CLEO II Magnet in Hall A for SoLID

Slides:



Advertisements
Similar presentations
General Considerations Jian-ping Chen SoLID-SIDIS Collaboration Meeting.
Advertisements

Panda Solenoid Timelines. General Layout constraints and HOLD POINTS.
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Magnet, Support and Infrastructure Robin Wines July 9, 2014.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
Vbine Energy Generator Assembly Pictures and Info Slide Show.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
APPENDIX A (RFI) FOR THE FABRICATION OF MULTIPLE STEEL REACTION STRUCTURES FOR NASA-MSFC STRUCTURAL TESTING Mike Roberts 12/2/09.
Zhiwen Zhao (UVa), Paul Reimer (ANL) SoLID Collboration Meeting 2013/03.
Joint Institute for Nuclear Research Further optimization of the solenoid design A.Efremov, E.Koshurnikov, Yu.Lobanov, A.Makarov, A.Vodopianov GSI, Darmstadt,
Robin Wines. Verbal agreement with BNL to acquire 48D48 magnet Contact at BNL indicates 4 of these magnets in storage BNL agrees to disassemble magnet.
Hall D Civil and Detector Progress Elliott Wolin 12-Sep-2002 U. Of Regina Middle of Nowhere Canada.
Experimental hall in Japanese mountain site Y. Sugimoto 1.
Zhiwen Zhao (UVa), Paul Reimer (ANL), Many Thanks to Eugene Chudakov, Xin Qian, Jian-Ping Chen, Whit Seay, Robin Wines, Javier Gomez, Will Oren, Rolf Ent.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status Paul Brindza January 26, 2009.
SoLID baffle update Zhiwen Zhao 2013/04/02. Current Baffle The total distance from plane 1 to 6 is 150cm which is a few cm overlapping with endcap nose.
Suspension D.J. Conroy.
KEK Hiroshi Yamaoka Task list for Magnet/Iron yoke Solenoid magnet Iron yoke Experimental hall and other facilities May 11, ’05.
Support and magnet coil KEK Hiroshi Yamaoka Nov. 10, ‘04.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla.
Thia Keppel 6/4/13 Hall A Update. Near term accelerator schedule – same as last meeting Accelerator Run II: Beam in hall 3/2014, or maybe as early as.
Aki Maki1 GLD Costing Aki Maki KEK 27/4/2006. Aki Maki2 Cost Summary 27/04/06 GLD COST SUMMARY –Solenoid Magnet**-** B JPY –Cryogenic System***** B JPY.
SoLID simulation Zhiwen Zhao UVa 2011/03/25 1. GEMC, written by Maurizio Ungaro, used for CLAS12 2.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
Gen Magnet Design JLAB MENG Contributors: Supervisor: Butch Dillon-Townes Magnet Engineer: Robin Wines Mechanical Designer: Ron Lassiter Mechanical Engineer:
GLD experimental hall and detector assembly Y.Sugimoto KEK 27 Sep
SoLID magnet and yoke by using CLEO-II Zhiwen Zhao 2012/07.
SBS Magnet and Support Status Robin Wines June 2013.
1. Introduction 2. Magnetic field design Optimization of yoke configuration in several conf. Boundary conditions -
Philip Burrows MDI Panel Meeting 15/08/06 Philip Burrows John Adams Institute Oxford University SiD and IR/MDI Issues.
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
Update/Overview of SoLID Jian-ping Chen, Jefferson Lab SoLID Collaboration Meeting Dec , 2012.
FGT Magnet C Assembly metric tons (59 US tons) -100mm thick steel plates -6.6m high x 3.1m wide x 1m deep (outer dimensions) -5m high x 2.25m wide.
Joint Institute for Nuclear Research Deformations and stresses in the flux return yoke A.Efremov, Yu.Lobanov, A.Makarov Darmstadt,
12 July 2007IRENG07 WG-A M. Breidenbach1 SiD Concept SiD is relatively modest in scale compared to the LHC detectors, and comparable to SLD: Tracker Radius.
Status of the Yoke Interfaces Presented by Evgeny Koshurnikov February 2013.
Update on SoLID Jian-ping Chen, Jefferson Lab SoLID Collaboration Meeting November 8-9, 2013.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
Summary of Platform and Hilman Rollers Deformation Studies John Amann ILC Mechanical Engineering 7/11/07.
June 2, 2008 Bill Wisniewski1 BaBar Disassembly and Disposal Overview.
M.Oriunno, SLAC 1 SiD installation with horizontal access shafts Marco Oriunno, SLAC SiD/ILD Engineering Meeting SLAC, December 2011.
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
SiD Collaboration Meeting SLAC, December 2011
CBM magnet overview of the BINP work
Some Updates on Mechanics CM-MEC Session Dec J. Lühning, GSI
Present status of the flux return yoke design
PANDA Yoke of the Magnet
MICE Partial Return Yoke Mechanical Design
Endcap shielding senarios:
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
News and brief overview of Beamline plans for the next few months
SiD Solenoid Status and Plans
Jin Huang Los Alamos National Lab
SoLID Magnet - Engineering and Cost
HRS at small angles for e+/ e- pair for APEX
Additional Upstream Coil Shielding
SoLID Simulation Zhiwen Zhao (UVa) SoLID Jlab Physics Division
Additional Upstream Coil Shielding
Updated concept of the CBM dipole magnet
New SoLID Setup Detector Layout Magnet dimension EC size Cables
Magnet, Support and Infrastructure
How magnet opening affects PVDIS acceptance
as a prototype for Super c-tau factory
Beam Halo Considerations for Back Angle Running
Zhiwen Zhao,UVa for EC group
Presentation transcript:

CLEO II Magnet in Hall A for SoLID Robin Wines 14 September 2012

Can we get the Cryostat into Hall A ? 12.3’ long 11.8’ diameter 22 tons

On a flatbed truck - NO 12’-4” 17’ 16’-9” Hall A truck ramp

On a Rolling Platform - YES Hall A truck ramp 6” rollers

Can the weight be supported ? SoLID footprint 24’ long x 19’ diameter 1000 tons 500 ton 28’ 500 ton 250 ton 82’ - Each 250 ton is over 12 ft2 foot print - Additional 150 PSF Live load over entire area 58’

Can SoLID fit in the beamline ? 4” – 15” clearance to floor of Hall A Where are HRS-L and HRS-R ? to be determined

CLEO-II

SoLID PVDIS SIDIS Cherenkov Baffle EM Calorimeter (forward angle) (large angle) MRPC Baffle Collmator Target GEM Target GEM Light Gas Cherenkov Heavy Gas Cherenkov CLEO II Coil and Yoke PVDIS SIDIS

From CLEO-II to SoLID NEW PARTS MODIFIED PARTS Endcap donut Barrel Yoke Outer Endcap bottom Barrel Yoke Inner Endcap nose Collar downstream Front Piece Shield Endcap Donut Barrel Yoke Outer Endcap Bottom Collar Downstream Spacer Spacer Barrel Yoke Inner Collar Upstream Coil Front Piece shield Endcap Nose

Estimate Modified Parts K$ Eng/Des FTE -Barrel Yoke Pieces 360 0.2 (24 pieces to be diamond wire cut) New Parts -Upstream Front Cap 677 0.5 (shield, front piece) 16’dia x 1.3’ $4.5/lb 75 tons -Downstream End Cap 875 0.8 (bottom, nose) 4’dia x 5’, 19’dia x 1’ $4.5/lb 97 tons -Detector Extension 660 0.2 (donut) 55 tons $6/lb -Downstream coil collar & hardware 500 1.0 -Magnet Support 350 0.4 (8 200 ton jacks + frame) -Detector supports (design unknown) 500 1.0 -Shipping Cornell to Jlab 240 TOTAL $4.2M 4.1 FTE

Estimate Notes Low Carbon Steel prices vary from past procurements $2/lb, $4.50/lb , $6/lb. Estimates based on volume of material, diameter and thickness to determine size of machine to handle More details of design needed to estimate cost, such as assembly plan and detector details

Extra Slides

CLEO II assembly with floor support

Hall A with HRS arms

Hall A - Civil