TGac Status and Timeline

Slides:



Advertisements
Similar presentations
Doc.: IEEE / Submission March 2004 Larry Taylor (Staccato)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Advertisements

Doc.: IEEE /1445r1 Submission TGad November 2011 Closing Report November 2011 Eldad Perahia, Intel CorporationSlide 1 Date: Authors:
Doc.: IEEE /0xxxr0 Submission May 2010 Osama Aboul-Magd (Samsung)Slide 1 TGac May 2010 Closing Report Date: Authors:
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
Doc.: IEEE /0420r0 Submission March 2008 Bruce Kraemer, MarvellSlide Marvell Lane, Santa Clara, CA, TGn Closing Report Orlando, FL,
Submission January 2016 doc.: Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [ e Closing.
Doc.: IEEE /1583r1 Submission November 2011 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac November 2011 Closing Report Date: Authors:
Doc.: IEEE /0031r1 Submission January 2010 Dorothy Stanley, Aruba NetworksSlide 1 IEEE TGv January 2010 Agenda Date: Authors:
A Proposed Timeline for IEEE ba TG
TGv Closing Report March 2008
Suggestion to update Work Plan for IEEE m Standard
IEEE TGv March 2010 Agenda Date: Authors: March 2010
IEEE aj January 2016 Closing Report
IEEE TGa Project Timeline
TGax March 2017 Closing Report
TGac Documents and Timeline
July 2014 doc.: IEEE November 2017
TGad September 2010 Closing Report
July 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing Report for TG4q (ULP) Task Group, July.
January 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for January 2018] Date.
SG4a Project Timeline January 2003 doc.: IEEE /056r0
IEEE Working Group on Mobile Broadband Wireless Access
TGae Closing Report – January 2010
TGae Closing Report – March 2010
TGae Closing Report – May 2010
Candidate Statement- Osama Aboul-Magd
Submission Title: ULP TG Closing Report Waikoloa, HI 2013
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
March 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing Report for TG4q (ULP) Task Group,
<month year> doc.: IEEE < e> <September 2018>
Submission Title: ULP TG Closing Report Dallas Texas
TGaf San Francisco Closing Report
SG4a Project Timeline Interest Group ‘a’ Activities Aug 03
TGad July 2010 Editor Report
<month year> doc.: IEEE < e> <November 2018>
802.11bd Timeline Date: Authors: January 2019
<month year> doc.: IEEE < e> <Mar 2018>
Tgae Closing Report – November 2009
PLANNING LOOKING AHEAD…. Long Term Goals (Assigned to…)
Proposed timeline for the Light Communications TG
IEEE SGa Project Timeline
IEEE P Wireless RANs Date:
TGad March 2011 Closing Report
September 2009 Closing Report
TGae Closing Report – July 2010
TGad May 2011 Closing Report
November 2010 Closing Report
TGm Closing Report – May 2010
Task Group AY September 2017 Closing Report
IEEE mc Closing Report for July 2013
TGae Closing Report – July 2011
TGae Closing Report – January 2011
<month year> doc.: IEEE < e> <November 2018>
Task Group AY May 2016 Closing Report
TGac January 2009 Closing Report
IEEE TGv November 2010 Agenda
TGax September 2017 Closing Report
2012 Safety Group Advantage Program Timeline
2012 Safety Group Advantage Program Timeline
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
IEEE mc Closing Report for September 2015
2013 Safety Group Advantage Program Timeline
July 2014 doc.: IEEE /21/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
IEEE aj March Closing Report
TGae Closing Report – November 2011
IEEE aj May Closing Report
July 2009 Closing Report Date: Authors: July 2009
TGax November 2017 Closing Report
IEEE ah Timeline Projection
TGbd Closing Report – Vietnam
Presentation transcript:

TGac Status and Timeline January 2009 doc.: IEEE 802.11-yy/xxxxr0 March 2009 TGac Status and Timeline Date: 2009-03-09 Authors: Osama Aboul-Magd, Nortel Networks Osama Aboul-Magd, Nortel Networks

TGac Status March 2009 Functional Requirements Selection Procedure Submission 09/0071 presented a set of questions related to TGac functional requirement Hopefully will have the first draft for discussion in this meeting Selection Procedure Submission 09/0035r1 describes a proposed selection procedure. Further discussion on conference call, Feb. 12. Usage Models Submission 09/0161 describes Usage Models specific to TGac. The document is accepted as the TGac Usage Models baseline document. Need a formal motion. Channel Models Two submissions on Channel Models (09/0088 and 09/0179) were presented. The two presentations agreed on the use of the 802.11n channel models for TGac and incorporate changes as needed. Expect at least one submission this week Specification Framework Submission 09/0086 provided an initial straw man to stimulate discussion Osama Aboul-Magd, Nortel Networks

Proposed Timeline March 2009 We are Here 2009 2010 2011 WG April May June July Aug Sept Oct Nov Dec Jan Feb Mar April May June July Aug Sept Oct Nov Dec Jan Feb Mar April May June July Aug Sept Oct Nov Dec Usage Models Functional Requirements Selection Procedure Specification Framework Comparison Criteria/Simulation Models WG Letter Ballot TGac Draft First Draft Osama Aboul-Magd, Nortel Networks