DSC ChMC CSS update 6th July 2018

Slides:



Advertisements
Similar presentations
Senior Stakeholder Forum 04/02/2014. Agenda UK-Link Programme Update –Including Data Cleansing Update Nexus Modification Update Faster Switching EU Reform.
Advertisements

Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Grid Code What is the Standard Modification Process? Panel
PARCA Timeline Transmission Workgroup 4th July 2013 Rhys Ashman.
XRN4361 – UK Link Release 2 - Delivery
DSC ChMC CSS update 13th June 2018
Cutover & Implementation Aggregated Programme RAG
DSC ChMC CSS update 7th November 2018
Overall Project RAG Status
R&N Timeline Release 2 Release 3 Feb-19 June-19
DSC ChMC CSS update 10th October 2018
2019 Release Planning Options inc Modification 0621 / GB Charging Project DSC Change Management Committee update July 2018.
DSC ChMC CSS update 8th August 2018
CSS Update for CoMC 19th September 2018
Exit Capacity Substitution and Revision
DSC ChMC CSS update 11th December 2018
Chris Warner UNC Modification Panel 21 December 2017
XRN4361 – UK Link Release 2 - Delivery
Change Proposals Capture to Delivery
DSC ChMC CSS update 13th February 2019
Overall Project RAG Status:
R&N Timeline June-19 Sept-19 (EUC) Nov-19 Minor Release D4
DSC Governance Sub Group Recommendations
Ofgem Switching Programme: Central Switching Service consequential change update 9th May 2018.
DSC ChMC CSS Consequential Update 13th March 2019
XRN Nov 19 Release - Status Update
XRN Nov 19 Release - Status Update
4361 – UK Link Future Release 2
Release 3 Update 07th March 2018.
PARCA Timeline.
Release 3 Scope & Proposed Plan
Change Management Committee – Retail & Networks Update
Ofgem Switching Programme: Central Switching Service consequential update 16th May 2018.
4361 – UK Link Future Release 2
4340 – UK Link Future Release 2
Overall Project RAG Status
Key Value Indicators (KVIs) Version 3.0
DSC ChMC CSS update 09th January 2019
XRN Feb 19 Minor Release - Status Update
DSC ChMC CSS update 12th September 2018
XRN Nov 19 Release - Status Update
Release 3 Update 07th March 2018.
Retail & Networks ChMC Update
UIG Task Force Progress Report
4340 – UK Link Future Release 1.1
XRN Nov 19 Release - Status Update
UIG Task Force Progress Report
UIG Task Force Progress Report
UIG Task Force Progress Report
DSC ChMC Switching Programme Update 10th July 2019
XRN Nov 19 Release - Status Update
UK Link Timeline June-19 Sept-19 (EUC) Nov-19
DSG Governance Group Recommendations.
UIG Task Force Progress Report
XRN4914 MOD Retrospective Data Update Provision
UK Link Change Impacts and Release Update
XRN 4954 – MiR Drop 5 - Status Update
XRN 4927 – MiR Drop 4 - Status Update
XRN Nov 19 Release - Status Update
UIG Task Force Progress Report
DSC ChMC Switching Programme Update 11th September 2019
DSC ChMC Switching Programme Update 10th July 2019
DSC CoMC Switching Programme Update September 2019
UIG Task Force Progress Report
UIG Task Force Progress Report
DSC CoMC Switching Programme Update 17th July 2019
DSC ChMC Switching Programme Update 9th October 2019
UIG Task Force Progress Report
SwitchStream: Product update
UIG Task Force Progress Report
Presentation transcript:

DSC ChMC CSS update 6th July 2018

Ofgem Switching Programme – Key Updates At June CoMC committee, Xoserve requested: Approval for CSS Consequential and Bid budgets within BP18 Approval to submit a non-binding response to DCC’s CSS Bid pre-qualification questionnaire Both of these requests were approved. Xoserve received the Prequalification Questionnaire from DCC on 29/06/18. Response to the Questionnaire is required for 13/07/18. Level 2 analysis for CSS Consequential continues. This analysis requires the extraction and assessment of high level requirements in order to drive solution options. The analysis will be ongoing until the end of September at which point we will begin our level 3 analysis and commence Industry discussions for potential solution options. These discussions will be taken through DSG.

Ofgem Switching Programme – Key Updates Ofgem released a consultation on the 5th June for Proposed Modifications to Regulation and Governance for the new switching arrangements. Proposals include a new dual fuel Retail Energy Code and new licence obligations. Xoserve are currently reviewing the proposals and will share our response at CoMC on the 23rd July. The Modification 630R review group scheduled for the 29th June was cancelled. The Workgroup report is now being prepared via e-mail and submitted to Panel. Topics covered and suggested solutions will be considered as part of the level 2 CSS Consequential analysis. This pack also includes for your continued information the updates provided at the June meeting on forthcoming ChMC and CoMC considerations and associated governance.

CSS Consequential (CSSC) Ofgem Timeline CSS Consequential (CSSC) CSS Bid (CSSB) Part A: Bid Support as existing central service provider Solution Specific Design Baselined Pre-Qual. Tender Process Contract Agnostic Design Baselined Contract Award – Feb 19 Build & Test Potential Go Live Range Indicative Ofgem Timelines Part C1: Initial analysis, commence data cleanse and HLD of CSSC Customer & Stakeholder Engagement Part C2: Commencing development work on ‘no regrets’ CSSC Part C3: Full delivery of CSSC Part C4: Operate Costs Identify ‘Regrets / No Regrets’ Work L1 IA Level 2 IA CP1 Level 3 IA CP2 Solution Agnostic – Delivery (Design, Build & Test) MT Imp. PIS Industry Delays? Level 1 Impact Analysis Pre-Level 3 Check Point Pre-Delivery Checkpoint Solution Specific Design and Delivery ‘No regrets’ delivery plan & costs understood Data Cleanse Demo Part B1: Initial analysis and Bid development for CSSB Bid Analysis L2 Solution Options L3 Solution Options Part B2: Full delivery of CSSB Part B3: Operate Costs Level 2 Impacts Level 3 Impacts Final bid prep Contract Delivery – Design, Build, Test MT Imp. PIS Industry Delays? Pre-Qualify Bid Submission Key: Indicative Timelines Draft Timelines Planned Timelines

DSC governance Over the coming months, there will be a number of areas that need to be shared with and approval sought from DSC committees; the following diagram describes the areas, assumed approval bodies, and indicative time scales Jun 2018 CoMC Request to modify BP18 submission for parts ‘A’, ‘C1’ and ‘B1’ Oct 2018 CoMC Request to modify BP18 submission for ‘C2’ Jun 18–Mar 19 CoMC Standard BP19 process to approve parts ‘C3’, ‘C4’, B2’ and ‘B3’ Nov 2019 ChMC Request BER approval for ‘C2’ Mar-Apr 2019 ChMC Request BER approval for ‘C3’ Jun 2018 CoMC Request approval to respond to PQQ Aug-Oct 2018 CoMC Request approval to Bid Feb-Apr 2019 CoMC Request approval to Contract Change Delivery decisions (e.g. Change packs, portfolio congestion) ChMC