SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Advertisements

1 IR Hall for GLD Oct Y. Sugimoto KEK. 2 Underground hall HybridPure CMS IR hall area (WxL)25x55 Beam height8.6 Crane max hook height20.5 Largest.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
NLC - The Next Linear Collider Project IR Layout Tom Markiewicz SLAC LCWS Cornell 15 July 2003.
NLC - The Next Linear Collider Project NLC IP Layout What’s New? Tom Markiewicz LC’99, Frascati, Italy October 1999.
CF Constraints to the Strawman BDIR Configuration Tom Markiewicz SLAC 07 January 2005 IR Hall Muon Wall Beam Dump Detector Photon Dump 4m tunnel with “Y”
October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.
Interpret drawings of domestic structures. Drawing Layout The drawings on the next two pages show how a construction drawing can be laid out to show the.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Push Pull Considerations
Global Design Effort Detector concept Plenary introductory talk IRENG07 Kurt Krempetz September 17, 2007.
BDS Design Studies John Amann ILC Mechanical Engineering 10/24/06.
Problem The basic cells of eRHIC’s two stacked FFAG accelerators are designed for the ~380m radius of curvature of the RHIC tunnel arcs. However, RHIC’s.
Philip Burrows MDI session, LCWS06 Bangalore, 10/3/06 SiD MDI Issues Philip Burrows John Adams Institute Oxford University Thanks to: Marty Breidenbach,
Hall D Civil and Detector Progress Elliott Wolin 12-Sep-2002 U. Of Regina Middle of Nowhere Canada.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
Philip Burrows SiD Meeting, Paris 11/02/081 Machine Detector Interface Issues Philip Burrows John Adams Institute Oxford University Thanks to: Tom Markiewicz.
September 18, 2007H. J. Krebs1 SiD Collaboration One Piece End Door Design Concept plus Forward Equipment Interfaces H. James Krebs SLAC September 18,
Si D in 14mrad/14mrad/z=0 ILC T. Markiewicz/SLAC SiD Advisory Group 14 August 2006.
1 GLD and GLDc Sep. 12, 2007 Y. Sugimoto KEK. 2 Compact GLD Option Motivation –GLD and LDC will write a common LoI –The detector design should have common.
ORKA Preservation Task Force ORKA Preservation Task Force first meeting Wednesday, February 8, Notes by Peter H. Garbincius Notes from meeting are.
Alice overview New detector and chamber ALICE TC.
SiD IR & MDI Engineering Progress Prelude to a Discussion of Integration with ILD and Based on Marco Oriunno’s Jan 2008 Talk at SiD CM Tom Markiewicz/SLAC.
SiD Engineering Design for the LOI Kurt Krempetz (Layer 5) (Layer 1) VXD.
NLC - The Next Linear Collider Project IR Geometries & Constraints on Forward Detectors Tom Markiewicz SLAC ALCPG SLAC 08 January 2004.
1 SiD Push-pull Plans Marco Oriunno, SLAC International Workshop on Linear Colliders 2010 Geneva, October 2010 M.Oriunno, IWLC10 – Geneva, Oct.2010.
SiD IR & MDI Status & Comments Tom Markiewicz/SLAC ALCPG, Fermilab 26 October 2007.
SiD Engineering and Solenoid Kurt Krempetz (Layer 5) (Layer 1) VXD.
SiD Collaboration Meeting Highlights Tom Markiewicz/SLAC ILC BDS Meeting 08 May 2007.
Global Design Effort Magnetic and Mechanical FEA of SiD IRENG07 Bob Wands September 18, 2007.
Philip Burrows MDI Panel Meeting 15/08/06 Philip Burrows John Adams Institute Oxford University SiD and IR/MDI Issues.
September 20, 2007H. J. Krebs/B. Wands/B. Cooper1 SiD Collaboration Preliminary End Door Design Concept Support of Forward Systems H. James Krebs Bob Wands.
ILD and SiD in Japanese site (from discussions in SiD/ILD E/D Interface Working Meeting) Yasuhiro Sugimoto, Marco Oriunno 2011/12/15 SiD
Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south shield wall l Description of compressor layout and services.
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
SiD nominal mass: Barrel 5000 T; (each) Door 2500 T Dimensions: Z = 20.0 m X = 20.0 m Delta Y = 9 m (Top of Platform to beamline) Positioning Tolerance.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
MEA Machine and Experiment Assembly Norbert Meyners, MEA 12. July 2007ILC IRENG07 WG-A1 LDC Engineering Design (Status) Introduction General Design Detector.
1 Implementation at RAL Iouri Ivaniouchenkov on behalf of Elwyn Baynham, Tom Bradshaw, Tony Jones, Jim Rochford Engineering Department, RAL MICE Collaboration.
Philip Burrows SiD Monthly Phone Meeting, 4/10/071 IR Issues from IRENG07 Philip Burrows John Adams Institute Oxford University.
12 July 2007IRENG07 WG-A M. Breidenbach1 SiD Concept SiD is relatively modest in scale compared to the LHC detectors, and comparable to SLD: Tracker Radius.
Implication of gamma-gamma on 14mr tunnels discussion (questions for discussion with WG-C and WG-A) Valery Telnov Budker INP IRENG07, Sept.19, 2007, SLAC.
IRC 2009 OVERALL. SITE PLAN PROPERTY LINES LOCATION OF BUILDING GRADES STREETS.
M.Oriunno, SLAC 1 SiD installation with horizontal access shafts Marco Oriunno, SLAC SiD/ILD Engineering Meeting SLAC, December 2011.
SiD Collaboration Meeting SLAC, December 2011
Interaction Region and Detector
Machine Detector Interface Design Updates
Detector Hall Design and Cost Information CONVENTIONAL FACILITIES
Platform Design for the Target Spectrometer using Heavy-Weight Rollers J. Lühning, GSI Darmstadt, Three design goals for Platform: Low construction.
Updated Design of Detector Hall
Hcal Geometry and Assembly
Experimental hall design in Japanese site
PANDA Yoke of the Magnet
Layout of Detectors for CLIC
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
SiD Muon Yoke Structure - Deformation Studies -
SiD LoI Costs M. Breidenbach 29 July 2010 M. Breidenbach.
Changes to SiD since the DBD
Sub-Detector Assembly Area Summary of discussion at ALCW2015
ILD-0 overall dimensions C.Clerc ILD meeting, Seoul 17/02/09
SiD Engineering Status Report
Radiation Physics requirements for the IR
SiD IR Layout M. Breidenbach, P. Burrows, T. Markiewicz
Extract from today’s talk given to DCB
Specifications for the JLEIC IR Magnets
A 12-min Introduction to The ILC Machine Detector Interface and SiD
Electron Collider Ring Magnets Preliminary Summary
IR Beam Transport Status
Option 1: Reduced FF Quad Apertures
Presentation transcript:

SiD IR Layout M. Breidenbach, P. Burrows, T. Markiewicz SiD Collaboration Meeting 16-17 December 2005 Fermilab

2005.10.11 Discussion SiD Dimensions from 2005-05 files Barrel radius=6.450m Barrel half-length=2.775m EC Yoke=3.12m thick EC Yoke ends at 5.895m=2.775+3.120m Assumed beam height=Barrel radius + 1m Garage assembly requirements 3m shielding wall between beamline position & garage 5m free space between shield wall & rotated barrel yoke 2m free + 2m assembly fixture+1m free 4m free space between rotated barrel yoke & rotated barrel HCAL 5m free space between rotated barrel yoke & pit wall

Detector Access Guesstimates Door support leg overhang= 3.2m~25% barrel diameter Door opening= 3.0m Free space to walk around door ends= 1.9m Reserved radius = 8.0m (6.45 iron +1.55m services) Free space between dressed barrel & pit walls= 2.0m PACMAN radius=

SiD closed, on beamline, in 20m x 28m

SiD open, on beamline, in 20m x 28m

SiD in 48m x 28m IR, anamorphic scales Barrel Yoke rotated 6.45 m 4.00 m HCAL rotated 6.45 m 5.00 m

SiD in 48m x 28m IR, x-scale=y-scale

Elevation View Pit Elevation: 30m ? 1.000 Barrel-floor 12.90 Detector diameter 12.90 Free space above detector 3.000 Crane bridge and hook

Remaining Issues Presumably, 5.105m long final doublet support platform from door open position (8.895m) to pit wall (14.00m) which mates well with pacman Many beamline devices including Crab Cavity within 14m of IP Is a PACMAN solution viable given transverse size of these devices? Suggest we minimize 1.9m free space at end when door open as well as 3.2m door support length 8.1m long PacMan seems very long 55cm clearance between door radius and pacman seems marginal