PM2.5 NSR and Designations

Slides:



Advertisements
Similar presentations
EPA Preliminary Designations for the 24-hour PM 2.5 National Ambient Air Quality Standard Air Quality Technical Advisory Committee (AQTAC) September 18,
Advertisements

National Ambient Air Quality Standards for Particulate Matter; Proposed Rule & 40 CFR Parts 53 and 58 Revisions to Ambient Air Monitoring Regulations;
Doug Solomon, U.S. EPA OAQPS 2014 National Air Quality Conference Durham, NC February 12, 2014.
DEP’s Air Regulatory Update
Overview of the Tribal New Source Review (NSR) Rule U.S. Environmental Protection Agency Office of Air Quality Planning and Standards (OAQPS) Research.
1 Air Planning Section EPA Region 6. ActionTarget Date EPA Letter to Governors on Designations (120-day letters) December 21, 2011 Designations and.
Meeting of the Southern Ute Indian Tribe/State of Colorado Environmental Commission and the Colorado Air Quality Control Commission 4/16/2015.
How Ozone is Regulated under the Clean Air Act Darcy J. Anderson AZ Dept. of Environmental Quality.
Air Quality 101: Clean Air Act Overview/ Update. 2 Origins of the Clean Air Act Historic air pollution Donora, Pennsylvania, – PSD, tribes.
Designations for the 2006 PM2.5 Standards: Evaluating the Nine Factors in Setting Nonattainment Area Boundaries Part 1 – Overview Rich Damberg, Tom Rosendahl.
Planning for the 2008/2010 Ozone Air Quality Standards WESTAR Fall Business Meeting Portland, Oregon ~ September 29, 2010 Corky Martinkovic, Planning Supervisor.
A&WMA Georgia Regulatory Update Conference Current State of the Air in GA Jac Capp, GA EPD, Branch Chief, Air Protection Branch April 16, 2013.
Minnesota Air Quality and Attainment Status Frank Kohlasch Kari Palmer Statewide Travel Demand Coordinating Committee Meeting October 14, 2010.
IOWA Department of Natural Resources Air Quality Program Development Jim McGraw Environmental Program Supervisor  8 hr Ozone and PM2.5 NAAQS Implementation.
AWMA – Georgia Chapter Air Permitting Update April 16, 2013 Eric Cornwell Stationary Source Permitting Program.
Ozone Regulation under the Clean Air Act Darcy J. Anderson AZ Dept. of Environmental Quality.
Environmental Protection Division Air Quality Update Georgia EPD Jimmy Johnston Georgia Environmental Protection Division August 5, 2010.
Air Quality Policy Division D P A Q PM 2.5 Final NSR Implementation Rule Nat’l Tribal Air Assoc. July 16, 2008.
Early Action Compacts Presented by Karen Borel EPA Region 4 March 25, 2003.
Regulatory Update New Source Review Permitting Case Studies & Regulatory Updates August 26, 2009 ARIPPA Technical Symposium trinityconsultants.com.
Sound solutions delivered uncommonly well Understanding the Permitting Impacts of the Proposed Ozone NAAQS Pine Mountain, GA ♦ August 20, 2015 Courtney.
EPA’s DRAFT SIP and MODELING GUIDANCE Ian Cohen EPA Region 1 December 8, 2011.
1 PM2.5 Redesignation Request for the Metropolitan Washington,D.C. Region Joan Rohlfs Chief, Air Quality Planning Metropolitan Washington COG.
ANPR: Transition to New or Revised PM NAAQS WESTAR Business Meeting March 2006.
Development of 24-Hour 2006 PM 2.5 Designations Guidance NTAA National Tribal Air Quality Forum Barbara Driscoll EPA, OAQPS April 17, 2007.
1 U.S. Environmental Protection Agency – Office of Air and Radiation Implementing National Ambient Air Quality Standards (NAAQS) Anna Marie Wood, Acting.
National Ambient Air Quality Standards and Current Status of Air Quality Laura Boothe North Carolina Division of Air Quality MCIC Workshops March 2012.
1 SJVAPCD DRAFT SCHEDULES May 2, Hr OZONE ATTAINMENT DEMONSTRATION PLAN PM10 ATTAINMENT DEMONSTRATION PLAN.
Designations for 24-Hour PM2.5 NAAQS: Overview and Guidance Amy Vasu PM2.5 Workshop June 20-21, 2007.
State Implementation Plans: The Road Ahead
Final Clean Air Fine Particle Implementation Rule Briefing for NTAA EPA Office of Air Quality Planning and Standards April 17, 2007.
Jessica Montanez Environmental Protection Agency NEW SOURCE REVIEW (NSR) PROGRAM.
1 Non-Attainment NSR Program Donald Law EPA Region 8.
New Source Review Rules Update Jessica Montanez U.S. Environmental Protection Agency Office of Air Quality Planning and Standards Air Quality Policy Division.
1 Modeling Under PSD Air quality models (screening and refined) are used in various ways under the PSD program. Step 1: Significant Impact Analysis –Use.
1 Status of SO 2 Implementation and Modeling Issues Michael Ling Associate Director, Air Quality Policy Division U.S. EPA, Office of Air Quality Planning.
Permitting and National Ambient Air Quality Standards Changes Rick Goertz, P.E. Air Permits Division Texas Commission on Environmental Quality Advanced.
1 Designations & Classifications for the 8-hour Ozone NAAQS U.S. EPA Office of Air Quality Planning and Standards.
EPA Planning and implementation Update Western Regional Air Partnership November 11, 2009.
Session 2: Background FHWA Transportation Conformity and CMAQ Workshop Summer 2004.
PM2.5 NAAQS Implementation Interactive Session NACAA Annual Meeting May 8, 2013 St. Louis, MO 1.
National Ambient Air Quality Standards for Particulate Matter; Proposed Rule January 17, 2006.
SO 2 NAAQS Modeling MassCAIR Stakeholder Meeting December 13, 2011.
Nonattainment New Source Review (NA NSR) Program Raj Rao US Environmental Protection Agency Office of Air Quality Planning and Standards ,
OAQPS Update WESTAR April 3,  On March 12, 2008, EPA significantly strengthened the National Ambient Air Quality Standards (NAAQS) for ground-level.
Ozone NAAQS Implementation WESTAR Fall Meeting September 29, 2010 Scott Mathias, Associate Director Air Quality Policy Division.
N EW Y ORK S TATE D EPARTMENT OF E NVIRONMENTAL C ONSERVATION Short Term Ambient Air Quality Standards and The Effect on Permitting Margaret Valis NESCAUM,
1 Update on New Source Review (NSR) Activities and Priorities for Information Transfer and Program Integration Division April 7, 2004.
Natural Events Policy Questions PM 2.5 Natural Events – States/Regions Need Written Statement Clarifying Position That It Is Allowed Under Current Law.
New Ozone NAAQS Impacts: What Happens Next with a Lower O3 Standard? Nonattainment Designation and Industry’s Opportunity to Participate New Ozone NAAQS.
Ozone Redesignation Substitutes for the HGB and DFW Areas
New Source Review (NSR) Program Basics
Ozone and SO2 NAAQS Implementation Updates
Western Ozone Issues WESTAR Fall Business Meeting Salt Lake City, UT
Draft Modeling Protocol for PM2.5
Bill Harnett WESTAR Spring Meeting April 8, 2009
NACAA Permitting Workshop, Chicago June 14, 2011
Major New Source Review (NSR) Part 2
PSD Issues in PM2.5 Transition Proposal
PMcoarse , Monitoring Budgets, and AQI
Designations for Indian Country
Misc. NAAQS, Regional Haze and Permitting
Proposal to Revise the National Ambient Air Quality Standards for Particle Pollution WESTAR Meeting March 2006.
Implementing 8-Hour Ozone, PM2.5, and Regional Haze Standards
PM2.5 Annual primary standard currently 15 ug/m3
PM 2.5 Designation Process and Timeline
Uinta Basin General Conformity
PM2.5 Status - TEA-21 (Group 1 = data, Group 2 = data)
DOGM Collaborative Meeting
Presentation transcript:

PM2.5 NSR and Designations Bill Harnett WESTAR Spring Meeting April 2, 2007

Outline PM2.5 Implementation (NSR) PM2.5 Designations

Background on PM2.5 NSR PM2.5 NAAQS promulgated in 1997 PSD implementation guidance – issued by John Seitz in 1997 (Use PM10 as a surrogate) Designations effective April 2005 NNSR implementation guidance – issued by Steve Page on April 5, 2005 (PM10 surrogate) PM2.5 implementation rule proposed Nov. 1, 2005

Proposed NSR Provisions PM2.5 regulated under Subpart 1 Major source threshold 100 tpy Significant emissions rate for PM2.5 10 tpy Precursors SO2 always “in” as a precursor; NOX presumed “in” unless State demonstrates that NOX is not a significant contributor to PM2.5 or part of the transport problem VOC and ammonia presumed “out” unless State demonstrates otherwise. Ammonia is not a precursor in PM2.5 attainment areas.

Proposed NSR Provisions (2) Offsets 1:1 ratio Allow interpollutant trading statewide, regionwide, or on a permit basis Transition policy – For PSD continue PM10 surrogate policy until SIPs approved PM2.5 Increments, SILs and SMCs in a separate NPRM PM2.5 NSR Final Rule – Aug./Sept. 2007

PM2.5 Increments, SILs, and SMCs Increments Approaches § 166(a) % of NAAQS approach Similar to approach recently used to establish NO2 increments (a.k.a. safe harbor approach) § 166(f) equivalent increments approach 3 options each for SILs and SMCs Proposal scheduled August 2007

24-Hour PM2.5 Designations PM2.5 NAAQS was revised for the 24-hour PM2.5 standard only, lowered from 65 g/m3 to 35 g/m3. Effective date of the revised PM standards is 12/18/06. Section 107(d)(1) requirements for new designations: States must make recommendations no later than 12/18/07. EPA must notify States and Tribes of any modifications no later than 120 days prior to the final designations date. EPA is required to make final designations not later than 2 years after promulgation of the revised NAAQS (12/18/08); this date may be extended for up to 1 year if EPA has insufficient information to promulgate the designations (12/18/09).

Violations of Revised 24-Hour PM2.5 NAAQS Approximately 70 areas are violating the 2006 24-hour PM2.5 NAAQS (based on 2003-2005 monitoring data) 32 are in the 39 existing PM2.5 nonattainment areas Predominantly urban areas, with several smaller cities and non-urban areas (populations less than 100,000) All except 3 are in the Eastern U.S. 38 are “new” areas (those currently designated attainment for existing PM2.5 nonattainment areas) Mix of urban areas, smaller cities, and non-urban areas About 20 are in the Western U.S.

Areas/Sites Violating 24-Hour PM2.5 NAAQS – 2003-2005 Current nonattainment area violates new 24-hr NAAQS [32 areas] Current nonattainment area meets new 24-hr NAAQS [7 areas] Sites not in a current nonattainment area violate the new 24-hr NAAQS (59 sites) 59 sites are violating the new 24-hr standard and are NOT located in an existing nonattainment area. They are located in 38 different areas (34 in metro areas, 4 not in a metro area).

Key Issues for 24-Hour PM2.5 Designations Guidance Timing of final designations (see table) Monitoring data State recommendations should be based on 2004-2006 data. Most recent 3 years of data will be considered when EPA makes final designations. Boundary recommendations: Based on the assessment of the same 9 factors in previous PM2.5 designations (see next slide). Case-by-case assessment versus presumption. For areas with existing PM2.5 NA boundary, justify if different 24-hour boundary recommended (not revisiting annual boundary).

Factors to Consider for Boundary Recommendations Emissions in areas potentially included versus excluded from the nonattainment area Air quality in potentially included versus excluded areas Population density and degree of urbanization including commercial development in included versus excluded areas Traffic and commuting patterns Expected growth (including extent, pattern and rate of growth) Meteorology (weather/transport patterns) Geography/topography (mountain ranges or other air basin boundaries) Jurisdictional boundaries (e.g., counties, air districts, Reservations, etc.) Level of control of emissions sources

Draft Timeline for Designations Process Milestone 1997 PM2.5 NAAQS Date 2006 PM2.5 NAAQS Date State and Tribal recommendations due Feb. 2004 Dec. 18, 2007 EPA Response June 2004 Summer 2008? States Comment Aug/Sept. 2004 ??? Final Designations Dec. 2004 by or before Dec. 18, 2009? Effective date of final designations April 2005 90 days after publication in FR