Managing Service Projects

Slides:



Advertisements
Similar presentations
Chapter 7 Project Management
Advertisements

Managing Service Projects. Learning Objectives zDescribe the nature of project management. zIllustrate the use of a Gantt chart. zConstruct a project.
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
2 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Project Management 2.
1 Project Planning BA Project Planning and Control Definition of Project Management Work Breakdown Structure Critical Path Scheduling Ideal Completion.
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
ISM 270 Service Engineering and Management Lecture 6: Forecasting.
The Nature of Project Management zCharacteristics of Projects: purpose, life cycle, interdependencies, uniqueness, and conflict. zProject Management Process:
Managing Projects. Project Management Questions zWhat activities are required to complete a project and in what sequence? zWhen should each activity be.
CHAPTER 4 MANAGING PROJECT PROCESSES. THE CONCEPT A project is an interrelated set of activities that has a definite starting and ending point and that.
Project Management (2) Chapter 16, Part 2. EJR 2006 Review of Project Management, Part 1 What is a project? Examples of projects Project performance expectations.
Managing Projects Chapter 10. What is a Project? A project has a unique purpose A project is temporary A project requires resources A project should have.
Operations and Supply Chain Management, 8th Edition
Project Management. Maintenance and Reliability 14 Aug 2001.
1 Ch. 15 Managing Service Projects. 2 常見的專案問題 1. 畢專:開學前完成計畫書( Gantt 圖) 2. 畢旅,或系學會規劃運管營及交通盃 3. 借鏡:訪談本系主辦運輸年會之經驗,老 師提國科會計畫案 4. 包括哪些 activity ? Critical.
1 Material Management Class Note # 5-A ( in review ) Project Scheduling & Management Prof. Yuan-Shyi Peter Chiu Feb
Chapter 16 – Project Management
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
ISM 270 Service Engineering and Management Lecture 5: Facility Location, Project Management.
Project Management © Wiley 2007.
Operations Management Contemporary Concepts and Cases Chapter Fourteen Project Planning and Scheduling Copyright © 2011 by The McGraw-Hill Companies,
Dr. Godfried Williams1 Project Management – Topic 6 Lecture Content Planning Tools/Techniques Optimization Techniques Resource Planning & Allocation Linear.
Time Management Week 7 - Learning Objectives You should be able to: n List and describe the processes, activities, inputs, and outputs in time management.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Operations Management Project Management
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
Network Planning Techniques Program Evaluation & Review Technique (PERT): Developed to manage the Polaris missile project Many tasks pushed the boundaries.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
1 Project Planning, Scheduling and Control Project – a set of partially ordered, interrelated activities that must be completed to achieve a goal.
Project Management (專案管理)
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
1 Material Management Class Note # 6 Project Scheduling & Management Prof. Yuan-Shyi Peter Chiu Feb
The Nature of Project Management zCharacteristics of Projects: purpose, life cycle, interdependencies, uniqueness, and conflict. zProject Management Process:
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Chapter 16 – Project Management Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation by R.B. Clough.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Prof.Dr. Ahmet R. Özdural – Class Notes_06 - KMU417 Project Planning and Organization – Fall Semester.
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
ISM 270 Service Engineering and Management Lecture 5: Facility Location, Project Management, Forecasting.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Beni Asllani University of Tennessee at Chattanooga
Scheduling Scheduling : is the process of converting a project action plan into an operating time table. Why scheduling ? To answer the following questions:
Chapter 16 – Project Management
Project Management.
PROJECT MANAGEMENT.
Project Management (專案管理)
Project Management: PERT/CPM
Chapter 17 Project Management McGraw-Hill/Irwin
Project Planning & Scheduling
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
Hospital Establishment
Project Planning & Scheduling
Chapter 6: Project Time Management
PROJECT MANAGEMENT WITH CPM/PERT.
Project Management McGraw Hill “Service Management” by Fitzsimmons.
Project Planning and Budgeting
Chapter 3 Project Management.
Chapter 16 – Project Management
General Foundry Example of PERT/CPM
Exercise – A small building.
Importance of Project Schedules
Presentation transcript:

Managing Service Projects

Learning Objectives Describe the nature of project management. Construct a project network. Perform critical path analysis on a project network. Allocate limited resources to a project. Crash activities to reduce the project completion time. Analyze a project with uncertain activity times. Use the earned value chart to monitor a project. Discuss the reasons why projects fail to meet performance, time, and cost objectives.

The Nature of Project Management Characteristics of Projects: purpose, life cycle, interdependencies, uniqueness, and conflict. Project Management Process: planning (work breakdown structure), scheduling, and controlling. Selecting the Project Manager: credibility, sensitivity, ability to handle stress, and leadership. Building the Project Team: Forming, Storming, Norming, and Performing. Principles of Effective Project Management: direct people individually and as a team, reinforce excitement, keep everyone informed, manage healthy conflict, empower team, encourage risk taking and creativity. Project Metrics: Cost, Time, Performance

Work Breakdown Structure 1.0 Move the hospital (Project) 1.1 Move patients (Task) 1.1.1 Arrange for ambulance (Subtask) 1.1.1.1 Prepare patients for move 1.1.1.2 Box patients personnel effects 1.2 Move furniture 1.2.1. Contract with moving company • • •

Project Management Questions What activities are required to complete a project and in what sequence? When should each activity be scheduled to begin and end? Which activities are critical to completing the project on time? What is the probability of meeting the project completion due date? How should resources be allocated to activities?

Tennis Tournament Activities ID Activity Description Network Immediate Duration Node Predecessor (days) 1 Negotiate for Location A - 2 2 Contact Seeded Players B - 8 3 Plan Promotion C 1 3 4 Locate Officials D 3 2 5 Send RSVP Invitations E 3 10 6 Sign Player Contracts F 2,3 4 7 Purchase Balls and Trophies G 4 4 8 Negotiate Catering H 5,6 1 9 Prepare Location I 5,7 3 10 Tournament J 8,9 2

Notation for Critical Path Analysis Item Symbol Definition Activity duration t The expected duration of an activity Early start ES The earliest time an activity can begin if all previous activities are begun at their earliest times Early finish EF The earliest time an activity can be completed if it is started at its early start time Late start LS The latest time an activity can begin without delaying the completion of the project Late finish LF The latest time an activity can be completed if it is started at its latest start time Total slack TS The amount of time an activity can be delayed without delaying the completion of the project

Scheduling Formulas ES = EFpredecessor (max) (1) EF = ES + t (2) LF = LSsuccessor (min) (3) LS = LF - t (4) TS = LF - EF (5) TS = LS - ES (6) or

Tennis Tournament Activity on Node Diagram TS ES EF LS LF A2 C3 D2 G4 START E10 I3 J2 B8 F4 H1

Early Start Gantt Chart for Tennis Tournament ID Activity Days Day of Project Schedule 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 A Negotiate for 2 Location B Contact Seeded 8 Players C Plan Promotion 3 D Locate Officials 2 E Send RSVP 10 Invitations F Sign Player 4 Contracts G Purchase Balls 4 and Trophies H Negotiate 1 Catering I Prepare Location 3 J Tournament 2 Personnel Required 2 2 2 2 2 3 3 3 3 3 3 2 1 1 1 2 1 1 1 1 Critical Path Activities Activities with Slack

Resource Leveled Schedule for Tennis Tournament ID Activity Days Day of Project Schedule 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 A Negotiate for 2 Location B Contact Seeded 8 Players C Plan Promotion 3 D Locate Officials 2 E Send RSVP 10 Invitations F Sign Player 4 Contracts G Purchase Balls 4 and Trophies H Negotiate 1 Catering I Prepare Location 3 J Tournament 2 Personnel Required 2 2 2 2 2 2 2 2 2 2 2 2 2 3 2 2 2 2 1 1 Critical Path Activities Activities with Slack

Incorporating Uncertainty in Activity times F(D) P(D<A) = .01 P(D>B) = .01 TIME A M D B optimistic most pessimistic likely

Formulas for Beta Distribution of Activity Duration Expected Duration Variance Note: (B - A )= Range or

Activity Means and Variances for Tennis Tournament Activity A M B D V A 1 2 3 B 5 8 11 C 2 3 4 D 1 2 3 E 6 9 18 F 2 4 6 G 1 3 11 H 1 1 1 I 2 2 8 J 2 2 2

Uncertainly Analysis Assumptions 1. Use of Beta Distribution and Formulas For D and V 2. Activities Statistically Independent 3. Central Limit Theorem Applies ( Use “student t” if less than 30 activities on CP) 4. Use of Critical Path Activities Leading Into Event Node Result Project Completion Time Distribution is Normal With: For Critical Path Activities

Completion Time Distribution for Tennis Tournament Critical Path Activities D V A 2 4/36 C 3 4/36 E 10 144/36 I 3 36/36 J 2 0 = 20 188/36 = 5.2 =

Question What is the probability of an overrun if a 24 day completion time is promised? Days 24 P (Time > 24) = .5 - .4599 = .04 or 4%

Costs for Hypothetical Project Total Cost Indirect Cost Cost Opportunity Cost Direct Cost (0,0) Duration of Project Schedule with Minimum Total Cost

Activity Cost-time Tradeoff Crash C* Slope is cost to expedite per day Normal C D* D Activity Duration (Days)

Cost-Time Estimates for Tennis Tournament Time Estimate Direct Cost Expedite Cost Activity Normal Crash Normal Crash Slope A 2 1 5 15 B 8 6 22 30 C 3 2 10 13 D 2 1 11 17 E 10 6 20 40 F 4 3 8 15 G 4 3 9 10 H 1 1 10 10 I 3 2 8 10 J 2 1 12 20 Total 115

Progressive Crashing Project Activity Direct Indirect Opportunity Total Duration Crashed Cost Cost Cost Cost 20 Normal 115 45 8 168 19 41 6 18 37 4 17 33 2 16 29 0 15 25 -2 14 21 -4 13 17 -6 12 13 -8 Normal Duration After Crashing Activity Project Paths Duration A-C-D-G-I-J 16 A-C-E-I-J 20 A-C-E-H-J 18 A-C-F-H-J 12 B-F-H-J 15

Applying Theory of Constraints to Project Management Why does activity safety time exist and is subsequently lost? 1. The “student syndrome” procrastination phenomena. 2. Multi-tasking muddles priorities. 3. Dependencies between activities cause delays to accumulate. The “Critical Chain” is the longest sequence of dependent activities and common (contended) resources. Measure Project Progress as % of Critical Chain completed. Replacing safety time with buffers - Feeding buffer (FB) protects the critical chain from delays. - Project buffer (PB) is a safety time added to the end of the critical chain to protect the project completion date. - Resource buffer (RB) ensures that resources (e.g. rental equipment) are available to perform critical chain activities.

Accounting for Resource Contention Using Feeding Buffer NOTE: E and G cannot be performed simultaneously (same person) A2 C3 D2 FB=7 G4 START E10 I3 J2 FB=5 B8 F4 H1 Set feeding buffer (FB) to allow one day total slack Project duration based on Critical Chain = 24 days

Incorporating Project Buffer NOTE: Reduce by ½ all activity durations > 3 days to eliminate safety time A2 C3 D2 FB=2 G2 START J2 PB=4 E5 I3 B4 F2 H1 FB=3 Redefine Critical Chain = 17 days Reset feeding buffer (FB) values Project buffer (PB) = ½ (Original Critical Chain-Redefined Critical Chain)

Sources of Unexpected Problems

Earned Value Chart