OPMA 5364 Project Management Part 4 Starting & Planning a Project

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

Facilitated by Joanne Fraser RiverSystems
Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting your organization’s logo –“View”
Project Management Process. Managing the Information Systems Project Focus of project management To ensure that information system projects meet customer.
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
3-1 Planning the Project. 3-2 If a Problem Occurs During a Project Is It Most Likely Due to: 4 A) Poor Execution 4 B Poor Planning.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Project Cost Management Estimation Budget Cost Control
MEM 612 Project Management Chapter 3 Planning the Project.
Modern Systems Analysis and Design Third Edition
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Managing Projects. Contemplative Questions  What does project management entail?  Do I want to be a project manager? What is the nature of the work?
Project Management Session 7
HKU Faculty of Education1 Project planning Seminar 4 BSIM0011 Project Management.
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
Project Management and Scheduling
Advanced Project Management Project Plan Templates
Topic 2- 1ICT 327 Management of IT Projects Semester 1, 2005 Topic 2 Project Planning & Initiation Schwalbe: Chapter 3 Compiled by Diana Adorno and contributions.
Client Logo LEAN ENTERPRISE Implementation Workshop.
Chapter 3 Project Activity and Risk Planning
Chapter 4 Defining the Project.
November 1-4, 2011 Project Scope Document. Facts Creates a common understanding Prepared by team or team contractor Has a lot of detail.
What’s a Project? AD642. Why the Emphasis on Project Management? Copyright 2011 John Wiley & Sons, Inc. 1-2  Many tasks do not fit neatly into business-as-usual.
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Ch. 5: Project Planning Good Quote: Plans are only good intentions unless they immediately degenerate into hard work Lame excuses for not planning: Takes.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
Management & Development of Complex Projects Course Code - 706
OPMA 5364 Project Management Part 0 – Course Overview Dr. Edmund Prater The University of Texas at Arlington.
DEFINING THE PROJECT CHAPTER 4.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Project Management Part 6 Project Control. Part 6 - Project Control2 Topic Outline: Project Control Project control steps Measuring and monitoring system.
Project Life Cycle.
The process of planning projects
1 Advanced Project Management Project Plan Templates Ghazala Amin.
OPMA 5364 Project Management Part 4 Starting & Planning a Project.
Copyright 2009 John Wiley & Sons, Inc. Chapter 6 Project Activity Planning.
Project Management Chapter 3 Project. 6/5/ In Chapter 3: Planning the Project Project plan is a route map from project start to finish. Project.
Develop Project Charter
Project Management Project Planning. PLANNING IN PROJECT ENVIRONMENT Establishing a predetermined course of action within a forecasted environment WHY.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Chapter 3 Managing the Information Systems Project 3.1.
Defining Project Scope Research has demonstrated that a clearly defined project scope is a major component of project success. A clearly defined project.
Managing programs that promote personal effectiveness.
Quick Recap.
Project Management “Project Planning & Scheduling” Lecture 07 Resource Person: M. Adeel Anjum.
Project Management in Practice
SCOPE DEFINITION,VERIFICATION AND CONTROL Ashima Wadhwa.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
Copyright 2012 John Wiley & Sons, Inc. Part II Project Planning.
3-1 Planning the Project Project Plan Project Plan.
Copyright 2015 John Wiley & Sons, Inc. Project Planning Part II.
The Project Management Process Groups
Project Management Part 4 Starting & Planning a Project.
Part II Project Planning.
Project Management Systems
Planning the Project.
Project Management BBA & MBA
Systems Analysis and Design in a Changing World, 4th Edition
Chapter 3 Managing the Information Systems Project
DEFINING THE PROJECT CHAPTER 4.
Project Theory and Application
Project Management Process Groups
P ROJECT M ANAGEMENT Skills.
Modern Systems Analysis and Design Third Edition
Effective Project Management: Traditional, Agile, Extreme
Modern Systems Analysis and Design Third Edition
Presentation transcript:

OPMA 5364 Project Management Part 4 Starting & Planning a Project

Topic Outline: Starting & Planning a Project Project launch meeting Identifying necessary activities Work Breakdown Structure (WBS) Estimating activity durations Identifying necessary resources Project budgeting Top-down vs. bottom-up approaches Project planning exercise Learning curves Project action plan Responsibility chart Interface map Part 4 - Project Planning

Project Launch Meeting PM should first meet with the senior manager who will be responsible for the project. Why? Next, a project launch meeting should be held. What is the purpose of this initial meeting? Who should be invited? What should be the results of this meeting? Part 4 - Project Planning

Project Planning Process Clearly define project objective (scope) Develop a Work Breakdown Structure (WBS) Estimate time needed for each task Determine resources needed for each task Estimate cost needed for each task Develop project schedule and budget (adjust as needed) Part 4 - Project Planning

Part 4 - Project Planning Project Scope A clear project scope definition provides the guidelines that are used to develop your project plan. Project Scope Checklist: Project objectives (purpose, due date, budget) Deliverables (at each major phase of project) Milestones (significant events in the project) Technical requirements Limits and exclusions (who, what, how) Review with customer (agreement on expectations) Example of project scope statement Part 4 - Project Planning

Identifying Necessary Activities Start by identifying major-level activities or tasks Then each major task can be broken down into subtasks Project team members can be responsible for breaking down different major activities Then each subtask is broken down to lower-level tasks, and so on until you have basic work-unit levels (work packages) that will be assigned Result: Work Breakdown Structure (WBS) Part 4 - Project Planning

Part 4 - Project Planning Mind Maps Mind maps are a tool to help identify all the necessary activities in a project It’s a type of brainstorming tool The mind mapping process can bring out more ideas than simply making a list It engages the team and generates enthusiasm It brings out quieter team members Mind mapping can be fast, compared to an outlining or listing approach Part 4 - Project Planning

Mind Map for Project Planning 10K run to raise $50K for homeless shelter Transportation Promotion Prizes/recognition Facilities Safety Refreshments Clean-up Route Registration Part 4 - Project Planning

Part 4 - Project Planning Mind Map for WBS Promotion Investigate past events Interview running club members Print Design To schools To sports retailers Prepare mailing Acquire address lists Mail promo Monitor airings Purchase air time Produce ads TV and radio ads Mailings Flyers Research Distribute Part 4 - Project Planning

Work Breakdown Structure Either shown graphically in a tree structure, or as index numbers listed beside activities Entire project is Level 0; the major-level activities are Level 1; and so on Index numbers identify level of the task in the tree structure WBS # 4.2.5 indicates that the task is at Level 3 (3 decimal places) and is the 5th sub-subtask under the 2nd subtask under the 4th major activity Part 4 - Project Planning

Part 4 - Project Planning WBS Tree Structure Carnival Beth Games Tom Promotion Volunteers Joan Rides Kyle Entertain. Jill Food Bob Newspaper Posters Tickets Mark Grandstand Performers Sound Ben Stage Alan Seating Level 1 2 3 5.1.2 4 5 6 2.1 2.2 2.3 5.1 5.2 5.1.3 5.1.1 Part 4 - Project Planning

Part 4 - Project Planning WBS Activity List WBS Activity Carnival 1 Volunteers 2 Promotion 2.1 Posters 2.2 Newspaper 2.3 Tickets 3 Games 4 Rides 5 Entertainment 5.1 Grandstand 5.1.1 Stage 5.1.2 Sound 5.1.3 Seating 5.2 Performers 6 Food Part 4 - Project Planning

WBS for Promotion Example Level 1 Task Level 2 Tasks Level 3 Tasks 1. Promotion 1.1 Research 1.1.1 Investigate past events 1.1.2 Interview running club members 1.2 TV and radio ads 1.2.1 Produce ads 1.2.2 Purchase air time 1.2.3 Monitor airings 1.3 Mailings 1.3.1 Acquire mailing lists 1.3.2 Prepare mailings 1.3.3 Mail promotional materials 1.4 Flyers 1.4.1 Design flyers 1.4.2 Print 1.4.3 Distribute to schools 1.4.4 Distribute to sports retailers Part 4 - Project Planning

Estimating Activity Durations Two Approaches 1. Bottom-up estimate: Ask the person responsible for each low-level task how long they think it will take. This assumes a given amount of resources. 2. Top-down estimate: Based on the project due date, tell the person responsible for each low-level task how much time they are allotted to do the task. They must then determine how much resources are needed to meet the deadline. Part 4 - Project Planning

Estimating Activity Durations For a given amount of resources, how can you estimate a task duration? use the expert’s best guess (person doing task) use past data, if task has been done before use engineering standards or work standards dissect task into different elements and estimate time needed for each element The task time estimate should reflect the most likely time needed to do the task. Part 4 - Project Planning

Identifying Necessary Resources To complete a task within a given amount of time, what resources will be required? How many and what types of employees What facilities What equipment What materials and supplies What services What information and technologies Part 4 - Project Planning

Top-Down vs. Bottom-Up Budgets Top-Down Budgeting: Senior management decides how much they think the project should cost, and that becomes the total project budget. The budget is then divided among the activities. Advantages and disadvantages? Bottom-Up Budgeting: Cost estimates for each task are solicited from those responsible for the tasks. These estimates are rolled up for all activities to get the total project budget. Part 4 - Project Planning

Estimating Activity Costs Estimates for both time and cost of activities should be done with same approach, either top-down or bottom-up (or somewhere in between) Two initial budget estimates may be developed for some projects, a top-down and a bottom-up. Which will most likely be higher? Why? The project manager must then negotiate with senior management to finalize the budget Tradeoffs may be necessary between the cost, due date, and the extent and quality of outputs Part 4 - Project Planning

Part 4 - Project Planning Baseline Plan The finalized budget, time estimates, and resulting project schedule are the basis for the baseline plan. The baseline plan lays out the target levels of progress and performance at the outset of the project execution phase. It is the basis for assessing project performance throughout the project Project tracking utilizes the baseline plan to provide the project manager with a control tool Part 4 - Project Planning

Project Planning Exercise Coffee House Implementation Project Divide into small groups Your group has decided to form a partnership and open a new coffee house in an old restaurant building in downtown Fort Worth . The project starts now and ends in 12 weeks when the coffee house opens for business. Assignment: (40 minutes) Develop a list of necessary activities (use mind map) Estimate the duration of each activity Decide what resources are needed for each activity Estimate the budget to start the new coffee house Part 4 - Project Planning

Part 4 - Project Planning Project Action Plan For each activity, action plan should at least show Activity name Time duration estimate Start date Immediate predecessor activity Resources needed Optionally, it might also show finish date, WBS index, cost, slack time, latest finish date, etc. Part 4 - Project Planning

Action Plan in Microsoft Project ID Task Name Duration Start Finish Predec. Resourc 1 Proj. approval 0 days 3/1/04 2 Script writing 14 days 3/19/04 SW 3 Sched. shoots 17 days 3/24/04 C,P,S 4 Script approval 8 days 3/31/04 C,P 5 Revise script 5 days 4/7/04 P,SW 6 Shooting 10 days 4/21/04 3,5 P,S,SW 7 Editing 7 days 4/30/04 E,ER 8 Final approval 2 days 5/4/04 C,P,E 9 Deliver to client C=client, E=editor, ER=editing room, P=producer, S=secretary, SW=scriptwriter Part 4 - Project Planning

Part 4 - Project Planning Learning Curves What is the learning phenomenon? Under what circumstances is worker learning important to consider and plan for? How does the learning curve phenomenon affect budgeting? How are task durations estimated when worker learning is relevant? Part 4 - Project Planning

Task Times With Learning Time to produce nth unit with 85% learning: Unit# Time 1 43 2 4 8 16 Part 4 - Project Planning

Learning Curve Formula Time to produce the nth unit, learning rate LR: Tn = T1(n)r where r = (log LR)/(log 2) or r = (ln LR)/(ln 2) So, the 8th unit with 85% learning & T1=43: r = (ln 0.85)/(ln 2) = T8 = T1(n)r = 43(8)-0.2345 = Part 4 - Project Planning

Part 4 - Project Planning Learning Curve Tables Time to produce 8th unit: T8 = T1*(unit time factor from table) T8 = Total time to produce first 8 units: T1-8 = T1*(total time factor from table) T1-8 = Part 4 - Project Planning

Part 4 - Project Planning Example Situation A firm has a project to produce 21 units of a new part for a customer. The firm’s typical learning rate is 85%. The first unit of the part that was produced (the prototype) required 43 hours to make. Labor cost is $27 per hour. Pricing policy is 3 times the total labor cost. How much should customer be charged? Part 4 - Project Planning

Part 4 - Project Planning Learning Curve Tables How much should firm charge for job? T1-21 = What if customer wants 4 additional units? Part 4 - Project Planning

Part 4 - Project Planning Learning Curve Tables T1-25 = T22-25 = T1-25 – T1-21 = price for #22-25 or Do learning curves help justify volume discounts? Part 4 - Project Planning

Project Charter (or Project Master Plan) Agreed-upon, legally binding project plan (the final plan) Overview Objectives General approach Contractual aspects Schedules Resources and budgets Personnel Evaluation methods Potential problems Part 4 - Project Planning

Part 4 - Project Planning Project Charter Overview Intended for senior management Brief description of project & deliverables List of major milestones Likely profitability & competitive impacts Objectives Purpose of project More detailed description of deliverables Could be in the form of a project mission statement Part 4 - Project Planning

Part 4 - Project Planning Project Charter General Approach Technical and managerial approaches Relationship with other projects Contractual Aspects Description of all agreements (client, others) Reporting requirements, technical specs, delivery dates, penalties, process for changes Part 4 - Project Planning

Part 4 - Project Planning Project Charter Schedules Outline of all schedules and milestones Project action plan, WBS Resource Requirements All capital and operating expenses Cost monitoring and control procedures Part 4 - Project Planning

Part 4 - Project Planning Project Charter Personnel What types of personnel are needed and when Skill requirements, necessary training, security clearances, nondisclosure agreements Evaluation Methods Descriptions of all procedures and standards for evaluating project—how information will be collected, stored, monitored Part 4 - Project Planning

Part 4 - Project Planning Project Charter Potential Problems List of potential risks to project progress Contingency planning may prevent or soften the impacts of some problems Small or routine projects may not need all 9 of these elements in the project charter, but larger projects should have them. Part 4 - Project Planning

Part 4 - Project Planning Responsibility Chart Often called Linear Responsibility Chart or Responsibility Matrix Shows who has primary responsibility for each task Can also show who provides support, who must be notified upon completion, who must give final approval, who is the backup person, etc. It lets everyone see their roles throughout the project Part 4 - Project Planning

Responsibility Chart WBS Activity Beth Joan Bob Mark Tom Kyle Jill Alan Ben Carnival P S 1 Volunteers 2 Promotion 2.1 Posters 2.2 Newspaper 2.3 Tickets 3 Games 4 Rides 5 Entertainment 5.1 Grandstand 5.1.1 Stage 5.1.2 Sound 5.1.3 Seating 5.2 Performers 6 Food P = Primary responsibility; S = Support responsibility Part 4 - Project Planning

Part 4 - Project Planning Interface Map Shows who each person or department must interface with and why Shows participants how they fit in with other parts of the project Facilitates coordination Allows for early identification of potentially troublesome interfaces (personality clashes) New interface maps can be developed for different phases of the project Part 4 - Project Planning

Part 4 - Project Planning Interface Map Adapted from: Bailetti, Callahan, and Di-Pietro, Nov. 1994, IEEE Transactions on Engineering Management Program manager Project Chip Manufacturing Process technology Cell library group Design team Layout specialist schedule Technical overview Test vectors file Cell library specification design High level Schematic Netlist Verification plan Simulation prelayout postlayout Review Use Create contribute Part 4 - Project Planning