Layout and Flow.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

1
Job Order Costing Chapter 4.
Flexible Budgets, Variances, and Management Control: II
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Cost Behavior, Operating Leverage, and Profitability Analysis
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
Writing Pseudocode And Making a Flow Chart A Number Guessing Game
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Create an Application Title 1A - Adult Chapter 3.
You will have fifteen seconds to answer each question using your resource booklet. There are fifty questions. Though it has little to do with the Apprentice,
ACC 3200 Chapter 3: Process Costing Process Costing.
Vocabulaire 3.3 Français II. 2 Do you have a gift idea for ___?
Chapter 5 Product and Service Costing: Job-Order System
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Job Order and Process Costing
Financial and Managerial Accounting
Break Time Remaining 10:00.
1 Room Planning Service Area.
Red Tag Date 13/12/11 5S.
PP Test Review Sections 6-1 to 6-6
An Application of Linear Programming Lesson 12 The Transportation Model.
Chi-Square and Analysis of Variance (ANOVA)
Chapter 5 Capacity Planning.
Strategic Capacity Planning
Capacity Planning For Products and Services
Capacity Planning For Products and Services
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter Eleven Cost Behavior, Operating Leverage, and CVP Analysis.
Developing a Project Plan CHAPTER SIX Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Developing the Project Plan
Project Scheduling: Lagging, Crashing, and Activity Networks
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
Adding Up In Chunks.
Mrs. Rivas International Studies Charter School. Worksheet Practice 7-1 to 7-5Section 7-1 Algebra Solve each proportion.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
Subtraction: Adding UP
Flexible Budgets and Performance Analysis
Analyzing Genes and Genomes
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
3 - 1 Copyright McGraw-Hill/Irwin, 2005 Markets Demand Defined Demand Graphed Changes in Demand Supply Defined Supply Graphed Changes in Supply Equilibrium.
Process Selection and Facility Layout
Slack, Chambers and Johnston, Operations Management 5 th Edition © Nigel Slack, Stuart Chambers, and Robert Johnston 2007 Chapter 4 Process design Source:
Operations Management
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Lesson 3 Layout & Flow. Sandwich making  'If you were making a sandwich for a friend how would you do it?  'If you were making sandwiches for a whole.
Chapter 4 Process Design.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 8 Facility Layout.
CHAPTER 07 SUMMARY LAYOUT AND FLOW. LAYOUT Layout means the master plan. Definition of layout: Layout is the location of transforming resources. Why layout.
Facilities Planning and Design Course code:
Presentation transcript:

Layout and Flow

Chapter coverage Basic layout types Selecting a layout type Detailed design of a layout

Layout: The layout of an operation is concerned with the physical location of its transforming resources, that is deciding where to put the facilities, machines, equipment and staff in the operation. Layout types: Fixed position layout Process layout Cell layout Product layout

Fixed position layout In a fixed position layout, the transformed resource does not move between its transforming resources. Equipment, machinery, plant and people who do the processing move as necessary because the product or customer is either: Too large Too delicate or Objects being moved

Process layout In a process layout, similar processes or processes with similar needs are located together because: It is convenient to group them together or The utilization of the transforming resource is improved Different products of customer have different requirements therefore they may take different routes within the process. The flow in a process layout can be very complex.

An example of a process layout in a library showing the path of just one customer Entrance Exit On-line and CD-ROM access room Loan books in subject order Enquiries Store room Counter staff Copying area Company reports To journal sack Current journals Reserve collection Reference section Study desks 9

Cell layout In a cell layout, the transformed resources entering the operation move into a cell in which all the transforming resources it requires in located. After being processed in the cell, the transformed resource may move to a different cell in the operation or it may be a finished product or service. Each cell may be arranged in either a process or product layout. The cell type layout attempts to bring order to the complex flow seen in a process layout.

Confectionery, newspaper, magazines and stationery The ground floor plan of a department store showing the sports goods shop-within-a-shop retail ‘cell’ Sports shop Menswear Women’s clothes Luggage and gifts Confectionery, newspaper, magazines and stationery Books and videos Footwear Perfume & jewellery Elevators Entrance 9

Product layout In a product layout, the transformed resource flow a long a line of processes that has been prearranged. Flow is clear, predictable and easy to control.

An army induction centre with uses product layout Waiting area Waiting area Lecture theatre Blood test Doctor Doctor X-ray Record personal history and medical details Uniform issuing area Blood test Doctor Doctor X-ray Blood test Doctor Doctor Uniform store X-ray 9

A restaurant complex with all four basic layout types Fixed-position layout service restaurant Cell layout buffet Line layout cafeteria Cool room Freezer Vegetable prep Grill Preparation Oven Process layout kitchen Main course buffet Starter buffet Desert buffet Service line 9

Volume-variety relationship Fixed-position layout Product layout Cell layout Process layout Volume Low High Variety Flow is intermittent Regular flow more important Flow becomes continuous Regular flow more feasible

Layout selection steps Project process Jobbing process Batch process Mass process Continuous process Professional services Service shops Mass services Fixed position layout Process layout Cell layout Product layout The physical position of all transforming resources The flow of the operation’s transformed resources Process type Basic layout type Detailed design of layout Volume and variety Strategic performance objectives Decision 1 Decision 2 Decision 3

Selecting a layout type

1) The nature of the basic layout types Manufacturing B asic layout Service process types types process types Project processes Project processes Fixed Professional position layout services Jobbing processes Process layout Service shops Batch pro cesses Cell layout Mass processes Mass services Product layout Continuous processes

2) Advantages and disadvantages Fixed Process Cell Product - Very high mix and product flexibility position - High mix and product flexibility - Good compromise between cost and flexibility Lo- w unit costs for high volume layout layout layout layout - Product/customer not moved or disturbed. - Relatively robust if in the case of disruptions - Fast throughput. - Gives Opportunities for specialization of equipment Advantages - High variety of tasks for staff - Easy supervision of equipment of plant - Group work can result in good motivation - Gives Opportunities for specialization of equipment Low utilization of resources. Can be costly to rearrange existing layout Can have low mix and flexibility - Very high unit cost. Can have very high WIP Disadvantages Can need more plant and equipment Not very robust to disruption - Scheduling space and activities can be difficult. Complex flow. Work can be very repetitive.

Use fixed-position or process Use process or cell or product (a) The basic layout types have different fixed and variable cost characteristics which seem to determine which one to use. (b) In practice the uncertainty about the exact fixed and variable costs of each layout means the decision can rarely be made on cost alone Use fixed-position Use fixed-position or process Use process Use process or cell Use process or cell or product Use cell or product Use product Volume Costs Fixed-position Process Cell Product Use cell (a) (b) ? 3) Consider total cost 9

Detailed design of a layout

Fixed position layout design: The location of resources for each project is unique and it will be determined on the convenience of transforming resources themselves. Although there are techniques which held to locate resources on fixed position layouts, they are not widely used because this layout can be very complex and planned schedules do change frequently.

Process layout design: When cost of traveling is important: Collecting information such as: number of loads per day cost per distance traveled When process relationship is important Relationship chart

Collecting information in process layout LOADS/DAY (a) (b) LOADS/DAY If direction is not important, collapses to 9

Collecting information in process layout LOADS/DAY (d) LOADS/DAY A B C D E 30 - 40 80 60 20 Or alternatively 9

Collecting information in process layout LOADS/DAY UNIT COST/DISTANCE TRAVELLED (f) If cost of flow differs between work centers, combine with 9

Collecting information in process layout DAILY COST/DISTANCE TRAVELLED To give 9

Collecting information in process layout (h) DAILY COST/DISTANCE TRAVELLED (i) DAILY COST/DISTANCE TRAVELLED If direction is not important, collapses to 9

A relationship chart DEPARTMENT Metrology E Electronic testing A I Analysis Ultrasonic testing Fatigue testing E I A U O X DEPARTMENT Impact testing 9

Cell layout design Cells in an operation can be created based on two interrelated decisions: What is the extent and nature of the cell i.e. the amount of direct and indirect resources the cell has as shown in Fig 7.28 Which resources to allocate to which cell using: Cluster analysis – which process group naturally together Parts and family coding – based on similar characteristics of parts of products OR Production Flow Analysis (PFA) Examines both product requirement and process grouping (See Fig. 7.31)

Types of cell High e.g. Specialist process Plant-within-a-plant Low Complete component manufacturing cell Lunch and snack produce area in supermarket Small multi-machine Joint reference and copying room in a library Plant-within-a-plant manufacturing operation Maternity unit in a hospital Specialist process Internal audit group in a bank Amount of indirect resources included in the cell Proportion of the resources needed to complete the transformation included in the cell e.g. 9

(a) and (b) Using production flow analysis to allocate machines to cells Cell A Machines Machines Cell B Cell C 9

Product layout design Product type layout is designed based on a technique called line balancing. The technique consist of the following steps: Calculating the required cycle time. Calculating the number of stages. Producing a precedence diagram. Finally allocating activities to the stages.

Cycle time: It is the time between completed products emerging from the process. Example: Suppose the regional back-office operation of a large bank is designing an operation which will process its mortgage applications. The number of applications to be processed is 160 per week and the time available to process the applications is 40 hours per week. Cycle time = 40 = 1/4 hours = 15 minutes 160 1 product every 15 minutes

Number of stages Required no. of stages = total work content required cycle time Where the total work content is the total quantity of work involved in producing the product given in time. Example: Suppose that the bank in the previous example calculated that the average total work content of processing a mortgage application is 60 minutes. The number of stages needed to produce a processed application every 15 minutes can be calculated Required no. of stages = 60 minutes = 4 stages 15 minutes If you get a fraction round it up to the higher whole number.

Precedence diagram This is a diagram representing the ordering of the elements which comprise the total work content of the product or service. Two rules when constructing the diagram: The circles which represent the elements are drawn as far to the left as possible. None of the arrows which shows the precedence of the elements should be vertical. a b c d e f g h i 0.12 mins 0.30 mins 0.36 mins 0.25 mins 0.05 mins 0.17 mins 0.10 mins 0.08 mins

Allocating activities to the stages The general approach is to allocate elements from the precedence diagram to the first stage, starting from the left, until the work allocated to the stage is as close to, but less than, the cycle time. When the stage is full of work without exceeding the cycle time, move to the next stage. Two rules help to decide which activities to allocate to a stage: Choose the largest that will fit into the time remaining at the stage Choose the element with the most ‘followers’.

Balancing loss The effectiveness of the line balancing activity is measured by the balancing loss. This is the time wasted through the unequal allocation of work as a percentage of the total time invested in processing the product or service. Balancing loss = Total idle time No. of stages x Cycle time

Balancing loss is that proportion of the time invested in processing the product or service which is not used productively Load Stage Cycle time = 2.5 mins Cycle time = 3.0 mins 2.3 2.5 2.2 3.0 An ideal ‘balance’ where work is allocated equally between the stages But if work is not equally allocated the cycle time will increase and ‘balancing losses’ will occur Work allocated to stage Idle time Calculating balancing loss: Idle time every cycle =(3.0 - 2.3) + (3.0 - 2.5) + (3.0 - 2.2) = 2.0 mins Balancing loss = 2 4 x 3.0 = 0.1667 = 16.67% 9

Worked Example Consider Karlstad Kakes, a manufacturer of specialty cakes, which has recently obtained contract to supply a major supermarket chain with a specialty cake in the shape of a space rocket. It has been decided that the volumes required by the supermarket warrant a special production line to perform the finishing, decorating and packing of the cake. This line would have to carry out the elements shown in the next slide, which also shows the precedence diagram for the total job. The initial order from the supermarket is for 5000 cakes a week and the number of hours worked by the factory is 40 per week. From this: The required cycle time = 40 hrs x 60 mins = 0.48 mins 5000 The required number of stages = 1.68 mins (total work content) 0.48 mins (required cycle time) = 3.5 stages

Element listing and precedence diagram for Karlstad Kates Element - - De-tin and trim 0.12 mins a Element - Reshape with off-cuts 0.30 mins b Element - Clad in almond fondant 0.36 mins c Element - Clad in white fondant 0.25 mins d Element - Decorate, red icing 0.17 mins e Element - Decorate, green icing 0.05 mins f Element - Decorate, blue icing 0.10 mins g Element - Affix transfers 0.08 mins h Element - Transfer to base and pack 0.25 mins i Total work content = 1.68 mins 0.12 mins 0.30 mins 0.36 mins 0.25 mins 0.05 mins 0.17 mins 0.10 mins 0.08 mins 9

Allocation of elements to stages and balancing loss for Karlstad Kates h i 0.12 mins 0.30 mins 0.36 mins 0.25 mins 0.05 mins 0.17 mins 0.10 mins 0.08 mins Stage 1 Stage 2 Stage 3 Stage 4 Cycle time = 0.48 mins Idle time every cycle = (0.48 - 0.42) + (0.48 - 0.36) + (0.48 - 0.42) = 0.24 mins Proportion of idle time per cycle = 0.24 = 12.5% 4 x 0.48 9