Submission Title: [Reasonable Compromise Proposal]

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0051r2 Submission January 2004 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Advertisements

Submission Title: [Add name of submission]
June 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposed Scenarios for Usage Model Document.
May 2010 doc.: IEEE /0333r0 May 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [May 2010.
Submission Title: [MC EventsList] Date Submitted: [11Jul00]
doc.: IEEE <doc#>
Submission Title: [WG-SG3b Closing Report Jan04]
Submission Title: [WG-TG3 Closing Report Nov03]
Submission Title: [WG-Treasurer’s Report July04]
November 2008 doc.: IEEE November 2008
Submission Title: [WG-TG3 Opening Report May03]
Submission Title: [WG-TG3 Closing Report Nov03]
Submission Title: [Multi-band OFDM Proposal References]
January 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Sub-GHz proposal for ] Date Submitted:
July 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [FCC-UWB-certifications-below-1-GHz] Date Submitted:
Submission Title: [WG-Treasurer’s Report Sept04]
Submission Title: [WG-Treasurer’s Report July04]
Submission Title: [WG-TG3 Closing Report Nov03]
March 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Toumaz response to TG6 Call for Applications]
Submission Title: [WG-Treasurer’s Report Sept04]
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Resolution of CID 139] Date Submitted:
Submission Title: [Compromise Proposal] Date Submitted: [12Sept2004]
Submission Title: [802.11n Liaison Report May 2009]
Submission Title: [Harmonizing-TG3a-PHY-Proposals-for-CSM]
Submission Title: [Bluetooth SIG Liaison Report Nov08]
Submission Title: [Bluetooth SIG Liaison Report]
Project: IEEE P WG for Wireless Personal Area Networks (WPANs)
January 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Sub-GHz proposal for ] Date Submitted:
November 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Text Proposal for FCC NPRM Response Date.
July 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c rate-range requirements: looking forward]
Submission Title: [Proposal to split the TG3a into two]
Submission Title: [WG WNG Liaison Report January08]
Submission Title: [Compromise Proposal] Date Submitted: [12Sept2004]
September g Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Recognition of Hiroshi.
Submission Title: [Just the facts ma’am]
Submission Title: [SG4b Closing Report Mar04]
Submission Title: [Recent Progress of Chinese WPAN Standard Group]
Sept 2004 doc.: IEEE b Sept 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
Submission Title: TGe Liaison Repor
Submission Title: [Just the facts ma’am]
Submission Title: [Proposal to split the TG3a into two]
Submission Title: [TG3a Closing Report September 2005]
Submission Title: [Uniform bandplan for TG4a Modulation]
Submission Title: [Reasonable Compromise Proposal]
<month year> November, 2004
Submission Title: [WG-Treasurer’s Report Sept04]
doc.: IEEE /XXXr0 Sep 19, 2007 June 2009
Submission Title: [WG-TG3b Closing Report May04]
Submission Title: [Frame and packet structure in ]
Submission Title: [WG-Treasurer’s Report January06]
November 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Simplified geometry for the usage model.
<month year>20 Jan 2006
doc.: IEEE <doc#>
Submission Title: [REVCOM Submission Information]
September 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Discussion on MAC functionalities Date.
November 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Text Proposal for FCC NPRM Response Date.
Submission Title: [TG3a Closing Report November 2005]
Submission Title: [Proposed Resolution for FSK/GFSK Prior Comments]
Submission Title: [WG-RR TAG Liaison Report January08]
Submission Title: [TG3a Compromise Proposal]
Submission Title: [Reaffirmation of IEEE Std ]
January 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [17.
January 2000 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Study Group Summary and Motion for .15WG.
Submission Title: [WG-Treasurer’s Report November07]
Submission Title: [WG-Treasurer’s Report Sept04]
November 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [15.
August, 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Improve the latency between GTS request.
Submission Title: TG9ma Agenda for September Meeting
Submission Title: [TG3a Compromise Direction]
Jan 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TeraHertz Closing Report Date Submitted: January.
Presentation transcript:

Project: IEEE 802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Reasonable Compromise Proposal] Date Submitted: [15November2005] Source: [John Barr] Company [Motorola] Address [1303 E. Golf Road, Schuamburg, IL 60196] Voice:[+1 847 576-8706], FAX: [+1 847 576-6758], E-Mail:[John.Barr@Motorola.com] Re: [15-05-0648-00-003a-mb-ofdm-updates.pdf, ] Abstract: [A reasonable compromise proposal for consideration by TG3a in order to allow the IEEE 802.15.3a task group to move forward with dignity.] Purpose: [Information for TG3a members to help them make a more informed decision.] Notice: This document has been prepared to assist the IEEE 802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by 802.15.

Current Situation 802.15.3a Deadlocked since July 2003 Previous approach to a compromise did not gain consensus due to lack of participation by both parties Initiated January 2004 in Vancouver Merger #1 proposal group taking their specification to ECMA to avoid deadlock Merger #2 proposal introducing products and gaining design wins internationally Recent regulatory efforts will require changes to both specifications

Spectrum Options FCC rules are not being accepted in other regulatory regions: EU 3-5 GHz only with DAA, only 6-9.25 GHz similar to FCC rules (4.2-4.8 until 2010) Japan 3.4-4.8 only with DAA, only 7.25-10.25 GHz similar to FCC rules 5-6 GHz avoided due to overlap with NII and need for DAA with radar systems

Reasonable Proposal 3.1-4.9 GHz DAA required Mandatory mode is FFI, OFDM, 4.2-4.8 at 53.3 Mbps (may allow I-only operation to reduce complexity) All other MB-OFDM and DS-UWB rates optional between devices (TDMA) 7-10.25 GHz no DAA required Mandatory mode is DS-UWB, 7-10.25 at 55 Mbps All other MB-ODFM and DS-USB rates optional between devices as long as regulatory conditions allow: Regional location detection DAA

Beacons for an OFDM Piconet Superframe Duration # 1 OFDM Beacon MB-OFDM CTA OFDM CTA DS-UWB CTA 2 OFDM Beacon MB-OFDM CTA OFDM CTA DS-UWB CTA … N OFDM Beacon DS-UWB CTA MB-OFDM CTA N+1 OFDM Beacon MB-OFDM CTA OFDM CTA MB-OFDM CTA OFDM piconet uses 4.2-4.8 FFI OFDM at 55.3 Mbps for beacons and commands TDMA nature of 802.15.3 MAC allows any optional mode to be used in designated CTAs for devices that have equivalent modes

Why this should work Both merger proposals get mandatory mode in separate spectrum All devices desiring to use OFDM would associate in low band All devices desiring to use DS-UWB would associate in high band Highly scalable implementation to satisfy broad range of applications 800 Mbps DS-OFDM option Gbps DS-UWB option 480 Mbps Certified Wireless USB option Market gets roadmap to a common standard that satisfies world wide regulatory rules Device manufacturers can chose options to meet their needs Requires updates to both proposals that will be also be required to meet regulatory approval (e.g., June 2006 EU and Japan rules)

Why we need to compromise UWB rapidly losing market momentum due to lack of industry cooperation and uncertainty due to competing solutions Need a common front to ensure reasonable completion of world wide regulations for UWB Time to move forward and stop the pain 1 Gbps WLAN coming