Industrial Testing Education at Undergraduate Level: A Datasheet and Diagnosis Labs Approach EWME2010 Béatrice Pradarelli / Laurent Latorre / Pascal Nouet.

Slides:



Advertisements
Similar presentations
Hong Kong Science Park HK$12 billion (US$1.5 billion) for HKSP Project in 3 Phases The Government has granted HK$3.3 billion for Phase I and HK$4 billion.
Advertisements

Vocational Evaluation and Assistive Technology Services Virginia Department of Rehabilitative Services and Woodrow Wilson Rehabilitation Center.
CETEC SENAI Mission: Technological Solutions for the Industry Challenges Total area (m 2 ): Built area (m 2 ): Technical depts.:11 Laboratories:54.
Turnkey IC and Device Packaging Package Science Services LLC Package design, characterization, simulation, modeling, measurements and analysis.
SMALL BUSINESS PLAN GUIDE
© The Jeff Cole Group. Ltd. Thank you for participating in this brief overview of the Jeff Cole Group, Ltd. (JCG). Established in 2002, JCG.
Information and Decision Support Systems
Electronics II Lab. Two Weeks. power connections Solderless Prototyping Board jacks for power connections.
Information and Decision Support Systems
1 Copyright 2003 © Hong Kong Science & Technology Parks Corporation Rev.2 6/1/2003 Presented by: S W Cheung, Vice President, Business Development and Technology.
S Changes and Procedures
Electronic Components
The University of Texas at Dallasutdallas.edu Highlights ▪ 110+ faculty in five departments ▪ Electrical Engineering ▪ Computer Science ▪ Materials Science.
A.S. in Nanotechnology A new degree at Ivy Tech Community College.
Diane Kruse, NEO Fiber Business Planning, Design, Engineering, Feasibility Studies, Project and Construction Management NEO Fiber Introduction.
Reaching Out to Providers Summary of Region II IPP Tools.
Section I Introduction to Xilinx
Welcome to the MOS-AK workshop Gerjan van de Walle Philips Research-MiPlaza.
Yves Bertrand, Marie-Lise Flottes, LIRMM Montpellier
Intel Teach Essential course Facilitated By; SADIA SAYED & SOOFIA SULTANA Training held at:- G.P.I.W. Lahore.
AQM for business innovation 1 METEF AQM for business innovation AQM is a large technical services center based in Provaglio d’Iseo – BS offering.
Elizabeth Hagerman, PhD Vice-President Rose-Hulman Ventures.
Agenda Introduction to circuits Building a simple circuit
CNRG-ITB Indonesian Electronics Industry: An Educational Perspective Onno W. Purbo Inter University Center on Microelectronics ITB FAX
Fuel Cell Initiatives Wright Fuel Cell Group Energy for Ohio’s Future.
Laboratory of Integrated Systems Polytechnic School University of São Paulo Polytechnic School University of São Paulo.
University of Nis Faculty of Electronic Engineering ( ELFAK )
MANUFACTURING VOCATS 7.O5. MANUFACTURING is A system or group of systems used in the manufacturing process to make products for an end user.
Relationship Sales Programme Course Outline INTRODUCTION The course emphasis is on the building of long term relationships with Key Customer and Influencers.
Information Systems Engineering. Lecture Outline Information Systems Architecture Information System Architecture components Information Engineering Phases.
CIT 141 – PC/Networking Fundamentals Lee Weiner
I NFORMATION S UPPORT AND S ERVICES 2.02 U NDERSTAND BASIC TROUBLESHOOTING OF HARDWARE AND SOFTWARE.
Chapter 1 Introduction EIN 3390 Manufacturing Processes Summer A, 2011.
Testability of Analogue Macrocells Embedded in System-on-Chip Workshop on the Testing of High Resolution Mixed Signal Interfaces Held in conjunction with.
2014. May.. The RENEX EEC,in Eastern and Central Europe, is the most modern IPC training center. The RENEX is one of the largest and oldest company.
Nanoscience and Nanotechnology in France France - US Workshop on NanoBioTechnologies Washington DC, March 2-3, 2006.
1 Managing New Product Introduction: Life Cycle Phases Team Members: Jhon Benavides Sabrina Patino Russ Watt June 5, 2009 Solar Plus.
Improving the world through engineeringwww.imeche.orgImproving the world through engineering 1 YOU CAN MAKE A DIFFERENCE CHALLENGE YOURSELF # Name of Presenter.
Technology Assisted Learning Jeanna Johnson. Remember that technology is a tool….just like a pencil. Using the tool effectively… will promote learning.
Answering the Economic and Social Environment Expectations Role of the Higher Education Institutions for the Development of the Continuing Education. Answering.
2 SISCON TECHNOLOGIST PVT.LTD ISO 9001:2000 CERTIFIED COMPANY SISCON is a leading group of Electronics Company dealing with automation product. This company.
Transistors to Gates © 2011 Project Lead The Way, Inc.Magic of Electrons.
2008~2014 A Company of Faith and Modesty Sigetronics, Inc. TLP System For ESD Test Of Semiconductors 4. TLP Test Results 1.Model.
Custom ICs for Radiation Detection & Imaging
A Mini project on “DRIVERLESS TRAIN ENGINE USING 8051 MICROCONTROLLER” GUIDED BY K.RAMBABU.
CONTROL SYSTEMS and INSTRUMENTATION Laboratory Department of Electrical Engineering Computer, Control and Elelectronic Engineering Sub-Study Program Head:
Project management processes of a project
INDUSTRY’S SMALLEST PFC BOOST IC
DC MOTOR INTERFACING WITH 8051 MICROCONTROLLER PRESENTED BY
The CIMM Central User Facility (CUF)
Safety Standards & Block-Block Interface Definitions
3 PHASE SEQUENCE CHECKER BY LED INDICATION
flow process control trainer
The Role of Design Practice in IP Development
Daniel Walczyk, PhD, PE Professor and Center Director.
Ministry of Health Maputo Mozambique
SCTE The National Center for Supply Chain Technology Education
TOPIC : PRODUCT AND SERVICE DESIGN
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Career Cluster Manufacturing.
SCA The National Center for Supply Chain Technology Education
ESD Protection 02/12/2018 Radiometer Medical ApS 2 December, 2018.
Michael McGrath Simple DC Motor Michael McGrath
Ver 2.0 SAFE An international organization dedicated to the preservation of human life! Our Mission: To provide a forum for information exchange, education,
National Nanotechnology Infrastructure Network
Korea Polytechnic University
Introduction (1) Let I introduce myself, I name Mr. Somsak Pukdeerattanamit, holding Master of Business Administration in Management and Bachelor of Science.
Rectifiers.
Electrical Apprenticeship Training
Presentation transcript:

Industrial Testing Education at Undergraduate Level: A Datasheet and Diagnosis Labs Approach EWME2010 Béatrice Pradarelli / Laurent Latorre / Pascal Nouet

Outline Introduction to CNFM/CRTC Labs oriented approach for industrial testing education of undergraduate students Future Developments

CNFM National Comity for Education in Nano and Microelectronics EWME2010

Micro/Nano-electronic industry CNFM centers RENATER Network CNFM Network Created 25 years ago to answer to the need of sharing high cost equipments (tester, cleaning room, …) for education Sponsored by French government & micro/nano electronic industry 12 CNFM centers strategically located

CNFM Missions To share equipments dedicated to IC manufacturing and characterization, prototyping, test of IC and SIP/SOC products and design automation tools To offer dedicated trainings to academic people (students and teachers) To develop collaborations with research labs and companies to promote innovation

CRTC: CNFM Test Resource Center Public organization, created in 1998, specialized in the test of microelectronic products. Located in Montpellier, south of FRANCE. Owner of an industrial tester, the Verigy V93K PinScale: Used for Education at undergraduate and L, M, D levels. Used for test engineering services (test time, support, consulting) to companies & research labs Accessible from anywhere

INDUSTRIAL TESTING EDUCATION AT UNDERGRADUATE LEVEL EWME2010

ICs testing in Mass production Millions of parts (ICs) tested automatically daily Rooms full of test equipments (tester/handler/prober) Skilled technicians in charge of the overall process

CRTC Environment and Network DEVICE UNDER TEST Optical Link

Lab Oriented Approach Pedagogical Objectives Initiate undergraduate students to industrial testing Guide them having a better understanding of the interaction between ICs design, manufacturing & test Data Sheet Test Prog. Test Results PF Analysis Diagnosis Device robustness versus design and manufacturing

From Data Sheet to Test Program Test Program Data Sheet Block diagram Pinning Operating conditions Truth table DC characteristics AC characteristics Test Program Test conditions: T (°C), Vcc Functional test Parametric tests: Vil/Vih/Vol/Voh and leakage measurements Timing tests: propagation delay, set up and hold times measurements Continuity Test Fonctional Test AC Test START DC Test

Test Results Analysis Manufacturing, assembly verification Industrial test concept Protection diodes on each pad ESD damages / wrist strap usage Continuity Test Functional Test AC Test START DC Test

Test Results Analysis Device behavior verification Go/no Go test Test flow execution order, test strategy, cost of test Continuity Test Functional Test AC Test START DC Test Pass (Go) Fail (No Go) Fonctional f1 Fonctional f2<f1 $ $$$

Test Results Analysis Electrical and timing parameters verification Measured values vs data sheet ones Product characterization: shmoo plots Product robustness versus process Continuity Test Functional Test AC Test START DC Test margin LLUL

Failing Device FPGA approach to insert stuck at/delay faults SWITCHES MODE DELAY Good IC Schematic + new lines

Diagnosis Understanding the failures and finding the root cause in the IC using the tester debugger tools Interaction between Test, Design, Design for Testability (DFT) and process Sa1 S1

Summary CRTC test activities and organization offer test services and trainings to academic, research lab and industrial people. Lab oriented approach to initiate undergraduate students to industrial testing in 8 hours deployed since 2008: 50 students attended. Next: develop a new lab using the FPGA platform and addressing the DFT, fault simulations, SCAN test concepts EWME2010