Beam dump for J-Parc neutrino facility

Slides:



Advertisements
Similar presentations
Target chase, decay and absorber cooling for LBNE A. Marchionni, Fermilab 8th International Workshop on Neutrino Beams & Instrumentation CERN, November.
Advertisements

The Current T2K Beam Window Design and Upgrade Potential Oxford-Princeton Targetry Workshop Princeton, Nov 2008 Matt Rooney.
Thermal Analysis of a 1 Hour Fire Resistive Joint Design for Architectural Expansion Joints Preliminary Final Report Jason Shaw.
Target & Capture for PRISM Koji Yoshimura On behalf of PRISM Target Group Institute of Particle and Nuclear Science High Energy Accelerator Research Organization.
Pion capture and transport system for PRISM M. Yoshida Osaka Univ. 2005/8/28 NuFACT06 at UCI.
Status of T2K Target 2 nd Oxford-Princeton High-Power Target Workshop 6-7 th November 2008 Mike Fitton RAL.
Shielding Studies using MARS Monte Carlo code Noriaki Nakao (SLAC) Jan. 6, 2005, WORKSHOP Machine-Detector Interface at ILC, SLAC.
Target & Horns Fluxes were distributed. W/ J-PARC type 2.5 o, 2 o, 3 o. Target cooling evaluation and test Target stress analysis Serious stress analysis.
The JPARC Neutrino Target
PSB dump endoscopy 30 th May 2013 Alba Sarrió on behalf of EN-STI-TCD Thanks to Pascal Mesenge (EN-MME)
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
JHF2K neutrino beam line A. K. Ichikawa KEK 2002/7/2 Overview Primary Proton beamline Target Decay Volume Strategy to change peak energy.
Target system for hadron & neutrino beam lines at J-PARC Contents Introduction of J-PARC Target and Target system for hadron beam line Target system for.
KT McDonald MAP Spring Meeting May 30, Target System Concept for a Muon Collider/Neutrino Factory K.T. McDonald Princeton University (May 28, 2014)
Radiological Aspects of ILC Hee-Seock Lee Pohang Accelerator Laboratory 2 nd Workshop of Korean ILC at PAL.
LAGUNA/LBNO WP4: secondary beam line status report M. Calviani, P. Velten, A. Ferrari, I. Efthymiopoulos, C. Lazaridis (CERN) + M. Zito, V. Galymov (CEA),
Horn design for the CERN to Fréjus neutrino Super Beam Nikolas Vassilopoulos IPHC/CNRS.
EUROnu Target and Horn Studies Nikolaos Vassilopoulos/IPHC-CNRS on behalf of WP2 1ECFA Review PanelDarensbury, 02/05/2011.
JPARC- Decay Volume M.Sakuda (KEK) 11 November Decay Volume Requirements Design 2. Construction Status 3. Summary and schedule In collaboration.
10th ITPA conference, Avila, 7-10 Jan Effects of High Energy Ions Accelerated in front of ICRF Antennas in LHD S. Masuzaki on behalf of the LHD Experimental.
K. McDonald Target Studies Meeting June 29, Materials for the Target System Internal Shield K. McDonald Princeton U. (June 27, 2010) Iron Plug Proton.
Radiation Protection considerations concerning a future SPS dump design Helmut Vincke DGS-RP.
NML High Energy Beam Absorbers and Dump 29-August-2011 Beams-doc-3928.
First AWAKE dump calculations Helmut Vincke. Beam on dump Muon axis inside and outside CERN Distances: Beam impact point to end of West hall: ~300 m Beam.
Future upgrade of the neutrino beam-line for multi-MW beam 5 th Hyper-Kamiokande open Vancouver July Yuichi Oyama (KEK) (for T2K neutrino.
High Power Dumps – RDR 10 atm. Cylinder water vessel with copper plate back end, 1.5m diameter x 6.5m long, in a 15 x 3 x 4 m^3 shielded enclosure, with.
Current Status and Possible Items around ‘neutrino beam’ Horn Target Remote maintenance tools Decay volume window and collimator muon monitor Many items.
1 Status of Neutrino Beamline Construction K. Nishikawa IPNS, KEK 2006 . 12 . 4.
Safety issues for WP2 E. Baussan on behalf of WP2.
Radiation safety evaluation for “KAMABOKO” Main Linac Tunnel KEK-APL : T.Sanami, S.Ban KEK-ACC : A.Enomoto, M.Miyahara ILC Mechanical & Electrical Review.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
Beam line Experiment area SC magnet Pion production target
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Activation around dump shielding, and design of beam line mask Mathieu Baudin, RP Genevieve Steele, EN-STI Helmut Vincke, RP.
Recent Studies on ILC BDS and MERIT S. Striganov APD meeting, January 24.
Transformation of Energy
Radiation Protection in J-PARC neutrino beam line Sep Yuichi Oyama (KEK) for T2K neutrino beam line construction group Happy birthday.
GRAN SASSO’S HADRON STOP Temperature’s behaviour under specified beam conditions Barbara Calcagno.
Bubble Chamber Radiator Thermal Analysis 5.0 MeV, 9.5 MeV Beam Energy Fredrik Fors Mechanical Engineering 8/20/2015.
Radiation Protection Considerations for the CDR Helmut Vincke DGS-RP.
Simulation of heat load at JHF decay pipe and beam dump KEK Yoshinari Hayato.
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
Layout and conventional facility N.Terunuma KEK. Conventional facility 1 Layout of beam line should be fixed until end of June We have to start.
High Power Target Experience with T2K Chris Densham T2K Beamline Collaboration including RAL / KEK / Kyoto.
LBNE Target Pile & Decay Pipe Cooling Andy Stefanik and Ang Lee – Fermilab September 25, 2014.
HIRADMAT/ IRRADITION facilities Overall view with the biggest object to irradiat, T9 shielding with TED inside and the beam dump with 12 meters of cast.
T2K Target status PASI Meeting Fermilab 11 th November Chris Densham STFC Rutherford Appleton Laboratory On behalf of the T2K beam collaboration.
Horn and Solenoid options in Neutrino Factory M. Yoshida, Osaka Univ. NuFact08, Valencia June 30th, A brief review of pion capture scheme in NuFact,
LBNE 2.4MW Absorber NBI 2014 Presented by Brian Hartsell Contributions by: Kris Anderson, Yury Eidelman, Jim Hylen, Nikolai Mokhov, Igor Rakhno, Salman.
KEK Radiation Related Topics neutrino beam construction subgroup Yuichi Oyama (KEK) and target monitor subgroup for.
Irradiated T2K Ti alloy materials test plans
Beam Dump Hall Volume Beam Dump Meeting at SLAC May S.Ban
Horn and Solenoid Options in Neutrino Factory
Studies on Energy Deposition and Radiation for the 4horn system
Radiation protection of Linac4 M. Silari Radiation Protection Group
Thermo-mechanical analysis of the D3 dump in the TT2 line (PS)
CHEN, Fusan KANG, Wen November 5, 2017
M. Calviani, A. Ferrari (EN/STI), P. Sala (INFN)
EUROnu Beam Window Studies Stress and Cooling Analysis
Fassò, N. Nakao, H. Vincke Aug. 2, 2005
Calorimetry Practice 1. If a 1.45 g sample of iron at 95.0 ˚C is placed into water at 21.6 ˚C , if the final temperature of the water and iron is 26.7.
CFS consideration on the Main Dump and around
Unit 9: Earth Materials Vocabulary.
Update on Fracture Analyses
Neutron guide Shielding Concept
Single Detector Design
CEPC Collider Magnets CHEN, Fusan November 13, 2018.
Cu67 Isotope Radiator & Target
CEPC Radiation and Shielding
Presentation transcript:

Beam dump for J-Parc neutrino facility

Requirement For the 1st phase: accept 0.75 MW beam For the 2nd phase : accept 4MW beam Heat Load Among total beam power, 20% is deposited at dump. Radiation shielding 11mSv/h at the boundary of concrete and soil 0.25mSv/h at the surface of soil Muon Monitor monitor the direction and intensity of the beam

Thickness required for radiation shielding Top View The amount and shape of iron should be optimized. Front View Side View

Heat load from radiation At x=0 plane unit: J/cm3/pulse

Example of Heat Analysis(4MW) ½ Model Boundary condition (All) outer surface of the iron is cooled by water. concrete Temperature distribution in Iron beam iron soil Result Max. in iron : 700oC -> need aluminum plate or something in concrete : 54oC

Muon monitor Monitoring of the beam direction and intensity. Threshold 8 GeV/c ? Probably 5 GeV/c is preferable… (under study) To achieve 5 GeV/c threshold, the monitor has to be installed between irons under high radiation condition.