The Network Model Management System

Slides:



Advertisements
Similar presentations
October 2007 CIM UG Meeting Texas Nodal Program Raj Chudgar.
Advertisements

Distributed Generation (DG)
California Independent System Operator Soumen Ghosh CAISO CONFIDENTIAL Created: 06/15/2008 State Estimator for CA ISO Market - Relevance and Readiness.
North American Electricity Markets APEX Paris, France October 15-16, 2007 Kenneth Laughlin, PJM.
EAEI Department  Electricity Markets and Policy Group Congestion Measures for Organized Electricity Markets in the U.S. Emily Fisher Lawrence Berkeley.
EMS User’s Group 2008 Presented By Curtis Crews of ERCOT and Margaret Goodrich of Project Consultants, LLC Presented to EMS User’s Group Atlanta, GA September.
1Texas Nodal Texas Nodal CRR Annual Model Discussion DRAFT By John Moseley, ERCOT.
Jay Britton
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
9/14/2015 IEEE Presentation Time-Based Management of Large Scale Network Models John Moseley P.E. Lead Network Model Engineer.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Requirement Documents November 7, 2006 Sai Moorty MMS Project.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
Lead from the front Texas Nodal 1 Resource Entity Owned Transmission Asset Data Collection Feb 27, 2009 Kick Off Meeting.
Texas Nodal Program ERCOT Readiness Update TPTF March 31, 2008.
April, 2008 Maximum Shadow Price. April, 2008 Protocol Requirement: Transmission Constraint Management (2)ERCOT shall establish a maximum Shadow.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
EMS User’s Group Presented By Margaret Goodrich Project Consultants, LLC Presented to EMS User’s Group Austin, TX September.
Texas Nodal March Texas Nodal NMMS Requirements By John Adams ERCOT.
September 8, 2008 TPTF Nodal Core Projects Updates Nodal Project Managers.
Presentation to House Regulated Industries Committee Chairman Phil King Trip Doggett Chief Operating Officer The Electric Reliability Council of Texas.
TPTF CIM Health Check Raj Chudgar Program Director for Market Redesign.
PRR 547 – Trading Hubs CMWG Presentation to WMS October 21, 2004.
Lead from the front Texas Nodal 1 EDS 3 R6.2 Testing Overview Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 LFC WebEx.
EMS Users Conference 1 September 23rd – 26th CIM in the Network Model Management System Joel Koepke Network Model Engineer, ERCOT.
Lead from the front Texas Nodal 1 Texas Nodal Registration Kick-off Meeting Matt Mereness June 6 th, 2007.
Overview Art Deller, P.E. Supervisor, Model Administration New Resource Workshop May 28, 2014.
Network Model Management System (NMMS)
July 10, 2008 ROS Early Delivery Systems Status – R6.3 2 Hour Test John Dumas and Jeff Gilbertson.
American Wind Energy Association Wind in The Portfolio Mike Jacobs American Wind Energy Association Managing Your Energy Portfolio in a Greener World January.
TPTF CIM Health Check Raj Chudgar Program Director for Market Redesign.
Model load frequency Discussion John Adams January 5, 2010 Nodal Advisory Task Force.
Lead from the front Texas Nodal 1 Registration Data Update Aug 25, 2008.
CCWG April 28 th Meeting CCWG Update to COPS May 12,
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Transition Plan Network Operations Model Change Requests 5/26/2010.
CRR Network Model One-Line Diagram Beth Garza TPTF April 22, 2008.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
6/21/2007 TPTF: Baselines 1&2 WP and CI Baselines 1 and 2 White Papers and Change Items Diran Obadina.
Texas Nodal Electrical Buses and Outage Scheduling.
Nodal Planning Go Live Austin, TX February 3, 2011
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Market Trials Update NATF March 2,
NMT – Network Operations Modeling & Telemetry - Project
NMMS Nodal Network Mgmt and Monitoring System Update
Wind Management at MISO
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
Market Architectures Integrating Ancillary Services from Distributed Energy Resources Olivier Devolder Head of Energy Group N-SIDE.
John Dumas Director, Wholesale Market Operations
Director, Transmission Services
2011 Prioritization Update to Market Subcommittees
A Midsummer Night’s DREAM
Exit Capacity Release Methodology Statement
The New Texas Wholesale/Retail Market
Energy Storage Settlements Consistent with PUCT Project & NPRR461
North American Markets Status
Texas Nodal Load Frequency Control (LFC) EDS 3 R6
ECEN 460 Power System Operation and Control
Deploying CIM to Bridge the Modeling Gap Between Operations and Planning Mike usa.siemens.com/digitalgrid unrestricted © Siemens AG 2017.
9/22/2018.
Strategies of Reliable Transmission of Energy In A Competitive Market
DATABASE SYSTEM UNIT I.
Evolution of the ISO Power Markets
California ISO’s CIM Based Model Management
Sandip Sharma ERCOT Manager, Operations Planning
The Global Forum Electricity Ancillary Services and Balancing | Berlin, SmartNet Pilots: The demonstration of the different TSO-DSO coordination.
Energy Storage Roadmap & Flexibility Roadmap Information Session
Time-Based Management of Large Scale Network Models
Presentation transcript:

The Network Model Management System By Joel Koepke ERCOT, Network Model Engineer EMS Users Conference 1 September 23rd – 26th

Submission of Model Updates ERCOT as the Registration Authority AGENDA About ERCOT NMMS Overview ERCOT CIM Submission of Model Updates ERCOT as the Registration Authority EMS Users Conference 2 September 23rd – 26th

About ERCOT Grid covers 75% of Texas’ land and serves 85% of Texas’ load 38,000 miles of +60kV transmission lines 750 miles of 345kV lines added since 1999 70,000 MW of total resources 26,000MW of generation added since 1998 63,056 MW peak load (8/17/2006) 5400 Bus Model ERCOT EMS Users Conference 3 September 23rd – 26th

Market Redesign – Going Nodal! Zonal Market Insufficient price transparency Resources grouped by portfolio Indirect assignment of local congestion 5 CMZ Zones Nodal Market Improved price signals Improved dispatch efficiencies Direct assignment of local congestion 4000 Nodes EMS Users Conference 4 September 23rd – 26th

The Network Model Management System

The Network Model Management System NMMS The Network Model Management System What is it? The system that will perform all modeling functions in the Nodal market. Submission of modeling changes Storage and validation of the model data (Operations and Planning) Creation of all required models for downstream applications Why? The Nodal Protocols contain requirements which significantly change ERCOT’s current modeling process Need “Future” models Modeling should be consistent (Operations vs. Planning) Must accept CIM inputs and produce CIM outputs EMS Users Conference 6 September 23rd – 26th

NMMS - Overview EMS Users Conference 7 September 23rd – 26th

Time-Based Modeling NMMS - Key Features Incremental Changes – All model updates are stored as a packet of database modification commands Effective Date – Each incremental change is given an energization date Future Models – Applying dated incremental changes to a base model creates a model representing a future date EMS Users Conference 8 September 23rd – 26th

Time Based Modeling Example – Part 1 A time based model as it appears on February 15th. Wanted: A set of models that represent April 1st through April 30th. EMS Users Conference 9 September 23rd – 26th

Time Based Modeling Example – Part 2 First, build a base model representing April 1st. Second, gather all incremental changes during the desired date range. EMS Users Conference 10 September 23rd – 26th

Time Based Modeling Example – Part 3 EMS Users Conference 11 September 23rd – 26th

Future Model Creation NMMS Creating an Operations Model The model is created by applying all the incremental changes that occur between the current and future dates to the base model Creating a Planning Model An Operational model is created for the future date This model is passed through a “topology processor” to change the breaker/switch model into a bus/branch Planning model Planning incremental changes are then applied to the model to make it reflect the future date Consistent Data – Converting an Operational model guarantees consistency EMS Users Conference 12 September 23rd – 26th

Common Information Model (CIM) NMMS Common Information Model (CIM) What is it? An information model that describes real-world objects and their interrelations within the electric power industry A format for exchanging information Why is it important? Provides a standard way of depicting data Enables the integration of multiple applications and vendors Facilitates bulk and incremental model exchange EMS Users Conference 13 September 23rd – 26th

NMMS – Detailed Overview EMS Users Conference 14 September 23rd – 26th

Questions? EMS Users Conference 15 September 23rd – 26th