback before clearance execution Fully silent for all other communications Limited CPDLC message set (32 up, 12 down) Routine R/T (transfer, level, route, heading, crossing conditions, vertical rate, speed, + few) A little ADS and CM / AFN (log-on) ATN (and FANS-1/A) compliant events. Multiple a/g datalink-equipped aircraft

PETAL-II Players, End-End SAS, Lufthansa AAL ANZ, UAL, DLH, COA, etc. Simulation Downlink Parameters ICAO CNS/ATM Op data and behavior ARINC VDL-2 stations NEAN ATN SITA FANS-1/A NEAN Ground Stations Mode-S PETAL-II Front-End Processors Maastricht FAA Reims Paris

PETAL-II Review (current ops) NEAN Live Operations: Apr ‘98 600+ flights June - Oct '98 400+ April - June '99 FANS-1/A live operations: Feb ‘99 24-29 August: 23 of 36 total flights Key addition to results Connection-oriented Automated cockpit New cockpit cultures Over 1200 flights have used CPDLC in 9 months Multi-stack operations in place All day, all sectors (14+)

Maastricht Sectors

Maastricht Controller HMI

NEAN Airborne HMI

NEAN Communications Log

B777 Flight Deck

Airborne HMI NEAN CDTI FANS-1 FANS-A DCDU? ATN MCDU B747-400 MCDU B777 Flat Panels FANS-A DCDU? ATN MCDU

High Level Results Original objectives met at end ‘98 Tremendous amount of validation material Total rewrite of one key service (transfer) Numerous defects identified (e.g. timers) Requirements gaps identified, e.g.: log-on message pairs concatenated message rules Clearly added momentum to implementation

Flight Data Processing System Ground Architecture Controller HMI Controller HMI Controller HMI Controller HMI Flight Data Processing System - Flight plan / address association - ATN SARPS version 2.3 (ICAO doc 9705), CPDLC, ADS, CM - All datalink service logic (e.g. connection set-up / transfer, timers, etc.) IDD 4.0 BER P2FEP NFEP - Aircraft address/state - ASE emulation CM, CPDLC, ADS - Data conversion FaFEP - Aircraft address/state - ASE emulation CM, CPDLC, ADS - Data conversion ALLA - Aircraft address/state - Data conversion IDD 4.0 PER NEAN Server FANS-1/A Gateway ProATN - ASEs: CM, CPDLC, ADS - ATN Router

PETAL-IIe: AAL Initiative US and European airspace Core set of common messages Interoperable, documented functional differences Interoperable, documented procedural differences ATS / Airline deadlock broken Harmonisation for airlines and ATS

PETAL-II Review (ATN) Jan ‘99: PETAL-II End-End Spec’s frozen Spring '00: First flights can take place BAC1-11 trials ATN and Services, and satcom May ‘01: AA, Maas, & Reims red label flights 4 B767-300ER (European operations) Jun ‘02: First flights at Miami (FAA Build 1) Jun ‘03: US Key Site Build 1A (national 2004)

Maastricht & Reims Sectors

FAA Implementation Program Global Timelines PETAL Op Concept Op Requirements LINK Sim PETAL-II extension PETAL-II 1997 1998 1999 1996 1995 1994 2000 2001 2004 2002 2003 2007 …. 2006 2005 PIT Base-1 Base-2 Sim B-1 B-1A B-2 FAA Implementation Program CPC ADS AIDC 1 8

Preliminary Results

Data Sources Operator and Designer Experience and Logs Questionnaires and Interviews Controllers and Flight Crews Problem & System Improvement Reports Project Office Design Authorities Statistics, e.g. Transmission and dialogue times Message use FDP system states, e.g. log-on, connect, transfer all analysed for comm performance & debug

Integration Teams are Essential Develop End-to-End Specifications FAA Builds 1 and 1A (key site, Miami ARTCC) Maastricht and French UACs End-end procedures, automation, messages interoperable use of SARPS, now to DO/ED Plan and coordinate initial fielding & cert (air, ground, comm) Monitor and manage initial operations Formalise issues via RTCA/Eurocae, ICAO

Mixed Equipage Simultaneous datalink aircraft / sector Up to 30 aircraft (all types) in sector at one time Flight time / sector: 5 - 30 minutes Max number datalink aircraft (June '99): 3 Overlap time: 1 - 16 minutes Datalink use: heavy to not at all Mixed equipage preliminary results Equipage ratio: 1-3 datalink / 5-30 total Controllers unaware of NEAN or FANS-1/A Not considered a serious problem but Will limit benefits Minimum one flight per control session required

Response Times and CPDLC Use PETAL-I dialogue & delivery times confirmed. Max dialogue time, 10s = 55% Observed performance acceptable = 84% Actual averages = about 30s CPDLC good for strategic comm CPDLC not good for tactical acft separation regardless of transmission speed tactical = use, not message type CPDLC good for climb, cruise, descend (climb-out & approach???)

FANS-1/A Observations All applicable to ATN ARINC 424 vs. ground nav databases CPDLC connection for close departures If automated event, may occur at poor time Aircrew HMI should consider not alerting "connect" at same level as clearance Resume Own Nav without a "to" Concatenation and Conditional Clearances require additional restrictions All applicable to ATN

ATN Interoperability Issues You have message pairs. Standardise them! Log-on What's a "positive log-on"? Mandatory (optional) log-on data Static ground CM addresses / airborne data bases Which aircraft address used by the ground? Logical Response (LACK) How does aircraft know whether to use them? How do you resolve the cockpit differences? Who connects CPDLC, air or ground? New airspaces > different needs (e.g. timers)

Operational Results Reported Usefulness (controllers)

Message Sets Trick is to find a common core, and Cut the message set, at least for initial ops Eases HMI and training (300+ messages??) Too many options (e.g. meter data types) Some don’t fit ops (e.g. deviate N/S/E/W) No guidance on how to handle "bad" options Trick is to find a common core, and Define interop handling for data types involved Design HMIs to have these "on top" Implement those first International set now being standardised

Builds and Baselines

PETAL-II Datalink Capability Live operations, all 12 sectors, all day (539 CPDLC flights, 6/98 - 9/98) Capability 1997 1998 1996 1999 NEAN Operations ATN 1.1 compliant - FDPS - Operations Pre-Op environment FANS-1/A Operations FANS-1/A Front-End FANS-1/A ATN 2001 . . . . . . NEAN Operations ATN 2.3+ compliant - FDPS Operational upgrades FAA interoperable Final step to certified / op approved environment 2000 Link 2000+ 1 8

What Is This All Accomplishing? Bringing requirements into touch with reality Bringing standards into contact with designers Uncovering expensive interoperability issues before initial operations Bridging the Transatlantic divide for procedures and systems for operations Breaking the "you go first" deadlock Bringing together comm providers, airlines, ATS, and suppliers to build a single system

Conclusion We have broken the "I will if you will" deadlock Monthly report or newsletter distro? Individual or organizational input? rob.mead@eurocontrol.be www.eurocontrol.be/projects/eatchip/petal2/