IEEE WG Opening Report – July 2008

Slides:



Advertisements
Similar presentations
IEEE WG Closing Report – July 2006
Advertisements

LB84 General AdHoc Group Sept. Closing TGn Motions
LB84 General AdHoc Group Sept. Closing TGn Motions
[ Interim Meetings 2006] Date: Authors: July 2005
March 2013 Opening Report Date: Authors: March 2013
IEEE WG Status Report – July 2005
LB73 Noise and Location Categories
LB73 Noise and Location Categories
WRAN Protocol Reference Model(PRM)
Waveform Generator Source Code
IEEE WG Status Report – July 2005
March 2014 Election Results
IEEE WG Closing Report – July 2006
TGp Closing Report Date: Authors: July 2005 Month Year
TGp Closing Report Date: Authors: July 2007 Month Year
Attendance and Documentation for the March 2007 Plenary
Attendance and Documentation for the March 2007 Plenary
[ Policies and Procedure Summary]
[ Policies and Procedure Summary]
Motion to accept Draft p 2.0
November 2013 Opening Report
TGp Motions Date: Authors: November 2005 Month Year
TGp Closing Report Date: Authors: March 2006 Month Year
On Coexistence Mechanisms
TGu-changes-from-d0-02-to-d0-03
TGp Closing Report Date: Authors: May 2007 Month Year
IEEE P Wireless RANs Date:
IEEE WG Opening Report – March 2007
On Coexistence Mechanisms
TGp Closing Report Date: Authors: March 2006 Month Year
Reflector Tutorial Date: Authors: July 2006 Month Year
TGv Redline D0.07 Insert and Deletion
TGv Redline D0.06 Insert and Deletion
Experimental DTV Sensor
July 2012 Opening Report Date: Authors: July 2012
Opening Report – November 2005
“Comment Status” Definitions
IEEE P Wireless RANs Date:
Spectrum Sensing Tiger Team
TGu-changes-from-d0-01-to-d0-02
LB73 Noise and Location Categories
March 2012 Opening Report Date: Authors: March 2012
TGy draft 2.0 with changebars from draft 1.0
TGv Redline D0.10 Insert and Deletion
IEEE WG Status Report – March 2006
IEEE WG Opening Report – July 2007
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
TGp Closing Report Date: Authors: March 2007 Month Year
November Opening Report
TGu-changes-from-d0-02-to-d0-03
[ Policies and Procedure Summary]
EC Motions – November 2005 Plenary
Liaison Report From Date: Authors: Month Year
Beamforming and Link Adaptation Motions
IEEE P Wireless RANs Date:
November 2012 Opening Report
Draft P802.11s D1.03 WordConversion
Questions to the Contention-based Protocol (CBP) Study Group
January Opening Report
IEEE P Motions at the July Plenary EC Meeting
Advanced Beaconing Schedule and Timelines
Motion to go to Letter Ballot
EC Motions – July 2005 Plenary
TGu-changes-from-d0-04-to-d0-05
TGp Closing Report Date: Authors: January 2006 Month Year
TGu-changes-from-d0-03-to-d0-04
TGp Closing Report Date: Authors: November 2006 Month Year
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
TGp Motions Date: Authors: January 2006 Month Year
May 2012 Opening Report Date: Authors: May 2012
Presentation transcript:

IEEE 802.22 WG Opening Report – July 2008 Month Year doc.: IEEE 802.22-yy/xxxxr0 July 2008 IEEE 802.22 WG Opening Report – July 2008 IEEE P802.22 Wireless RANs Date: 2008-07-14 Authors: Notice: This document has been prepared to assist IEEE 802.22. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.22. Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures http://standards.ieee.org/guides/bylaws/sb-bylaws.pdf including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair Carl R. Stevenson as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE 802.22 Working Group. If you have questions, contact the IEEE Patent Committee Administrator at patcom@iee.org. > Carl R. Stevenson, WK3C Wireless LLC John Doe, Some Company

IEEE 802.22 WG Opening Report – July 2008 802.22 Status WG closed its first WG Ballot on 802.22 D1 just before the May 2008 Interim in Jacksonville Just under 1000 comments received Comment Resolution is under way WG closed its first recirculation Ballot on 802.22.1 just before the May 2008 Interim in Jacksonville Comment Resolution is under way (most comments have been resolved) Approval ratio is currently at 84-85% and could approach 100% if the remaining few comments can be resolved to the satisfaction of the commenters Possibility for a request for conditional approval for sponsor ballot at the end of this week Carl R. Stevenson, WK3C Wireless LLC