LARP Phase II Secondary Collimator RC-1

Slides:



Advertisements
Similar presentations
BARTOSZEK ENGINEERING 1 The Design of the Booster Collimators Larry Bartoszek BARTOSZEK ENGINEERING 3/10/03.
Advertisements

RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
Coll Eng E Doyle 1/18 LARP Phase II Secondary Collimator RC1 Prototype Engineering Status 6/21/06 Jaw-hub-shaft concept - continued Permanent.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
A. Bross Imperial College – 9/04 Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
1 RF-Structures Mock-Up FEA Assembly Tooling V. Soldatov, F. Rossi, R. Raatikainen
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
ENGINEERING DESIGN AND FABRICATION OF PETS V. Soldatov¹, D. Gudkov¹, I. Syratchev², A. Samoshkin¹, G. Riddone², A. Olyunin¹, S. Atieh² 1 – JINR, Dubna,
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
MECHANICAL DESIGN OF TCSP COLLIMATORS Secondary Collimators Embedding BPMs L. GENTINI, A. Dallocchio, A. Bertarelli, F. Carra, M. Garlasche.
Electrostatic Septum For AGS C. Pai Brookhaven National Laboratory Collider-Accelerator Department
LHC Phase II Collimator teleconference - 4 March 2008LHC Rotatable Phase II Collimators 1 beam LARP Phase II collimator Progress and Plans 4 March 2008.
1 LARP Phase II Secondary Rotatable Collimator Evolution of design changes 3 rd March, 2010.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 16 May 2006 No 1 /22 LARP Phase II Secondary Collimator RC1 Collimator Test Program Revised 5/15/06.
SLAC RC Status Report 30 August 2010 LHC Collimation Working Group Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
ZDC Remote Handling Tool Structure and Force Analysis P. Debbins University of Iowa December 10, 2009.
SLAC R&D Mtg November 2007LHC Rotatable Phase II CollimatorsSlide # / 17 beam LARP Rotatable Collimators for LHC Phase II Collimation 12 November.
LARP LHC PHASE II COLL RC1 - S. Lundgren 1 April 2009 No 1 /6n LARP Phase II Secondary Collimator RC-1 Mechanical Design Review 01/04/09.
1.3GHz Input Coupler for ILC
A. Bertarelli CERN TS – MME Group 1 CERN European Organization for Nuclear Research Actuating system of the LHC Collimators (Phase 1) Main Features.
LARP Rotatable Collimators for LHC Phase II Collimation 18 April 2007 LARP Collaboration Meeting – Fermilab Tom Markiewicz/SLAC Representing Gene Anzalone,
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Task List for Phase II Rotatable Collimator Project at SLAC 30 January 2007 CERN/LARP Video Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
Collimation Overview 28 October 2008 LARP CM11, Fermilab Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program 1)Short Status.
LARP LHC PHASE II SECONDARY COLLIMATOR CD1 REVIEW. - E. Doyle 15 Dec /25 LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 Prototype Engineering.
LARP Rotatable Collimators for LHC Phase II Collimation 09 July 2007 SLAC R&D Status Meeting Gene Anzalone, Eric Doyle, Lew Keller, Steve Lundgren, & Tom.
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
LARP Rotatable Collimators 19 June 2006 ILC R&D Status Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 10 Dec 2007 No 1 /12 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
LARP LHC PHASE II COLL RC1 - S. Lundgren 21 Sep 2009 No 1/17 LARP Phase II Secondary Collimator RC-1 Collimator Development Status and Outlook Revised.
Magnetized Beam LDRD: Design Tasks February 19, 2016.
1 SLAC RC Status Report 19 July 2010 LHC Collimation Working Group Meeting Jeff Smith/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
LARP Phase II Secondary Collimator Status Report SLAC ILC R&D Summary Meeting 24 April 2006 T. Markiewicz/SLAC.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
LCWS11 WG4 Fully featured accelerating structure engineering design
LARP Phase II Secondary Collimator RC1, ETC - Status 4/10/06
Status of material tests
LARP Phase II Secondary Collimator RC1
Complementary ISTC Projects #3888, 3889p
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 RC1 Construction and Test Plan LARP LHC PHASE II COLL REVIEW – RC1.
LARP Phase II Secondary Collimator RC-1
Design of Distribution Feedbox at LHC P7
SLAC RC Status Report US LHC Accelerator Research Program
Recommendations of 12/16/05 review committee & SLAC response
LARP Collimation – Engineering & Analysis
23 April 2012 Tom Markiewicz/SLAC
LARP Phase II Secondary Collimator RC1
Phase II Collimators : design status
LARP Phase II Secondary Rotatable Collimator
LARP Phase II Secondary Rotatable Collimator
LARP Phase II Secondary Collimator RC-1
LARP Phase II Secondary Collimator RC-1
LARP Phase II Secondary Collimator RC-0 and RC-1
LARP Rotatable Collimators for LHC Phase II Collimation
LARP Phase II Secondary Collimator RC-0 and RC-1
Presentation transcript:

LARP Phase II Secondary Collimator RC-1 Collimator Development Status and Outlook Revised 03/16/09 LARP LHC PHASE II COLL RC1 - S. Lundgren 16 Mar 2009 No 1 /15

Quick Review of SLAC Design Fabrication update Testing @ SLAC Outline Quick Review of SLAC Design Fabrication update Testing @ SLAC Proposed Testing @ CERN LARP LHC PHASE II COLL RC1 - S. Lundgren 16 Mar 2009 No 2 /15

Overview of SLAC Design Jaw configuration Recapping: the 2mm annular gap between the Shaft and Jaw allows the Jaw ends to bend away from the beam centerline under beam heat load. End Support System improvements High strength stainless steel simplifies assembly and “beefs up” the support. Rotation/Gear Drive Mechanism detail Gear Drive now a separate piece. Permits simpler image current foil configuration. Robustness Test cylindrical tank Large diameter flanged ends allow access to moving parts. LARP LHC PHASE II COLL RC1 - S. Lundgren 16 Mar 2009 No 3 /15

Jaw End Support System ~100 1mm dia. ball bearings in End adapter for rotation (Bellows removed to show support detail) Jaw Shaft End rests in slot of Support and is held by jam nuts on either side Flexible support is high strength stainless steel welded to bellows cuff during bellows fab Bellows mounting to Drive is unchanged from CERN design Cooling tube adapter is tig welded after Jaw is installed in Tank “Beefed-up” design still permits Jaw end-to-end offsets (3mm), Shaft thermal expansion and static sag. Deflection is improved for non-horizontal collimator positions. LARP LHC PHASE II COLL RC1 - S. Lundgren 16 Mar 2009 No 4 /15

Cutaway of Jam Nut and Support 100 1mm dia. Ball bearings roll in “V” groove Rotation Mechanism mounts to tab on bearing race Jam Nuts mate at beveled surfaces to strengthen tip of Support LARP LHC PHASE II COLL RC1 - S. Lundgren 16 Mar 2009 No 5 /15

Up Beam End with Image Current Foil Chain Tensioners used to clamp DN250 flanges to End Adapter Tank End Adapter (not shown) Beam centerline Ratchet actuator (not shown) mounts to tank floor Image Current Foil shadows gear drive mechanisms LARP LHC PHASE II COLL RC1 - S. Lundgren 16 Mar 2009 No 6 /15

1st Glidcop Center Hub awaiting copper plating and a final grooving Fabrication Update 1st Glidcop Center Hub awaiting copper plating and a final grooving step prior to brazing to the Half Shafts. Is in shop queue. Final Moly Half Shaft promised ship date is March 27th. Glidcop Jaw material promised ship date also March 27th. Mandrel fabrication is progressing well…. See next slide! LARP LHC PHASE II COLL RC1 - S. Lundgren 16 Mar 2009 No 7 /15

1st RC-1 Mandrel Prep for Grooving Mandrel and Al strong-back set-up for waxing Rotation spreads lapidary wax Strong-back was also heated and additional wax was added just prior to inserting into bore When wax cools parts bond together ensuring successful groove machining Heat parts again to separate. Link to complete set of photos: http://www-project.slac.stanford.edu/ilc/larp/rc/Photos LARP LHC PHASE II COLL RC1 - S. Lundgren 16 Mar 2009 No 8 /15

Grooving in work X,Y & Z axes 4th or “B” axis rotates LARP LHC PHASE II COLL RC1 - S. Lundgren 16 Mar 2009 No 9 /15

RC-1 and Robustness Test Drawing Status Still a ways to go: End Support and Bellows assembly fabrication drawings in work now. Robustness Test Tank Assembly fabrication drawings planned for April and May. LARP LHC PHASE II COLL RC1 - S. Lundgren 16 Mar 2009 No 10 /15

RC-1 Near Term Plans The 2 Mandrels needed for the LHC Test Assembly will be released for quote after successful machining on 1st Mandrel. 1st Mandrel/Coil Assembly is planned for winding in April Brazing in May Facet machining in June LARP LHC PHASE II COLL RC1 - S. Lundgren 16 Mar 2009 No 11 /15

Drive Test Stand (CERN Drives) 1st RC-1 (when complete) RC-0 (Heater Test Jaw) Jaw and Support parts (plastic) are mocked up on the Drive Test Stand LARP LHC PHASE II COLL RC1 - S. Lundgren 16 Mar 2009 No 12 /15

Additional RF resistance tests Dummy Jaw End Assembly Tests to be performed with 1mm dia rhodium plated ball bearings (in actual configuration) will define the side load force needed for an acceptable resistance value. Perhaps the resultant force from the Image current foil/strap transverse displacement would be adequate. LARP LHC PHASE II COLL RC1 - S. Lundgren 16 Mar 2009 No 13 /15

Proposed TT60 Robustness Test Configuration Preferred orientation is 0 degrees. RC-0 & RC-1 Jaws are used. Collimator mounts on CERN stand. Cooling water quick connect? Cables do not? Laser micrometers mount here for measuring possible permanent distortion after beam strike End ports are 1mm thick titanium. Vacuum pump (if needed) mounts to tee at down beam end. Chain tensioners used on all flanges. Cameras mount here (both ends) for remote viewing surface damage to RC-1 Jaw after beam strike Beam DN250 flanges at ends permit access prior to test and after “cool-down period” LARP LHC PHASE II COLL RC1 - S. Lundgren 16 Mar 2009 No 14 /15

Proposed LHC Test comments Planned orientation is 90 degree but could be adapted to that required by lattice position selected for our test. Flanged ends are still planned for access to image current and moving parts prior to LHC Test and after “cool-down” period. Cooling water and control cables mount with quick connects. Square OFE copper is planned for cooling tube for LHC. a braze tests is planned using round tubing in a round bottom groove to qualify the configuration. we have been unable to locate a vendor willing to provide the square i.d. square o.d. configuration in Cu-Ni necessary for flow rate spec. Final determination of Tank shape will be made once RF modeling results are in. LARP LHC PHASE II COLL RC1 - S. Lundgren 16 Mar 2009 No 15 /15