ITP20 Flowgate Selection Introduction

Slides:



Advertisements
Similar presentations
1 Market Flow Threshold Field Test NERC ORS Meeting November 14 th and 15 th.
Advertisements

Parallel Flow Visualization Data Requirements Parallel Flow Visualization Data Requirements NERC ORS Meeting Toronto, Ontario September 23-24, 2009 Jim.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
Regional Planning Group Project
Northwest Quadrant Joint Security Study Southern Company Headquarters Birmingham, Alabama August 12, 2002 Presented by Saeed Arabi.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
Cleco Transmission Planning Summit 2011 Coughlin Transmission Operations Center April 15, :00 – 11:00am.
Congestion Management in a Market Environment 2 nd CIGRE / IEEE PES International Symposium San Antonio, Texas October 5, 2005 Kenneth W. Laughlin.
Real-Time Transmission Congestion Management & Market Effects
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2014 New York Independent System Operator, Inc. All Rights Reserved. Emergency Transfer Criteria NYSRC Reliability.
SPP.org 1. 2 Aggregate Transmission Service Study (ATSS)
George Bartlett Director, Transmission Operations Economic Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
Peak RCCo Performance Metrics Draft –November 2013.
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,
ISO Comparison – CAISO Alex Lee (ERCOT)
MIG TF Voting Items Market Participant Notification Period (Transmission outage) – =1 Year Interconnection Date for Protocol Considerations – First Interconnection.
CRR Model Building Process Bradley Bell CRR Engineer.
© Property of ERCOT /17/20041 RTCA, CAM, and SFT Presented by: John Adams November 17, 2004.
© ABB Group August 23,2010 | Slide 1 MBPC Study – 1 st Load Pocket Preliminary Results for Discussion only Entergy Regional State Committee (ERSC) Southwest.
2006 SPP RTO Expansion Plan Carl A. Monroe July 30, 2006.
Long-Term Solution for Negative Generation Entergy Transmission AFC Stakeholder Meeting August 22, 2006.
Project Tracking Update July 12, 2011 MOPC. 2 STEP List (Excel Spreadsheet) –Engineers enter technical data and analysis on upgrades –Used as a repository.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
Business Practices Subcommittee Update Executive Committee Meeting April 29, 2014.
1. Non-Dispatchable Resources and EIS Market Carrie Simpson May 30,
1 State Estimator performance. 2 State of Technology Many metrics have been proposed for measuring State Estimator performance.. PI = min Σ( Z – h i (x))^
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
LCRA TSC/ CPS Energy Transmission System Addition Regional Planning Group Project Jeff Billo Sr. Manager, Transmission Planning TAC ERCOT Public March.
ESI Alternate Economic Study Process E-RSC Meeting October 21, 2010.
The Product Flow Efficiency Project By Martyn Bates Monitor Coatings limited.
Business Practices Subcommittee Update Executive Committee Meeting August 18, 2015.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
Discussion on FGR Settlement Protocol Language David Maggio CMWG February 17, 2014.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Reliability Unit Commitment Discussion with QMWG
Camera PDR/CD1 Planning 19 September 2008
Freeport Area Master Plan Project -
What is the Best Way to Select an EHR
Transmission Planning in ERCOT- Overview
Barrilla Junction Area Transmission Improvements Project
NPRR833 Workshop: Contingency Processing in CRR, DAM and SCED
COM Operating Personnel Communications Protocols
TPITF March 6, 2017 Juliano Freitas
Market Flow Threshold Field Test
Business Practices Subcommittee Update
ISO New England System R&D Needs
Project WECC-0100 Update Load Modeling Task Force
Fundamentals of a Business Impact Analysis
T.O. Highway/Byway Recommendations
Market Flow Threshold Field Test
Recommended Draft Policy ARIN : Eliminate HD-Ratio from NRPM
Group Meeting Ming Hong Tsai Date :
Reliability Assurance Initiative (RAI) 101
Project WECC-0100 Update Reliability Subcommittee
ECEN 615 Methods of Electric Power Systems Analysis
Project WECC-0100 Update Load Modeling Task Force
Planning Meeting November 4, 2010 Marv Landauer.
Two-Tier Firm Curtailment Overview
Strategic Plan and Economic Upgrade Process
Presentation transcript:

ITP20 Flowgate Selection Introduction Timothy Miller July 21st, 2010 TWG Teleconference

Flowgate Simulation Impact In the economic simulations flowgates are the only flow control mechanism Line limits are not heeded by default Penalties associated with an overload provide control Manage the economic dispatch Key to a reasonable economic solution Background warm-up information – why it’s important Flowgate list will be longer than that of the NERC IDC 270 monitored by Operations 500 needed by ITP processes Not related to the annual review – not even close Don’t dwell on economics

Selecting Reasonable Flowgates Staff is developing flowgates based upon the ITP 20 Year Assessment Scope document Preferred outcomes Spreadsheet listing the flowgates Charts summarizing the simulated data Maps showing congestion The reason we are here today

Flowgate Selection Criteria

Flowgate Selection Criteria Starting Point NERC Book of Flowgates Additional criteria 345 kV Contingencies 115+ kV Monitored Elements Evaluate 8,760 hours From the ITP scope: The initial flowgate list will be the then-current NERC Book of Flowgates (BoF) Flowgate studies will be run over 8760 hours (1 year) Flowgate studies will be performed on each future case For the flowgate analysis, contingencies 345 kV and up in SPP, including autotransformers stepping down from 345 kV and up, will be selected For the flowgate analysis, monitored elements 115 kV and up in SPP will be selected A minimum of one iteration will be performed in the flowgate study Unless other information is available, the flowgate ratings will be selected based upon the Rate A (normal rating) and Rate B (emergency rating) in the powerflow model. This analysis will focus on a 2030 economic model

Flowgate Selection Criteria Additional criteria SPP devices and tie-lines 60 hour threshold Rate A & Rate B unchanged Three iterations From the ITP scope: The initial flowgate list will be the then-current NERC Book of Flowgates (BoF) Flowgate studies will be run over 8760 hours (1 year) Flowgate studies will be performed on each future case For the flowgate analysis, contingencies 345 kV and up in SPP, including autotransformers stepping down from 345 kV and up, will be selected For the flowgate analysis, monitored elements 115 kV and up in SPP will be selected A minimum of one iteration will be performed in the flowgate study Unless other information is available, the flowgate ratings will be selected based upon the Rate A (normal rating) and Rate B (emergency rating) in the powerflow model. This analysis will focus on a 2030 economic model

Unique Operational Flowgates

Unique Operational Flowgates SPP-SPS interfaces Staff recommends redefining flowgate as individual OTDF flowgates due to extensive upgrades in place by 2030.

Unique Operational Flowgates GGS Stability Interface Staff recommends continued use of this interface

Example Flowgate Simulation Data

Flowgate Example Results Violations avoided by flowgate definition Before & After By Area By month

Effect of Adding Flowgates Not Normalized for the number of lines in each area

Flowgate Example Results Flowgate congestion Limit is respected Prices change Violations should be minimized by adding flowgates

Congestion by Shadow Price Impact Data to be provided by SPP

Next Steps Staff to provide TWG draft results: Top 10 congested flowgate summary Exhaustive flowgate spreadsheet Hours Congested & Avg. Shadow Price Results of contingency scans Requesting TWG endorsement of flowgates in August teleconference

Timothy Miller Planning Engineer 501-614-3357 tmiller@spp.org