Accelerator R&D Results from the B-factory

Slides:



Advertisements
Similar presentations
S. N. HOM Impedance in Vacuum … 1 of 40 Sasha Novokhatski SLAC, Stanford University Machine-Detector Interface Joint Session April 22, 2005 HOM Impedance.
Advertisements

Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
Ion instability at SuperKEKB H. Fukuma (KEK) and L. F. Wang (SLAC) ECLOUD07, 12th Apr. 2007, Daegu, Korea 1. Introduction 2. Ion trapping 3. Fast ion instability.
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
Super-B Factory Workshop April 20-23, 2005 Super-B IR design M. Sullivan 1 Status on an IR Design for a Super-B Factory M. Sullivan for the Super-B Factory.
Accelerator Plans at KEK
SLAC Accelerator Department Super-B-Factory John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department Caltech Meeting.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
1 IR Vacuum M. Sullivan MAC Review Jan , 2006 M. Sullivan for the Machine Advisory Committee Review January 18-20, 2006 IR Vacuum.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
01/07/2005 SN 1 of 16 Esti mation of HOM Power in the Interaction Region of ILC Sasha Novokhatski Session “Beam RF Effects” ILC MDI Workshop SLAC January.
PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 1 PEP-II Overview and MMS Status Michael Sullivan SLAC National Accelerator Laboratory.
Issues for Optimization of a Super-B Factory John T. Seeman SBF Workshop SLAC June 14, 2006.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
SLAC Accelerator Department The PEP-II Accelerator Status and General Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator.
Vacuum Pressures at IR Contents Y.Suetsugu KEKB Vac. Group 1.Outline of Vacuum System at IR 2.Behavior of Pressures 3.Remedies for Heating of Vacuum Components.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
PEP-II Machine Advisory Committee Meeting SLAC, April 15-17, 2004 HOM Issues in LER Ring and IR. Recent measurements and calculations. Sasha Novokhatski.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II in Run 7 and Transition Planning John T. Seeman Assistant Director PPA/LCLS.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
ERHIC design status V.Ptitsyn for the eRHIC design team.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Interaction Region Backgrounds M. Sullivan for the MEIC Collaboration Meeting Oct. 5-7, 2015.
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
Beam Dynamics and Instabilities in MEIC Collider Rings Byung C Yunn Jefferson Lab Newport News, Virginia, USA.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
November 16-18, 2004 Belle High Luminosity Workshop 1 M. Sullivan High Luminosity workshop (HL6) November 16-18, 2004 IR Vacuum Summary and Issues.
Synchrotron Radiation Absorption and Vacuum Issues in the IR at PEP-II and a Higgs Factory John Seeman, SLAC October 11, 2014 HF2014 Beijing.
Mini MAC II PEP-II hardware M. Sullivan Apr 23-24, 2009Page 1 PEP-II Hardware Status M. Sullivan SLAC National Accelerator Laboratory Mini-MAC II Frascati,
PEP- II Linac Accelerator Systems Department Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April.
Coherent wave excitation in a high current storage ring.
PEP-II Status John Seeman SLAC Particle and Particle-Astrophysics
JLEIC MDI Update Michael Sullivan Apr 4, 2017.
M. Sullivan International Review Committee November 12-13, 2007
The Interaction Region
Accelerator R&D for the Super-B Factory
SuperB Injection, RF stations, Vibration and Operations
Linac possibilities for a Super-B
CEPC Vacuum System Dong Haiyi 2017/11/5.
Utilization of KEKB for ILC R&D
The PEP-II Interaction e+e- Factories Workshop
Top-Up Injection for PEP-II and Applications to a Higgs Factory
Study on Beam Instability
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Overview of SRF system of Ring and Linac (1)
PEP-II Status and Plans e+e- Factories Workshop
Other issues and concepts under study Conclusions References
EPAC2002 European Particle Accelerator Conference
Interaction Region Design Options e+e- Factories Workshop
CLIC damping rings working plan towards the CDR
J. Seeman Assistant Director for PPA/LCLS
AC Power for a Super-B Factory
Summary of Washington DOE Review
Super-B Accelerator Overview
Coherent Synchrotron Radiation Study
Super-B Factory in a “4400m” Tunnel
M. E. Biagini, LNF-INFN SuperB IRC Meeting Frascati, Nov , 2007
Proposal for a CESR Damping Ring Test Facility
MEIC New Baseline: Luminosity Performance and Upgrade Path
HE-JLEIC: Boosting Luminosity at High Energy
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Some of the Points Raised During my JLAB Visit
IR/MDI requirements for the EIC
MEIC Alternative Design Part V
Presentation transcript:

Accelerator R&D Results from the B-factory M. Sullivan PEP-II run coordinator 1

Outline PEP-II Parameters High-current running IR design Summary Vacuum designs RF systems Bunch by bunch feedbacks High-current running Synchrotron radiation power HOM power IR design SuperB IR design Summary 2

PEP-II Rings BaBar Detector 3

PEP-II tunnel 4

PEP-II parameters Circumference (m) 2200 RF frequency (MHz) 456 Number of RF buckets 3492 Number of bunches 1730 Bunch spacing (m) 1.26 LER HER Beam current (A) 2.9 (2.99) 1.85 (1.9) Particles per bunch 81010 51010 Beam energy (GeV) 3.1 9 Collision beam sizes (m) 100x5 Collision Head-on Luminosity (cm-2 sec-1) 1.21034 Highest beam currents and more positrons than anyone else 5

Vacuum Systems HER LER Base pressures are less than a nTorr Long (5.4 m) PEP-I dipoles led to distributed ion pumps (DIPS) Copper system LER Short (0.45 m) dipoles to decrease the damping time led to ante-chambers with photon stops and massive titanium sublimation pumps (TSPs) Aluminum system (TiN) Base pressures are less than a nTorr Dynamic pressures are a few nTorr More Amp-hours than any other accelerator Over 50,000 Amp-hrs for the LER Over 30,000 Amp-hrs for the HER 6

RF System and Feedbacks RF systems Minimal stored energy Power efficient Beam loading is high State of the art low-level feedback system to control klystron power and phase Fast feedback systems to control multi-bunch instabilities in the transverse and longitudinal dimensions Longitudinal system has been installed in several other storage rings 7

High Beam Currents Synchrotron Radiation power HOM power Ion gap 6.4 MW for the HER at 1.8 A 2.3 MW for the LER at 3 A HOM power Absorbing elements Pump screens Bellows screens Ion gap Gap is now 1% -- ions have only seen when the vacuum is high Electron cloud Successfully controlled by solenoid windings 8

HOM power damage RF seal between two flanges in the HER 9

Absorber designs S. Weathersby A. Novokhatski 10

Design for a HOM Absorber Module 11

Bellows Design with Exposed Tiles 12

New Absorber Design Absorber tiles are now behind the bellows fingers and the spacing between the fingers is quite large to allow high frequency RF to pass through 13

IR Design Uses permanent magnets for accelerator components inside the detector magnetic field Require no power Are always on – reduces the probability that an uncontrolled beam will crash into the detector Maintenance free Self-shielding 14

PEP-II Interaction Region BaBar Detector 15

IR Layout 16

Super B Factory Worked on an interaction region design for a Super B Factory The design incorporates super-conducting elements as well as permanent magnet elements for the final focus optics Similar beam currents and storage ring sizes as PEP-II Ring optics, HOM issues, beam stability… Trickle injection – pioneered at PEP-II and KEKB is a crucial ingredient for any future high-current collider About one FTE at SLAC works on the SuperB to support the world wide effort . Not directed to any one particular site yet… 17

Super B Interaction Region 18

SuperB IR Closeup 19

Summary PEP-II is a working accelerator with high-current rings Many of the issues for the ILC damping rings have been or can be studied at PEP-II Over 100 accelerator papers have been written about PEP-II with regard to the high-current performance As we increase beam currents, PEP-II will move further into the frontier of high-current storage rings 20