How Do You Test an IT Service? Pete Green Tom Frey.

Slides:



Advertisements
Similar presentations
SAP Organization Change Management (OCM)
Advertisements

Marc Grégoire, DRDC Ottawa Luc Beaudoin, Bologik Inc.
28 NOVEMBER 2011 SUSTAINABLE WATER MANAGEMENT PLAN TASK 1 – DETAILED WORK PLAN.
Presented by: Kreg McCall. Baseline Management & Control Define Baseline Baseline Types How to Generate a Baseline Baseline Setup for Success Baseline.
GCSS-J Best Agile Practices. 2 LTG Gainey, JS/J4 Ops Sponsor: “I want capability delivered in dog-years!” GCSS-J Program Overview Joint Logistics Environment:
Line Efficiency     Percentage Month Today’s Date
1 1 UNITED STATES ARMY EVALUATION CENTER Chris Wilcox US Army Evaluation Center Mission-Based T&E Primer v1.3, 2.
A framework for describing IT Project Management Processes and Tool Set Features Enterprise Project Management Framework.
Project Plan The Development Plan The project plan is one of the first formal documents produced by the project team. It describes  How the project will.
COMP8130 and 4130Adrian Marshall 8130 and 4130 Test Management Adrian Marshall.
Overview 4Core Technology Group, Inc. is a woman/ veteran owned full-service IT and Cyber Security firm based in Historic Petersburg, Virginia. Founded.
Defense Information Systems Agency A Combat Support Agency DISA Quality Management Program Operations DISA Circular Review August 2011 v5.
Project Management Fundamentals Project Organization and Integration
Air Force Doctrine Document 2-1: Air Warfare
Enterprise Systems Upgrade Program “A foundation for future innovation…” Financial System Users Network.
DEVELOPMENTAL TEST & EVALUATION DT&E – From Concept to Combat Integrated Test Process Darlene Mosser-Kerner Developmental Test & Evaluation OUSD(AT&L)/Systems.
Montgomery County, Maryland DTS CMMI Approach & Implementation Mike Knuppel 03/20/2006.
NMI End-to-End Diagnostic Advisory Group BoF Fall 2003 Internet2 Member Meeting.
TOWR-G Test for Operational Weather Readiness with GOES-R Joe Zajic NWS Office of Science & Technology – Science Plans Branch Integrity Applications Incorporated.
Microsoft’s ALM Vision. Vision and benefits ALM today ALM outlook.
Improving the Tradecraft in Services Acquisition Services Acquisition Training Lyle Eesley Defense Acquisition University Director Center for Services.
Contract Year 1 Review IMT Tilt Thompkins MOS - NCSA 15 May 2002.
1 United States Joint Forces Command United States Joint Forces Command Joint Concept Development and Experimentation (JCD&E) Interagency and Multinational.
JNTC Joint Management Office
ProjectImpactResourcesDeadlineResourcesDeadline Forecast Plan Time Resources Risk 001xx 002xx 003xx 004xx 005xx 006xx 007xx TotalXX Example 1: Portfolio.
 Overview of Project management. ◦ Management. ◦ Project Management. ◦ Software Project Management. ◦ Project(Dimensions, Characteristics, Complexity,
Project Execution Methodology
Gantt Chart of Progress FY
Life Cycle Logistics.
Individual and Staff Joint Training Working Group
Jan 2016 Solar Lunar Data.
IT Strategy Roadmap Template

Acquisition Sustainment Tool Kit (ASTK
Phase 4 Tollgate Review Discussion Template
Phase 4 Tollgate Review Discussion Template
Establishing Strategic Process Roadmaps
The Process Owner is the Secret Agent!
Phase 4 Tollgate Review Discussion Template
SmartMeterTM Steering Committee Update – September 2012
Average Monthly Temperature and Rainfall
Testing in the Context of the Operational Mission Mike Toole Army Future Combat Systems System Of Systems Test 4 March 2003.
Mission Command Center Excellence Directorate of Training
Mission Command Center Excellence Directorate of Training
IS4680 Security Auditing for Compliance


Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Gantt Chart of Progress FY

WG ESA meeting 9th of March 2015
Missile Defense Agency EVM Update
SC SC SC WS SC S HIS Background document Seminar document

Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3

Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3

Pilot of revised survey
Bridging the ITSM Information Gap
Bridging the ITSM Information Gap
Change Management E2E Roadmap
Presentation transcript:

How Do You Test an IT Service? Pete Green Tom Frey

Purpose Explore evolving influence of IT systems and services on weapons systems Explore evolving influence of IT systems and services on weapons systems Increasing complexity of testing Increasing complexity of testing Our experience foundation is in NMCI Our experience foundation is in NMCI Foci are the test processes Foci are the test processes

How Did We Get Here? JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN TESP Input Delivered Veridian sole sourced By EDS to conduct NMCI CT&E BSA conducted at 4 test sites Master Test Plan Development CT&E 1 Testing Conducted CT&E 3 Testing CT&E 2 Testing Master Test Plan Completed & Delivered Interoperability Testing & Monitoring Plan Delivery Contract SLAs mapped to COIs NMCI Contract Awarded to EDS NMCI Designated DOT&E Oversight Program DASN Directs TESP for NMCI

Rolling In Compressed Schedule Compressed Schedule No Traditional Program Documentation No Traditional Program Documentation Our Response Based on 4-step Test Process Our Response Based on 4-step Test Process Build Up (Crawl, Walk, Run) Build Up (Crawl, Walk, Run) Concentric Testing Concentric Testing Familiar Fundamentals Familiar Fundamentals Faces Faces Processes Processes

Test Approach BSA BSA Phased Testing Phased Testing CTE1 - DT (lab, bench) CTE1 - DT (lab, bench) CTE2 - DT (networks) CTE2 - DT (networks) CTE3 - DT/OT (operational vignettes) CTE3 - DT/OT (operational vignettes) OPEVAL - OT OPEVAL - OT SLA based - derived CTPs, COIs, SLA based - derived CTPs, COIs,

Test Approach

IT Testing Similar to Early Aviation Testing Similar to Early Aviation Testing How fast can you go? How fast can you go? How high can you go? How high can you go? OSI layer 1-3 centric OSI layer 1-3 centric Parameter focus Parameter focus

IT T&E and the OSI 7-Layer Model Where We need to be Mission Based Present Commercial IT Testing Parametric Is This System Effective and Suitable? How Fast Can This Car Go? Physical Data Link Network Transport Session Presentation Application

Product Line Maturity Systems Maturity Aircraft Avionics Software Networks

C4I Testing Success of testing tied to maturity of program execution Success of testing tied to maturity of program execution OTRR OTRR Schedule Constraints Schedule Constraints IP systems generate lots of data IP systems generate lots of data Program Execution curve is fractal Program Execution curve is fractal Processes on critical path provide 1st order approximation Processes on critical path provide 1st order approximation Use of surveys Use of surveys A o A o

Testing and Program Execution

Test Issues NMCI equal to or better than legacy networks NMCI equal to or better than legacy networks Critical path processes Critical path processes Seat cutover Seat cutover Legacy applications Legacy applications SLAs to COIs not a reversible function SLAs to COIs not a reversible function Operationalizing the metrics Operationalizing the metrics Early and combined CT/OT to minimize risk Early and combined CT/OT to minimize risk

Baseline System Assessment Innovative contract vehicle Innovative contract vehicle Lack of traditional documentation Lack of traditional documentation Needed to measure the performance of the legacy systems for comparison with NMCI Needed to measure the performance of the legacy systems for comparison with NMCI

BSA Tools AMP AMP NetIQ NetIQ MIB scripts MIB scripts Help Desk Logs Help Desk Logs BelManage BelManage Surveys Surveys End user End user CIO and IT professionals CIO and IT professionals Information Assurance Information Assurance Use same tools and processes for OPEVAL Use same tools and processes for OPEVAL

BSA Lessons Learned Configuration management is historical Configuration management is historical Good management makes an immediate impact Good management makes an immediate impact Firewalls and IDS Firewalls and IDS Routers Routers Connectivity Connectivity Legacy applications Legacy applications

TESP Process Similar to a TEMP Similar to a TEMP More responsive More responsive If it was not necessary, it was not included If it was not necessary, it was not included If it was necessary, it was tailored to NMCI If it was necessary, it was tailored to NMCI From blank sheet to approval in under 11 months From blank sheet to approval in under 11 months Represented a strategy for success for NMCI Represented a strategy for success for NMCI

The State of IT Testing Today Operational assessments of interoperability and information assurance in fielded systems Operational assessments of interoperability and information assurance in fielded systems Inverse correlation of interoperability and information assurance Inverse correlation of interoperability and information assurance Mission Thread Analysis Mission Thread Analysis Blue, Green, and Red Teams Blue, Green, and Red Teams Common Toolkits Common Toolkits Information Operations Threat Capabilities Summaries Information Operations Threat Capabilities Summaries Feedback and feed forward Feedback and feed forward

Interoperability vs. Information Assurance: A Complex Challenge Interoperability (Iop) Information Assurance (IA) Iop(a x ) = b y IA An Enterprise System Needs to Balance Iop and IA

Testing Frameworks Device Testing System Testing System of Systems Testing Work Flow Threads Mission-Focused Testing A Z

Example Mission Thread (ATO Distribution) BCD PLNS WS GCC Prioritized Target List KCOIC 1 TWM & CTB-AM Server KCOIC CTAPS WS HTACC CTAPS APS Server CTAPS ADS Server HTACC CTAPS WS RELROK WAN Integrated Tasking Order 7 KCOIC CTAPS WS KCOIC GCCS-K C2/COP WS CTAPS ITODB Server RELROK WAN ROK AF (Suwon) CTAPS TGT WS 5 KUNSAN CTAPS TGT WS 6 Training Facility GCCS-K Web Server RELROK WAN CP TANGO GCCS-K C2/COP WS 8 RELROK WAN ACC Target Nomination ITO Sent to TL # 1,6

Level of Perf Situation Conditions Joint Mission Areas UJTL Assigned CoCom Missions CoCom JMETs Lessons Learned CCTI Strategies Commanders Training Guidance Exercise Objectives Joint Doctrine TT&Ps Training Objectives Training Objectives BLUFOR OPLAN OPFOR Campaign Control Plan Scenario MSEL Collection Management Plan Integrated Architectures C4ISP Exercise Comm/Sys Architecture Mission Functional Threads Mission Functional Threads Execution Assessment Plan Assessment Plan Performance Data Performance Analysis After Action Review System SMEs Mission SMEs Operational Testers MISSION ISSUES EXERCISE ISSUES SYSTEM ISSUES PERFORMANCE ASSESSMENT Standards Assessment Methodology Flow JTS

QUESTIONS?