September 26, 2001 Public Workshop Orange County MS4 Permit, Urban Storm Water Runoff Management Program Order No. 01-20 (NPDES No. CAS 618030) Mark Smythe.

Slides:



Advertisements
Similar presentations
NPDES Phase II Permit City of St. Louis Park Annual Storm Water Informational Meeting April 16, 2009 Scott Anderson Superintendent of Utilities.
Advertisements

Session 3 Outline What is a Illicit Storm Water Discharge? - Potential Sources What is required by the permit? What should I have in place prior to getting.
Session 1 Outline Overview of Phase II What is expected? What should we be doing today? What are others doing? Suggested steps to move your program forward.
Internalizing Stormwater Requirements Between TBR and Facilities Construction Projects and Permanent Stormwater Treatment Mgmt. Steve Casey, PE, CPESC.
The Urban Connection: NPDES and Storm Water in the State of Delaware Sandra M. Goodrow, Ph.D., C.F.M. Environmental Scientist IV Surface Water Discharge.
SW101 Municipal Separate Storm Sewer Systems (MS4s)
When It Rains, It Drains An Overview of Our Community’s New Storm Water Management Program.
Stakeholders Meeting – March 5, 2014 Selvin T. Southwell, P.E.
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
Stormwater Rulemaking Briefing US Environmental Protection Agency.
Construction Site Stormwater Compliance Presentation for CALBIG October 9, 2013 Kristin Kerr, P.E., QSD EOA, Inc. on behalf of the San Mateo Countywide.
Los Angeles County MS4 Permit Reissuance: New Directions & Strategy Presented by LA Regional Water Quality Control Board Southern California Water Dialogue.
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
Santa Ana Region Stormwater Permit TMDL Requirements and Costs
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
Austin Peay State University Stormwater Program Kristen Spicer, Ph.D.
June 1, 2001 Public Workshop Orange County MS4 Permit, Urban Storm Water Runoff Management Program Order No (NPDES No. CAS ) Mark Smythe Chief,
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
June 19, 2014 CONTROL OF TRASH ENTERING WATERWAYS IN CALIFORNIA DRAFT WATER RESOURCES CONTROL BOARD POLICY.
Arkansas Storm Water Program Arkansas Update On Construction, Industrial & Small MS4.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Municipal Regional Stormwater NPDES Permit Overview of Requirements, Recommended Changes, and Assistance Needed March 12, 2009.
MAINTAINING WATER QUALITY CITY OF TULSA PERMIT ENFORCEMENT.
Regulatory Refresher The Municipal Regional Permit Kristin Kerr, P.E., QSD EOA, Inc. Municipal Maintenance Training Workshop May 23, 2013.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
Pretreatment, Pollution Prevention and Storm Water Committee California’s Storm Water Program Bruce A. Fujimoto State Water Resources Control Board February.
The purpose of the San Dieguito Union High School District’s stormwater management plan is to comply with applicable stormwater regulations, educate.
 Why are we here?  Without regulations, rivers used to catch fire. Rules and Regulation.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
Response to Comments Workshop Presented by: Eric Beck, P.E. RIDEM July 24, 2003 Developed by: Laura Stephenson, Greg Goblick, Margarita Chatterton.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
1 Stormwater Phase II Municipal Separate Storm Sewer Systems and Act 167 Doug Brennan PA DEP September, 2002.
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork City of Southlake Storm Water Management Plan Christi Upton
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
MS4 Permitting Process William Creal Water Bureau Permits Section Chief.
Introduction to MS4 Stormwater Requirements (2009)
Public Hearing Orange County Municipal Separate Storm Sewer System (MS4) Permit, Urban Storm Water Runoff Management Program Order No. R (Formerly.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Workshop on the draft General Permit for Discharges of Storm Water from Small MS4s Fresno August 6, 2002 Redding August 8, 2002 San Luis Obispo August.
Illicit Discharge Detection and Elimination 6/4/20161 Illicit Discharge Detection and Elimination.
Stormwater and C.3 Overview Tom Dalziel, Assistant Manager Contra Costa Clean Water Program.
DRAFT PHASE II STORMWATER PERMIT New Requirements Terri Fashing - MCSTOPPP Manager Wendy Atkins – City of Sonoma Stormwater Coordinator With assistance.
Phase II National Storm Water Regulations What’s in it for you?
Los Angeles Regional Water Quality Control Board - March 16, 2006 Total Maximum Daily Loads for Trash.
Storm Water Permitting Commission on the Future of Virginia’s Environment August 27, 2001 Department of Environmental Quality.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Public Workshop: RIPDES Draft Phase II Storm Water Regulations RI Department of Environmental Management RIPDES Storm Water Program July 25, 2001 Contacts:
County-Wide Act 167 Plan “County-wide Act 167 Stormwater Management Plan for Chester County, PA” was prepared by: Chester County Water Resources Authority.
Commercial, Industrial, and High-Risk Runoff 6/13/20161 Commercial, Industrial and High Risk Runoff.
MS4 Permit – Meaning, History, and Annual Report Results Watershed Partners 4/13/
Williamsburg’s Local Strategies to meet the ChesBay TMDL March 2012 Chesapeake Bay Watershed Virginia Maryland Pennsylvania New York Delaware West Virginia.
Stormwater 101 History of the Clean Water Act MARCH 22, 2016 WEST COVINA CITY COUNCIL CHAMBERS.
Expectations for Construction Activities The City of Hendersonville Department of Public Works Erosion Control Inspection Review Process Power Point Presentation.
NPDES Stormwater Rules Phase 1 implemented in 1990 –Large cities (
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
Urban Runoff Pollution Ordinance 2017 Proposed Update
Municipal Separate Storm Sewer System (MS4) Permit
Summit County MS4.
Sacramento County Stormwater Quality Program
Stormwater Management Program
John Tinger U.S. EPA Region IX
MS4 OVERVIEW 2015.
Sacramento County Stormwater Quality Program
Rule 5/6/13 Conversion to General Permits
Presentation transcript:

September 26, 2001 Public Workshop Orange County MS4 Permit, Urban Storm Water Runoff Management Program Order No (NPDES No. CAS ) Mark Smythe Chief, Coastal Storm Water Unit (revised 9/27/01)

Background Changes From the June 15, 2001 Draft Comparison to the R9 Orange County Permit Anticipated Changes in the October 12, 2001 Draft Remaining Issues

Storm Water Permits Statewide General Construction Statewide General Industrial Caltrans Other storm water discharges regulated through: MS4 - Municipal Separate Storm Sewer System –Municipal activities –Residential activities –Industrial and construction activities

Storm Water NPDES Permits Unlike most NPDES permits, storm water permits are not required to have numeric discharge limits, but nothing prohibits the inclusion of such limits. Historically, municipal storm water permits have been based on an iterative process: –Implement structural and non-structural Best Management Practices (BMPs) –Evaluate if water quality standards are being met in receiving waters –If the standards are not being met then additional BMPs must be implemented and the process repeated.

MS4 Permit History For Orange County, this will be the start of the third permit cycle. For Los Angeles & Ventura Counties (Region 4), this will also be the start of their third permit cycle. For San Diego County (Region 9), this was the start of their second permit cycle, no new permit was issued in 1995/6.

MS4 Permit History (cont.) The 1990 and 1995 MS4 permits have lacked prescription, generally allowing the permittees to develop programs that are suitable to that particular county and its problems. As is the case with the other Statewide storm water permits, as the permits mature, it is possible to identify weaknesses and specifically address those weaknesses through more prescriptive requirements

Major Changes From the June 15, 2001 Draft Implementation of Standard Urban Storm Water Management Plans (SUSMPs) Municipal Inspection Requirements Monitoring Requirements Others –MS4 discharges not to cause or contribute to a nuisance. –Ensure that permittees have legal authority. –Specifying additional considerations in CEQA review. –Public education goal of 10 million impressions.

Standard Urban Storm Water Management Plans (SUSMPs) Los Angeles County –In the 1996 permit, Region 4 required the permittees to prepare SUSMPs, listing required sized, structural and non-structural BMPs on new development and redevelopment. –By 1999, the permittees had not submitted an acceptable plan, so staff prepared the SUSMPs. San Diego County –Adopted similar SUSMPs in the 2001 San Diego Permit. Orange County –Prepared a Drainage Area Management Plan (DAMP) which included requirements on new development and redevelopment.

SUSMPs (cont.) The June 15, 2001 draft permit: –Allowed continued implementation of the current DAMP/Water Quality Plan (WQMP) until an improved DAMP/WQMP is developed that meets the standards set forth in the permit or July 1, –On July 1, 2004, if an acceptable plan was not submitted, then implement the size-based SUSMP criteria essentially equivalent to Los Angeles and San Diego.

SUSMPs (cont.) The September 12, 2001 draft permit: –Allow permittees to develop an improved DAMP/Water Quality Plan (WQMP) that meets the standards set forth in the permit. –In the interim, implement the size-based SUSMP criteria essentially equivalent to Los Angeles and San Diego on all applicable projects that have not received project or tentative tract approval by Sept. 26, 2001.

Municipal Inspection Requirements Restaurants Construction Sites Industrial Sites

Restaurant Inspections The county Public Facilities and Resources Department (PFRD) or county public health inspectors are to establish an inspection program to ensure that oil & grease are properly disposed of, equipment wash water is not discharged off site, parking lots are not hosed down and grease traps have adequate capacity and are maintained.

Construction Inspections Each permittee create and maintain an inventory of construction sites. Sites will be prioritized into high, medium and low threat to water quality. Minimum wet weather inspections - (high, monthly), (medium and low, twice during 7 months). Dry weather as necessary to prevent pollutants from entering storm drain system and prevent unauthorized, non-storm water discharges. Adequate enforcement authority to levy fines, require bonds, issue stop work orders, or deny permits.

Industrial Inspections Each permittee create and maintain an inventory of industrial/commercial sites. Sites will be prioritized into high, medium and low threat to water quality. All high priority sites should have been inspected by July 1, 2003 and on an annual basis thereafter. Medium priority sites are to be inspected every two years and low priority sites, once per permit cycle. Increased inspections are required where violations are noted. Adequate enforcement authority to levy fines, require bonds, or deny/revoke permits.

Monitoring Requirements The permittees have, over the past 10 years, amassed a great deal of water quality data, especially in conjunction with Public Health and Orange County Sanitation District monitoring. The current water quality monitoring plan focuses on regional warm spots and areas of critical aquatic habitat. The current water quality monitoring plan was updated in 1999 and was due to be revised by 2003, that date has been moved up to July 1, 2002.

Monitoring Requirements (cont.) The revised plan will again take a county-wide look at water quality issues and will include: –Mass emissions monitoring, –Estuary/wetland monitoring, –Water column toxicity monitoring, –Bacteriological/pathogen monitoring, –Bioassessment (with SCCWRP), –Reconnaissance for illicit discharges, –Land use correlations, and –TMDL/303(d) listed waterbody monitoring.

Major Differences with Region 9s Draft Orange County Permit In discharge prohibitions, there is a list on non-storm water discharges which are not prohibited. Region 8 allows the Executive Officer to add or remove categories from this list. Region 9 has removed the requirement that storm water discharges to the MS4 meet MEP. For illicit connections, Region 8 requires elimination or permitting of such connections within 120 days, Region 9 requires immediate elimination.

Major Differences (cont.) Region 8 includes litter, debris and trash control requirements, Region 9 does not. Region 8 references requirements and commitments in the Orange County DAMP, Region 9 requires the preparation of a Jurisdictional Urban Runoff Management Plan (URMP). For public education, Region 8 sets a timeline for the program. Region 9 has no timeline, but specifies additional target groups.

Major Differences (cont.) For industrial inspections, Region 8 mandates that facilities under the General Permit be considered high priority. Region 9 requires the permittees to designate a set of minimum BMPs for high, medium, and low priority sites. For construction inspections of high priority sites, during the wet season, Region 8 requires monthly inspections unless violations are noted. Region 9 requires weekly inspections unless permittees certify that site is in compliance.

Anticipated Changes to the September 12, 2001 Draft Finding 5 will include the Anaheim Lake system. Staff will review the definition listed for BMP in footnote 1 (Finding 9A). Staff will review the definition listed for MEP in footnote 2 (Finding 21). Staff will review Orange Countys contention that Section A.2 does not belong in Section XII, New Development. The word model will be removed from Section XII.B, New Development.

Anticipated Changes (cont.) Section XII.B.2.b (WQMP for Urban Runoff) states that The discharge of any listed pollutant in levels exceeding pre-development levels is prohibited to impaired waterbodies on the 303(d) list will be changed to The discharge of any listed pollutant to an impaired waterbody on the 303(d) list shall not cause or contribute to an exceedance of receiving water quality objectives. The second sentence in that section, This requirement may be met by maintaining the total load of the listed pollutant to pre-development levelswill be deleted

Anticipated Changes (cont.) In Section XVI.1 and 2 (Sub-Watersheds and TDML Implementation), the phrase to maximum extent practicable, will be removed from the requirement that the permittees meet TMDL target load allocations. The Fact Sheet will be reviewed and any discrepancies will be corrected to bring it in line with with Permit itself.

Discharge of Storm Water Into the MS4 Phase II Final Rule NPDES storm water regulations states that The operators of regulated small MS4s cannot passively receive and discharge pollutants from third parties. 40 CFR (d)(2)(i) requires municipal permittees to control the contribution to the MS4 by storm water associated with industrial activity.

Municipal Inspections of Facilities Under NPDES Permits 40 CFR (d)(2)(i) requires municipal permittees to control the contribution to the MS4 by storm water associated with industrial activity, control the discharge to the MS4 of materials other than storm water, and requires that they carry out all inspection, surveillance, and monitoring procedures necessary to determine compliance and non-compliance. US EPA agrees that the storm water regulations envision a cooperative effort on the part of the State and municipalities in implementing the industrial storm water program.

Municipal Inspections of Facilities Under NPDES Permits (cont.) In a 12/19/00 letter to the Los Angeles Region, US EPA notes that while the 1996 MS4 permit for Los Angeles required educational visits by MS4 personnel to assist industrial/commercial facilities in complying with local ordinances and prohibition, the current draft L.A. permit should require implementation of an effective enforcement program.

Next Steps Staff is has set a deadline of October 3, 2001 at 5:00 p.m. for submittal of written comments. This will provide time for those comments to be considered and incorporated, as appropriate, in the draft to be distributed and posted on October 12, The October 12, 2001 draft will then be proposed for adoption at the October 26, 2001 Public Hearing, to be held at the City Council Chambers of Corona.