March, 2010 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Integration lengths for extended-range PHY.

Slides:



Advertisements
Similar presentations
Doc.: IEEE f Submission March, 2010 Andy Ward, UbisenseSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Advertisements

Doc.: IEEE f Submission February, 2010 Andy Ward, UbisenseSlide 1 Project: IEEE P Working Group for Wireless Personal Area.
doc.: IEEE <doc#>
Submission Title: [Add name of submission]
<month year> <doc.: IEEE doc> May 2015
Name - WirelessHD doc.: IEEE g July 2010
doc.: IEEE <doc#>
June 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposed Scenarios for Usage Model Document.
August 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [ w w Fraunhofer IIS proposal.
May, 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Long-range mode preamble design for f.
May, 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Information relating to default channel frequency.
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Add name of submission] Date Submitted:
doc.: IEEE <doc#>
May, 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Integration lengths for extended-range PHY.
July 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [FCC-UWB-certifications-below-1-GHz] Date Submitted:
doc.: IEEE <doc#>
<month year> doc.: IEEE < e>
<month year> doc.: IEEE /244r0 May 2001
Project: IEEE Wireless Personal Area Networks (WPANs)
March 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Toumaz response to TG6 Call for Applications]
doc.: IEEE <doc#>
<May,2009> doc.: IEEE <doc .....> <July 2009>
doc.: IEEE <doc#>
March, 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Integration lengths for long-range PHY Date.
March, 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Integration lengths for extended-range PHY.
doc.: IEEE <doc#>
doc.: IEEE <doc#>
<month year> doc.: IEEE <xyz> January 2001
Date Submitted: [17-Nov-2005] Source: [Laurent Ouvry]
Date Submitted: [26-Oct-2005]
May, 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Integration lengths for extended-range PHY.
doc.: IEEE <doc#>
doc.: IEEE <doc#>
<month year> <doc.: IEEE doc> March 2015
July 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c rate-range requirements: looking forward]
doc.: IEEE <doc#>
Submission Title: [WG WNG Liaison Report January08]
April, 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Information relating to default channel frequency.
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
Date Submitted: [26-Oct-2005]
<month year> <doc.: IEEE doc> March 2015
<month year> doc.: IEEE <xyz> November 2000
<month year> <doc.: IEEE doc> November 2015
doc.: IEEE <doc#>
doc.: IEEE /XXXr0 Sep 19, 2007 June 2009
Submission Title: [Frame and packet structure in ]
November 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Simplified geometry for the usage model.
<month year> <doc.: IEEE doc> May 2015
<month year>20 Jan 2006
doc.: IEEE <doc#>
May, 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Information relating to default channel frequency.
doc.: IEEE <doc#>
Submission Title: [Crystal Offsets and UWB]
September 2000 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG3 Rank Order Voting Process Description.
<month year> <doc.: IEEE doc> March 2015
March 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [DF6 Radio-burst length over PSDU size] Date.
<month year> <doc.: IEEE doc> March 2015
Submission Title: [Proposed Resolution for FSK/GFSK Prior Comments]
doc.: IEEE <doc#>
<month year> doc.: IEEE <030158r0> <March 2003>
June, 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [OFDM PHY Mode Representation] Date Submitted:
Mar 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Resolution for Comment 70 ] Date Submitted:
<author>, <company>
Mar 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Resolution for Comment 70 ] Date Submitted:
<month year> <doc.: IEEE doc> March 2015
Jan 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TeraHertz Closing Report Date Submitted: January.
12/15/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [AWGN Simulation Results] Date Submitted:
Presentation transcript:

March, 2010 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Integration lengths for extended-range PHY Date Submitted: 16th March 2010 Source: Andy Ward, Ubisense Address: St Andrew’s House, St Andrew’s Road, Chesterton, Cambridge, CB4 1DL, ENGLAND Voice: +44 1223 535170, FAX: +44 1223 535167, E-Mail: andy.ward@ubisense.net Re: TG4f Call for Preliminary Proposals and Final Proposals, IEEE P802.15-09-0419-01-004f Abstract: Integration lengths for extended-range PHY Purpose: To be considered by 802.15TG4f Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15. Andy Ward, Ubisense

Integration lengths for extended-range PHY March, 2010 Integration lengths for extended-range PHY Andy Ward Ubisense Andy Ward, Ubisense

doc.: IEEE 802.15-<doc#> <month year> doc.: IEEE 802.15-<doc#> March, 2010 Overview Discuss trade-offs involved in selecting the pulse-to-symbol ratio Show how system frequency accuracy is important Discuss ‘state-of-the-art’ in cheap crystal technology Andy Ward, Ubisense <author>, <company>

Extended-range UWB PHY March, 2010 Extended-range UWB PHY Rather than using one pulse-per-symbol mapping, we use m pulses-per-symbol Still very simple for transmitter to generate Still relatively simple for receivers as well! Use a different PRF (2MHz) so that receivers can do tone detection to figure out what type of packet is coming Integrate the pulses at the receiver to increase signal to noise For example, integration of four pulses increases SNR by 6dB (ideally) System will be average-power limited rather than peak-power limited Long pulse trains will mean that ‘average in 1ms’ trick can’t be used However, once you are average-power limited, there is no (regulatory) limit to the length of packet you can transmit at the same power Andy Ward, Ubisense

Ideal coherent integrator performance March, 2010 Ideal coherent integrator performance Andy Ward, Ubisense

System frequency accuracy March, 2010 System frequency accuracy Nominal pulse centre time The previous graph assumes perfect frequency sources throughout the system When the frequency sources differ, the pulses won’t line up perfectly in the coherent receiver So the achievable gain is less As the number of pulses-per-symbol increases, frequency accuracy gets more important You’re integrating over a longer time… …so the amount of drift between the transmitter and receiver increases… …so the pulses at the start and end of the integration period don’t line up so well Some time later…. Nominal pulse centre time Andy Ward, Ubisense

Effect of system frequency accuracy on integration gain March, 2010 Effect of system frequency accuracy on integration gain Andy Ward, Ubisense

System frequency accuracy vs centre frequency March, 2010 System frequency accuracy vs centre frequency Nominal pulse centre time There is some dependence of integration performance (with non-ideal frequency sources) on system centre frequency As CF increases, it takes less drift to make the pulses align less well in the coherent integrator So you need a higher frequency accuracy to maintain integration gain at high pulse-to-symbol numbers NB: What is shown here is a half-cycle of the CF of the UWB pulse (which will typically consist of a few complete cycles in a short-duration envelope) Some time later…. Nominal pulse centre time Extra energy for red (low frequency) signal Extra energy for blue (high frequency) signal Andy Ward, Ubisense

System frequency accuracy vs CF March, 2010 System frequency accuracy vs CF Andy Ward, Ubisense

How does integration gain vary against packet length? March, 2010 How does integration gain vary against packet length? Here, both systems are average-limited so graph flattens out Here, 1-pulse-per-symbol system is peak-limited, so graph flattens out Andy Ward, Ubisense

What is a reasonable frequency tolerance to aim for? March, 2010 What is a reasonable frequency tolerance to aim for? Remember – this is ONLY relevant to systems that want to do coherent integration. You don’t need a super crystal if you don’t care about this! Plain crystal – maybe 10ppm TCXO – maybe 0.3ppm 0.5ppm TCXOs over -40C to 85C are now readily available Used for GPS/GSM Very cheap Need to cope with other effects too: Initial frequency accuracy (tune out at manufacture) Crystal ageing (either tune out during use, or pre-age) As a data point (nothing more!), system frequency accuracy budget in current Ubisense systems is better than 2ppm Better than 1ppm would be achievable at same cost today Andy Ward, Ubisense

March, 2010 Proposal Based on available TCXOs and integration performance, we propose a 64-pulse-to-symbol mapping for the long-range UWB PHY mode Andy Ward, Ubisense