Cryogenics – The Basics

Slides:



Advertisements
Similar presentations
Coach Air Conditioning
Advertisements

Sat 17/9 – Sun 18/9 07:00 Cryo problem in point 4 From E. Blanco: First beam dump caused by a cryo PLC not reachable anymore (UX45_QUI) and then 14 minutes.
Refrigeration Flow Control
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
Imago LEAP Recovery Procedure for Cryo-Compressor and Cold Finger The LEAP is equipped with a Uninterrupted Power Supply (UPS). Located in the 19 inch.
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Detector DAQ Hardware Status o Introduction o Preliminary list o Plan for action o Summary Jean-Sebastien.
CRYOGENICS AND POWERING
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
LARP LQX and MQX Magnets Cryogenic Testing at Fermilab’s Industrial Building 1 Roger Rabehl Technical Division/Test & Instrumentation Department.
April, 2009 ERL SRF CRYO MODULES AND CRYOGENIC SYSTEM.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Roberto Than CRYOGENICS SYSTEM.
Superconducting IR Magnets CHEN, Fusan May 11, 2007.
Air Conditioning Charging.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
Service Section Technical Training December 2005.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
AT-ACR B. VULLIERMECSOC Meeting 29 September Cryogenics for LHC Test Benches Safety Aspects Overview of the Test Station Overview of the Operation.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
GTK GAS COOLING SYSTEM Marco Statera, Vittore Carassiti, Ferruccio Petrucci, Luca Landi, Stefano Chiozzi, Manuel Bolognesi NA62 - GTK working group meeting.
NML Cryogenic System Arkadiy Klebaner Cryomodule One Commissioning June 3, 2011.
2015 Operations Stay Treat CHL2 4K Cold Box Modifications SC1 2K Cold Box CC4 Failure Helium and LN2 Losses Contamination Operations Stay Treat.
Max-Planck-Institut für Plasmaphysik 1 ICEC 26- ICMC 2016 March 7-11, 2016, New Delhi, India Michael Nagel Cryogenic commissioning, cool down and first.
ESS | Helium Distribution | | Torsten Koettig Linac – Helium distribution 1.
James McIntyre VRF Training Manager V5 Key Components.
S A Griffiths CM42 June 2015 Electrical & Control.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire CO 2 IBL plant failures 16/06/ /06/2016 O.Crespo-Lopez.
SIS 100 Vacuum chamber Recooler String system Components
LCLS-II Technical Requirements
ILC Cryogenics: Study of Emergency Action and Recovery - in progress -
R1 Fundamentals of Refrigeration
- Condensate pump and feed pump trip!
Cryogenic behavior of the cryogenic system
Operation of CSC DCS Ryan Carroll Carnegie Mellon 29-Sept-2009.
Cesar Luongo Thomas Jefferson National Accelerator Facility
Marco Statera NA62 - GTK working group meeting
Online Helium Inventory Monitoring of JLab Cryogenic Systems
N. Hasan1, P. Knudsen2 and V. Ganni2
Small Coolers for MICE MICE Collaboration Meeting RAL Michael A. Green
Refrigeration Basics By: Mohamed Iqbal Pallipurath.
Status of the cryogenic system for B180
DOE/SC Status Review of 12 GeV SHMS HB Magnet: Update since Oct 2015
Student CD for Commercial Refrigeration for A/C Technicians Chapter 12 Ice Machines.
SC1R Cold Box PDR Controls
Mathew C. Wright October 2016
SHMS Cryogenics and Q2(Q3Dipole) Cool Down
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
Mathew C. Wright January 26, 2009
R1 Fundamentals of Refrigeration
- Condensate pump and feed pump trip!
ESR 2 Presented to Joint Hall A/C Summer Meeting
By: JAGDEEP SANGWAN Refrigeration Basics 101.
Cryogenics – The Basics
Charge 2. Equipment Protection 3. Definition and Documentation
SNS Cryoplant Commissioning Past Experiences
Cryogenic behavior of the magnet
Hall C SHMS & Configuration Status
ESR2 Process Cycle Design
Cryogenics – The Basics
Cryogenic management of the LHC Run 2 dynamic heat loads
ESR2 Process Cycle Design
Presentation transcript:

Cryogenics – The Basics Lesson 4 Torus 4K Operation and Recovery D. Kashy

Lesson 4 - Topics Supply from ESR Main Compressors Cold Box Valve Box Hall B Distribution can for Helium Supply Torus flow paths and controls 4K Supercritical Gas Liquid Helium and Cold return Lead flow Back pressure control Return gas to ESR Off normal operation ESR shutdown Quench or Fast Dump of Torus What to look for if called in and what to do next Questions

Special NOTES The slides in this presentation are a snapshot in time. They give general principles of operation. The PID control loop settings may not be up to date so the operators must use the relevant spread sheets to verify recent and most proper settings. M:\hallb_eng\CLAS12\Magnets\Operations\Cryogenic Operations

ESR Compressors High Pressure Flow rate (g/s) The rest of the flow returns at the medium pressure Low Pressure Flow rate (g/s)

ESR Cold Box The rest of the flow returns at the medium pressure Super Critical Helium Flow to Valve Box Low Pressure Flow 4.5K return from Valve Box

ESR Valve Box (part 2) and 10,000 liter Dewar Helium Dewar With HX to cool the 4.5K supply CTD672 Warm return temperature from All 3 Halls (Important upon CD or Recovery) Small Polishing HX in the VB

ESR Valve Box (part 1) Nitrogen Sub-cooler to send 4atm liquid at 77K (subcooled liquid) 4K supply flow meter (note sometimes reads about double actual flow, normal is ~6-7g/s) 4K Return Line with Cold Return Valve CEV6721B (must be shut upon long ESR outages to facilitate Hall B magnet recovery

Hall B Torus Operation

Hall B Distribution Box (DBX) Blue line is 4K supply, it feeds Torus, Solenoid and Buffer Dewar No Control PID’s are presently being used on 4K supply in the DBX. All valves are in Manual mode

Hall B Torus Main Control Screen DBX/ESR items Supply flow valves Coils and Recoolers Down Stream Hex Beam Temps Liquid Level Probes (DP and SC) Lead flow controllers Cool down Parameters

Supply Controls – EV8115JT Min is 40% to assure flow through Coils Max is 65% to keep from dropping the pressure below supercritical as shown on PT8115

Supply Controls – EV8111CD

Return Controls The cold return valve (PV8522TR) is used to back pressure the helium reservoir to drive the lead flow The higher the pressure the warmer the coils

PLC Cryogenic Controls There are several PLC based controls that are programed and not user changeable Vapor Cooled Lead Flow Vapor Cooled Lead Flow Venting Reservoir Liquid Heater

PLC Control – Lead flow The lead flow rate in standard liters per minute is shown on the main screen. The amount is programed to be 88slm at 0 Amps and 110slm (0.3g/s) each lead at full field, this flow returns to warm compressors (recovery or ESR 1st stage)

PLC Control – Lead flow In the event that the lead flow stops due to high return pressure (PT8571 about the same as PT8120) then the PLC opens SV8122 and starts the magnet rampdown. This happens only if the magnet is powered! And it shuts after the magnet reaches 0 current.

Heater 8120 interlock This heater can not be turned on if the helium level is less than 20% on LL8120SC

Other controls Lead heaters There are two different sets of VCL heaters The ones displayed on the Torus Helium Screen are PLC controlled The second set is local controllers that have manual inputs and are on the vacuum rack on level 3

Additional screens/info for Torus Overview Coil Temperatures Relief Valve Temperatures Cool Down Parameters Interlocks

Coil Temps These buttons give details on each coil temperature. Most of these are on the Copper cooling sheets that surround the coil. One is on the coil case itself

Relief Valve Temps Relief Valve temperatures on all 4K circuit relief valves help to show if there is a relief valve that has not re-sealed and is leaking

Cool down Parameters This screen shows lots of parameters that are calculated and are used to assure safe cool down

Cool down Interlocks This screen shows interlocks for warm gas supply valves and heaters

Recovery after Cryo glitches or Fast Dumps We have set up the system to try to recover both the Torus and Solenoid as quickly as possible with goals of: Minimum intervention Often no intervention for short ESR outs Often no intervention for Solenoid Fast Dumps System protection Priority to Lead reservoirs so that magnets can stay on cold return If magnets need to go to warm return the conversion back to cold return can be managed by the cryogenics group in most cases reducing the likelihood of an ESR trip

Supply During Recovery Because both the EV8115JT and EV8111CD valves are programed to control Helium level LL8120SC they will both open to their Max allowed position to attempt to cool and refill the magnet. As long as the magnet is below 100K there is no limit to cooldown rate If the magnet is above 100K then an expert must be involved

Return During Recovery (empty reservoir and warmed coils >~7K) If the ESR goes down and both magnets warm up and all reservoirs empty then ESR must shut the cold return valve CEV6721B This will cause our magnet pressures to rise until our warm return valves PV8522TCD and SCD open because of their PID control loops Once the Torus reservoir and Solenoid Lead reservoir have >50% helium level cryo can slowly open their cold return valve our PID loops will automatically close our TCD and SCD valves If the Torus is the only load to warm up then the TCD valve may be opened and the TR valve closed, to allow solenoid and buffer dewar to remain on cold return. (This should be done by an expert operator)

What to look for if (when) called in Most likely the helium level (LL8120SC/DP for the Torus) will be low or empty The question is: Why? Look at the helium supply pressure and temperature in the DBX Look at the supply flow from the ESR Check our valves to see their status Check vacuum in the DBX and Torus Go to Hall B and walk around look for ice or sweat on U-tubes Contact Cryo to see status of ESR

Distribution Box - Normal TD8512 < 7K PT8512 > 2.7 atm If these are off there may be an ESR issue OR We could have warm gas returning from a magnet or the Buffer Dewar Check our systems further then contact Cyro ALSO TC8500DC < 5.0E-2 torr PT8563 < 2.0 atm Call Hall B cryo expert and or Hall B Vacuum expert

Torus Helium- Normal TD8111 < 6K PT8111 > 2.6 atm CFI6711B > 5g/s If these are off there may be an ESR issue OR We could have warm gas returning from a magnet or the Buffer Dewar ALSO PT8120 < 1.6 atm Contact Cryo to see if they are having an issue and look more into our system then contact Hall B cyro expert

Torus Vacuum- Normal Both Turbo pumps at ~100% Both Main and Secondary gate valves open Roots gate valve closed TC8103<9E-4 CG8103<9E-5 ESR down should NOT be lit (may need to be removed from this screen…) IF these conditions are not met call in both Torus and Vacuum Experts

Questions?