A 12-min Introduction to The ILC Machine Detector Interface and SiD

Slides:



Advertisements
Similar presentations
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Advertisements

Global Design Effort Goals and Introduction Andrei Seryi, SLAC, September 17, 2007.
ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 1.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
NLC - The Next Linear Collider Project IR Working Group Summary Tom Markiewicz LC R&D Workshop, UCSC June 29, 2002.
Push Pull Considerations
Global Design Effort Detector concept Plenary introductory talk IRENG07 Kurt Krempetz September 17, 2007.
SiD Forward Region Tom Markiewicz/SLAC KILC’12, Taegu, Korea 24 April 2012.
NLC - The Next Linear Collider Project NLC Backgrounds What’s New? Tom Markiewicz LC’99, Frascati, Italy October 1999.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
1 ILD/CMS Engineering Meeting M. Joré – ILD integration philosophy Integration philosophy of ILD Matthieu Joré – January 21st Integration of the subdetectors.
SID Engineering Marco Oriunno (SLAC), Jan CLIC Workshop, CERN Toward the TDR.
M.Oriunno, SLAC ALCPG September ‘09 ILD 1 Progress on Push-Pull IR Studies Marco Oriunno, SLAC A.Herve (ETH-Zurich), K.Simran (DESY) A.Seryi, T.Marckiewicz,
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
Re-evaluating the Need for a anti-DID in SiD T. Markiewicz/SLAC SiD Optimization Meeting
PD5: Detector Integration / Machine Detector Interface T. Markiewicz/SLAC 15 May 2014 SiD Meeting / AWLC Fermilab Summary.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Beam Commissioning Marco Oriunno (SLAC), May 14, 2014 ALCW 2014, Fermilab Engineering Issues.
Philip Burrows SiD Meeting, Paris 11/02/081 Machine Detector Interface Issues Philip Burrows John Adams Institute Oxford University Thanks to: Tom Markiewicz.
September 18, 2007H. J. Krebs1 SiD Collaboration One Piece End Door Design Concept plus Forward Equipment Interfaces H. James Krebs SLAC September 18,
SiD Engineering: Iron and Solenoid Design Kurt Krempetz (Layer 5) (Layer 1) VXD.
Guinyun Kim (KNU, Korea) International Linear Collider Workshop 2010 Beijing, China, March 2010 Summary of Machine Detector Interface.
LOI Planning The Very Forward Region Tom Markiewicz/SLAC Takashi Maruyama/SLAC Uriel Nauenberg/UCB SiD Collaboration Meeting, Boulder, CO 19 September.
SiD IR & MDI Engineering Progress Prelude to a Discussion of Integration with ILD and Based on Marco Oriunno’s Jan 2008 Talk at SiD CM Tom Markiewicz/SLAC.
Detector design optimization for push-pull IR and for surface assembly and corresponding IR requirements Tom Markiewicz/SLAC SLAC BDS Kick-Off-Meeting.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
SiD Machine Detector Interface (MDI) Tom Markiewicz/SLAC ALCW 2015, KEK, Japan 23 April 2015.
MDI DBD Editors Report Tom Markiewicz/SLAC SiD Collaboration Meeting, SLAC 22 August 2012.
Septembre SLAC BeamCal W. Lohmann, DESY BeamCal: ensures hermeticity of the detector to smallest polar angles -important for searches Serves as.
1 FONT IP Feedback System Implications of increase of L* Philip Burrows John Adams Institute Oxford University.
1 SiD Push-pull Plans Marco Oriunno, SLAC International Workshop on Linear Colliders 2010 Geneva, October 2010 M.Oriunno, IWLC10 – Geneva, Oct.2010.
Interaction Region & IR integration EDR Planning Tom Markiewicz/SLAC SLAC BDS Kick-Off-Meeting 13 October 2007.
CLIC Machine-Detector Interface Working Group (MDI) Emmanuel Tsesmelis CERN TS/LEA CLIC-ACE of 3 September 2008.
NLC - The Next Linear Collider Project Machine-Detector Interface Tom Markiewicz LC R&D Opportunities, SLAC May 21, 2002.
March 3-6, 2008 Global Design Effort 1 BDS way forward summary for GDE-BDS Andrei Seryi, SLAC Thanks to all participants of GDE-BDS and ACFA-MDI sessions.
Global Design Effort CLIC-ILC BDS & MDI work Materials for discussion Daniel Schulte, Rogelio Tomas and Emmanuel Tsesmelis for CLIC team Andrei Seryi for.
SiD IR & MDI Status & Comments Tom Markiewicz/SLAC ALCPG, Fermilab 26 October 2007.
SiD Engineering and Solenoid Kurt Krempetz (Layer 5) (Layer 1) VXD.
IR/Backgrounds & Beam Instrumentation Summary Tom Markiewicz/SLAC ALCPG’09, UNM, Albuquerque 3 October 2009 Six Sessions, 20 talks Instrumentation: –WAB.
MDI towards technical design Lau Gatignon. Very preliminary ! To trigger discussions.
Re-evaluating the Need for a anti-DID in SiD T. Markiewicz/SLAC SiD Optimization Meeting Updated
SiD Collaboration Meeting Highlights Tom Markiewicz/SLAC ILC BDS Meeting 08 May 2007.
An Hybrid QD0 for SID ? Marco Oriunno (SLAC), Nov. 14, 2013 LCWS13, TOKYO.
Philip Burrows MDI Panel Meeting 15/08/06 Philip Burrows John Adams Institute Oxford University SiD and IR/MDI Issues.
September 20, 2007H. J. Krebs/B. Wands/B. Cooper1 SiD Collaboration Preliminary End Door Design Concept Support of Forward Systems H. James Krebs Bob Wands.
COMPENSATION OF DETECTOR SOLENOID FIELD WITH L*=4.1M Glen White, SLAC April 20, 2015 ALCW2015, KEK, Japan.
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
MEA Machine and Experiment Assembly Norbert Meyners, MEA 12. July 2007ILC IRENG07 WG-A1 LDC Engineering Design (Status) Introduction General Design Detector.
Philip Burrows SiD Monthly Phone Meeting, 4/10/071 IR Issues from IRENG07 Philip Burrows John Adams Institute Oxford University.
12 July 2007IRENG07 WG-A M. Breidenbach1 SiD Concept SiD is relatively modest in scale compared to the LHC detectors, and comparable to SLD: Tracker Radius.
SiD MDI Update Topics for Discussion Tom Markiewicz/SLAC ILC BDS Meeting 15 May 2007.
Octobre LAL Orsay Report from the IRENG07 workshop at SLAC W. Lohmann, DESY from Septembre 17 – 21, ~ 100 participants - plenary and parallel sessions.
Fast Beam Collision Feedbacks for luminosity optimisation at next-generation lepton colliders Philip Burrows John Adams Institute Oxford University.
Machine Detector Interface Design Updates
ILC Interaction Region and Machine Detector Interface
Layout of Detectors for CLIC
Extract from: Minimal BDS and other thoughts
Detector Service Cavern for ILC
Testbeam plans for LEP instrumentation
Beam Delivery update Andrei Seryi December 12, 2005
Changes to SiD since the DBD
CLIC-ILC BDS & MDI work.
MACHINE DETECTOR INTERFACE WORKING GROUP STATUS
Radiation Physics requirements for the IR
Guinyun Kim (KNU, Korea) International Linear Collider Workshop 2010
SiD IR Layout M. Breidenbach, P. Burrows, T. Markiewicz
CLIC Detector CERN Status + plans
Beam Delivery System Schedule at ILC2010
SiD IR Layout M. Breidenbach, P. Burrows, T. Markiewicz
Presentation transcript:

A 12-min Introduction to The ILC Machine Detector Interface and SiD Tom Markiewicz/SLAC LCWS’10, Beijing, China 27 March 2010

QD0 Support System Vibration-cognizant support of the final quadrupole (“QD0”) cryostat and its semi-permanently attached 1.9K heat exchanger & feed box, consistent with “Push/Pull” motion of the detector QD0 “owned” by SiD & rests on door Not cantilevered off a rear support (ILD) Not in unmoveable tunnel extension (CLIC) QD0 travels “cold” along w/ SiD during push/pull after beamline vacuum broken at designated valves Vibration mitigated by having facing QD0 lenses as logically connected to the supporting bedrock floor as possible & relying on coherence length of natural seismic ground motion to correlate motion of lenses while minimizing/eliminating all vibration sources that SiD or BDS equipment in IR hall might produce Prejudice AGAINST a platform as it might serve to amplify motion to detector Benefit from Barrel-Door design that does not have a “Salami-sliced” barrel ANSYS studies of QD0 vibration begun in 2009 & to be updated at this conference tomorrow (Oriunno) 2010.03.28 SiD MDI-LCWS’10 T. Markiewicz/SLAC

2m Door opening Procedure, on the beam I Active stabilizers Shielding QD0 QDF Spacer structure Rails on the support tube 2010.03.28 SiD MDI-LCWS’10 T. Markiewicz/SLAC

2m Door opening Procedure, on the beam II Active stabilizers Shielding QD0 QDF Spacer structure Rails on the support tube 2010.03.28 SiD MDI-LCWS’10 T. Markiewicz/SLAC

2m Door opening Procedure, on the beam III Active stabilizers Shielding QD0 QDF Spacer structure Rails on the support tube 2010.03.28 SiD MDI-LCWS’10 T. Markiewicz/SLAC

Integration of the QD0 cryoline He2 cryoline QD0 service cryostat Ancillary platform 2010.03.28 SiD MDI-LCWS’10 Hilman Rollers T. Markiewicz/SLAC

QD0 Alignment System Conceptual 5 d.o.f. magnet mover system to satisfy the alignment requirements of the beam delivery system proposed but needs an engineering design As in FFTB (now at ATF2) As used for LCLS wigglers “Mona Lisa” Frequency Scanning Interferometry system with associated free lines of sight to confirm alignment suggested but not currently included in SiD baseline 2010.03.28 SiD MDI-LCWS’10 T. Markiewicz/SLAC

Example (SiD) of QD0 support with 5-DOF magnet mover system 460 mm 390 mm 2 d.o.f. View A-A 3 d.o.f. Steppers QD0 Cryostat Cam-wedges Shaft Steppers View A-A 2010.03.28 SiD MDI-LCWS’10 T. Markiewicz/SLAC M. Oriunno, SLAC

Integration of the “R20” region “R20” region = all detectors within ~20cm of beamline): beampipe, FCAL=LumiCal + Beamcal, Masking, Feedback BPMs & Kickers, Vacuum pumps(?) Conceptual solution to support massive Lumical+mask+Beamcal cantilevered from nose of QD0 Effect on QD0 vibration stability Precise and reproducible positioning of Lumical 2010.03.28 SiD MDI-LCWS’10 T. Markiewicz/SLAC

R20 Detailed Schematic 2010.03.28 SiD MDI-LCWS’10 T. Markiewicz/SLAC

Current Implementation of FCAL support & Alignment Movers 2010.03.28 SiD MDI-LCWS’10 T. Markiewicz/SLAC

Support and locomotion of SiD within the IR Hall Hot Button Compatibility Issues with ILD tend to make this subject dominate MDI discussions Platform (or not) solution Prejudice is that it exposes SiD to increased vibration risk Rollers, airpads, strand jacks Height difference General agreement to try to move from “personal experience based prejudices” to decision based on prototypes and measurements 2010.03.28 SiD MDI-LCWS’10 T. Markiewicz/SLAC

SiD Preferred Push/pull locomotion Hilman rollers strands jacks Hilman rollers 2010.03.28 SiD MDI-LCWS’10 T. Markiewicz/SLAC

Off-the shelf Strand Jacks 2010.03.28 SiD MDI-LCWS’10 T. Markiewicz/SLAC

SiD on Half-Platform Stored in Lateral Alcoves (rejected) 2010.03.28 SiD MDI-LCWS’10 T. Markiewicz/SLAC

SiD on a platform (under study) T. Markiewicz/SLAC 2010.03.28 SiD MDI-LCWS’10 T. Markiewicz/SLAC

Proposed Roller & Support Sceme for a Platform View from below (Rollers) 10kt unit Anti-Seismic support Four support lines for 4’000 tons each 2010.03.28 SiD MDI-LCWS’10 T. Markiewicz/SLAC 17 17

Radiation Shielding design & associated calculations Hinged Pacman to make SiD “Self-Shielded” when on beamline 2010.03.28 SiD MDI-LCWS’10 T. Markiewicz/SLAC

20 R.L. Cu target in IP-14 m µSv/lost_train. 500 GeV, 9 MW Mario Santana/SLAC 2010.03.28 SiD MDI-LCWS’10 T. Markiewicz/SLAC

Other “MDI” Topics Not Discussed Today Fringe Field specification & compliance Calculation of & remediation of beam-beam backgrounds and incoming beam backgrounds Pairs from beamstrahlung Muons from collimation Synchrotron radiation Photons IR Hall Design Sizes, Heights, Crane Capacity, Shaft diameters, etc. Hall Services Cryo systems, power supplies, readout, racks, etc. Assembly Procedures Above Ground (CMS) or below groud Sometimes “LEP”=Luminosity, Energy & Polarization measurement devices Sometimes the FCAL devices themselves 2010.03.28 SiD MDI-LCWS’10 T. Markiewicz/SLAC

Summary of ILC MDI A complete conceptual MDI design is documented in the SiD LOI and October 2009 talks at ALCPG’09 Albuquerque People involved: Marco Oriunno  Phil Burrows Takashi Maruyama Mario Santana Marty Breidenbach  TWM SiD is not yet doing the kind of work required for an engineering design (e.g. 2012 TDR) nor keeping up (imho) with the quality of prototyping and measurements we are seeing from ILD and CLIC There are many areas where more help would be useful and welcome 2010.03.28 SiD MDI-LCWS’10 T. Markiewicz/SLAC