HIE-ISOLDE contribution packages

Slides:



Advertisements
Similar presentations
COOLING TUBE ACCELERATING STRUCTURE MANIFOLD COUPLER VACUUM INTERFACE FLANGE RF INTERFACE FLANGE TUNING STUD ENGINEERING DESIGN AND FABRICATION OF X-BAND.
Advertisements

C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
David H. Dowell Injector April 29-30, 2004 LCLS Injector Overview D. H. Dowell, SLAC FAC Review April 29-30, 2004 Injector.
Special Linac WG meeting: Assembly of the ISOLDE Cryomodules – HIE-ISOLDE Survey and Alignment – March 19 th 2014 Jean-Christophe GaydeEN/MEF-SU Guillaume.
Discussion. Help Needed for Splice Consolidation Opening and closing W (20 FTE’s) Repair, reinstall and tack PIM’s (2) Orbital machining of M sleeves.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Status of X-band program at RadiaBeam
HIE-ISOLDE Project: Status Report EXTRA COSTS AND ADDITIONAL RESOURCES CERN, 29 January 2013 Yacine Kadi.
ATLAS Intensity and Efficiency Upgrade ATLAS USERS MEETING Speaker: Mike Kelly Physics Division May 15, 2014.
HIE-ISOLDE contribution packages M. Pasini BE/RF.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
HIE-ISOLDE Project Status Report
ISTC Project #3888 Development, manufacture and experimental investigation of a unique pilot CCDTL accelerating section in the energy range of MeV.
Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Beam Instrumentation for the HIE-ISOLDE linac Francesca Zocca ISOLDE Workshop and Users Meeting December CERN Instituto de Estructura de la.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
HIE-ISOLDE Project Y. Kadi (EN-STI) On behalf of the HIE-ISOLDE Coordination team.
HIE-ISOLDE Project Status Report
CLIC work packages CTF3-003 (TBL+) CLIC0-001 (CLIC DB injector) CLIC0-002 (photo injector option for CLIC DB injector.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
RHIC 56 MHz Cryomodule Informational Review RHIC Integration Cross-sectional view of 56 MHz Cavity in Vacuum Vessel.
February 17-18, 2010 R&D ERL Gary McIntyre R&D ERL ERL Status & Schedule Gary McIntyre February 17-18, 2010 ERL Status & Schedule.
K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical.
Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
7-Sep-2011 CLIC RF Structure Development Meeting «BE/RF» TD26 WITH COMPACT COUPLER FOR CLEX (TD26 CC SiC) ENGINEERING DESIGN this structure will be used.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Slide 1 of 10Matthew Fraser – CI MEW Meeting, 25 th October 2010.
O. Kester, NuSTAR annual meeting, 27/02/2013
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
HIE-ISOLDE Status Report Yacine Kadi on behalf of HIE-ISOLDE project team ISOLDE Annual Workshop, 5 December 2011.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
ASTA Latest Update E. Harms April Photoelectrons first produced at ASTA on 20 June 2013 –Molybdenum (uncoated) cathode ‘Routine’ Electron operation.
WP1: Superconducting Cavity Developments and Tests Walter Venturini Delsolaro Mid Term Review Meeting, 26 September 2012 CATHI Marie Curie Initial Training.
ISTCInternational Science and technology Center, MoscowOfficial Coordinator BINPBudker Institute of Nuclear Physics of Siberian Branch of Russian Academy.
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
CERN – ENGINEERING DEPARTMENT: A. Dallocchio on behalf of EN-MME
LCWS11 WG4 Fully featured accelerating structure engineering design
CERN – ENGINEERING DEPARTMENT: A. Dallocchio on behalf of EN-MME
Results of the Risk Analysis
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
Complementary ISTC Projects #3888, 3889p
BE-BI Software for LINAC4
Update on HW commissioning
Hosting Orsay Walid KAABI
Tango status at Elettra
HIE-ISOLDE Status Report
UK RFD Pre-Series cryomodule
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
HIE-ISOLDE Project: Planning & Resources
Report on HIE-ISOLDE Status & International Advisory Panel Meeting
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC
HIE-LINAC status report
HIE-ISOLDE Project: Status Report
Electron Source Configuration
PH Dept News Long shutdown 1: Baseline Project
Report on HIE-ISOLDE Status
CERN’s MidTermPlan and the consequences for HIE-ISOLDE
INFN and the ILC S. Bertolucci, INFN.
Presentation transcript:

HIE-ISOLDE contribution packages M. Pasini BE/RF

HIE-ISOLDE Schedule PSB SHUTDOWN Physics @ 5.5 A MeV 5.5 MeV/u Linac commissioned 10 MeV/u Linac commissioned 58th ISCC Meeting, 23 June 2010 Y. KADI 2

Cu substrate Cavity Package Description: high precision 3D copper machining. Cost:33kCHF/unit Quantity: 10 to 22 Technical Specs: Available Timing: ASAP Nature: in-kind and funding, industrial involvement Manpower: 0.1 FTE for quality control

RF Special Components Package Description: the package consists in the realization of the high precision tuning system with relative mechanical driving system and high power coupler system. Cost:46 kCHF/unit Quantity: 10 to 22 Technical Specs: Available Timing: ASAP Nature: in-kind and funding Manpower: 0.3 FTE for Quality control and assembly

Cryomodule Package Description: the cavity package consists in the realization of the vacuum vessel which will house the SC cavities and solenoid. Cost:600 kCHF/unit Quantity: 2 to 4 Technical Specs: available at the end of 2010 Timing: starting mid 2013 Nature: in-kind and funding Manpower: 1FTE specialized technician able to work in the cleaning room

Beam Diagnostics Short Box Package Description: the beam diagnostics short box package consists in the realization of a ultra compact highly engineered chamber filled with new generation of precision measurement devices for the SC linac, namely beam position, profile and intensity. Cost:46 kCHF Quantity: 6 Technical Specs: available at the end of 2011 Timing: first installation foreseen by end 2013 Nature: in-kind and funding Manpower: 0.3 FTE specialized technician + 0.3 FTE application engineer

Emittance meter Package Description: this package consists in the realization of a new generation of high sensitivity emittance meter for ultra low intensity radioactive beam intensity Cost:70 kCHF Quantity: 1 Technical Specs: Available at the end of 2011 Timing: installation foreseen by end of 2013 Nature: in-kind and funding Manpower: 1 FTE engineer

Beam Energy Measurement Package Description: this package consists in the realization of silicon/diamond detectors that will be used to measure the beam energy and energy profile and will allow the tuning if the SC cavities Cost:50 kCHF Quantity: 1 Technical Specs: available at the end of 2010 Timing: ASAP Nature: in-kind and funding Manpower: 0.5 FTE physicist

Beam lines Package Description: Fully equipped high energy beam transfer line for different experiments Cost:~700kCHF/line Quantity: 3 Technical Specs: Available by end of 2010 Timing: first beam line to be installed by end of 2012 Nature: in-kind and funding Manpower: 1 FTE installation and alignment

Possible extension for HIE-ISOLDE (Jura side)

Possible extension for HIE-ISOLDE (Geneva side without labs)

Possible extension for HIE-ISOLDE (Geneva side including labs)