doc.: IEEE <doc#>

Slides:



Advertisements
Similar presentations
Submission Title: [Add name of submission]
Advertisements

<month year> <doc.: IEEE doc> May 2015
May 2000 doc.: IEEE /109r0 May 2000 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: WPAN Requirements.
June 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposed Scenarios for Usage Model Document.
doc.: IEEE <doc#>
<month year> March, 2005
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
Oct 2011 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposed Comment Resolutions for CID 128 and.
<month year> doc.: IEEE <030158r0> March 2004
doc.: IEEE <doc#>
doc.: IEEE <doc#>
March 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Toumaz response to TG6 Call for Applications]
Submission Title: Proposed Text on Transmit Power Control for TGD
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
<month year> doc.: IEEE <xyz> January 2001
doc.: IEEE <doc#>
Doc: xyz January 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG5 Closing Report]
Submission Title: Modification of time planning for the task group 3d
August, 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Enhancing reliability of data transmission.
<month year> <doc.: IEEE doc> March 2015
Submission Title: [WG WNG Liaison Report January08]
<month year> <doc.: IEEE doc> December 2015
<month year> <doc.: IEEE doc> March 2015
doc.: IEEE <doc#>
doc.: IEEE <doc#>
Submission Title: TG procedure for PAC Date Submitted: May 2012
August 2013 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Enhancing and missing simulation result.
<month year> doc.: IEEE / January 2005
March 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Timeline of TG4s] Date Submitted: [16 March.
doc.: IEEE /XXXr0 Sep 19, 2007 June 2009
<month year> <doc.: IEEE doc> May 2015
doc.: IEEE <doc#>
<month year> doc.: IEEE a Nov 2006
doc.: IEEE <doc#>
doc.: IEEE <doc#1>
<month year> <doc.: IEEE doc> January 2016
<month year> <doc.: IEEE doc> March 2015
May 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Timeline of TG4s] Date Submitted: [19 May 2016]
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#1>
< Oct > Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG LPWA Draft Call for Contributions]
May 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Text for General Description of PAC Date Submitted:
doc.: IEEE <doc#>
<month year> <doc.: IEEE doc> March 2015
doc.: IEEE <doc#>
Nov Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Text Proposal for IEEE TG8 PFD: Discovery.
November 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: SRU IG Closing Report for Dallas November.
Jan Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Proposed Structure of Contention Free Period.
Submission Title: [Empirical channel model for wearable BAN]
<month year> <doc.: IEEE doc> July 2015
March 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Timeline of TG4s] Date Submitted: [16 March.
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Resolution of TG6 Draft D0 comments.
<month year> doc.: IEEE <030158r0> <March 2003>
January 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [17.
June, 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [OFDM PHY Mode Representation] Date Submitted:
November 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [15.
September 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Suggested TG3c PAR Changes] Date Submitted:
September 2009doc.: IEEE wng0
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Resolution of TG6 Draft D0 comments.
<month year> <doc.: IEEE doc> September 2015
<month year> <doc.: IEEE doc> March 2015
September 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Timeline of TG4s] Date Submitted: [17.
Jan 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TeraHertz Closing Report Date Submitted: January.
Presentation transcript:

doc.: IEEE 802.15-<doc#> <month year> doc.: IEEE 802.15-<doc#> <March 2012> Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [PAC Procedure] Date Submitted: [14 March 2012] Source: [Seung-Hoon Park, Chiwoo Lim, Pil-Yong Hwang, Kyungkyu Kim, Daegyun Kim, Won-il Roh] Company [Samsung Electronics] Address [416, Maetan-3Dong, Yeongtong-Gu, Suwon-Si, Gyeonggi-Do, 443-742, Korea] Voice:[+82-10-9349-9845], FAX: [+82-31-279-2441], E-Mail:[shannon.park@samsung.com] Re: [.] Abstract: [PAC standardization work procedure until draft documentation for letter ballot] Purpose: [To discuss PAC work schedule and procedure] Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15. <Seung-Hoon Park et al.>, <Samsung Electronics> <author>, <company>

PAC Work Procedure (Initial Draft) <March 2012> PAC Work Procedure (Initial Draft) Call for Application to make Application Matrix (AM) 4 Preliminary Documents Application Requirements Document (ARD) Channel Model Document (CMD) Technical Requirements Document (TRD) Evaluation Criteria Document (ECD) Call for Proposal Proposal Merger Draft Documentation <Seung-Hoon Park et al.>, <Samsung Electronics>

<March 2012> Call for Application To share the possible use-cases and operation scenarios To identify functional features and collate them into a spreadsheet - Application Matrix (AM) <Seung-Hoon Park et al.>, <Samsung Electronics>

4 Preliminary Documents <March 2012> 4 Preliminary Documents These documents will be distributed with the Call for Proposals Application Requirements Document (ARD) Channel Model Document (CMD) Technical Requirements Document (TRD) Evaluation Criteria Document (ECD) <Seung-Hoon Park et al.>, <Samsung Electronics>

Application Requirements Document <March 2012> Application Requirements Document To identify applications and service requirements To collate all identified significant applications, features and parameters To provide a common point of reference for other procedural steps <Seung-Hoon Park et al.>, <Samsung Electronics>

Channel Model Document <March 2012> Channel Model Document To choose the candidate frequency band(s) based on service requirements To develop the channel modeling of the candidate frequency band(s) path loss fading Needed to evaluate the performance of different PHY/MAC proposals on the same channel model <Seung-Hoon Park et al.>, <Samsung Electronics>

Technical Requirements Documents <March 2012> Technical Requirements Documents To describes the technical aspects that TG8 must fulfill performance, reliability, sustainability TOC (Table of Contents) may contain general description, overall requirements topology, bit rate, transmission range synchronization, peer discovery, peer pairing scheduling, interference management QoS, power consumption, mobility, security <Seung-Hoon Park et al.>, <Samsung Electronics>

Evaluation Criteria Document <March 2012> Evaluation Criteria Document Common ground to verify the fulfillment of the functional requirements and compare the various proposals to define simulations, evaluation scenarios and instruction, performance metrics and other comparison criteria <Seung-Hoon Park et al.>, <Samsung Electronics>