TB-2006 Feb.23Marc Tavlet / Alice GLIMOS Fire Detection and Fire Fighting in ALICE Smoke detection in UX cavern and Counting Rooms in PX Alarms sent to.

Slides:



Advertisements
Similar presentations
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advertisements

Fill in missing numbers or operations
Advanced Piloting Cruise Plot.
Kapitel 21 Astronomie Autor: Bennett et al. Galaxienentwicklung Kapitel 21 Galaxienentwicklung © Pearson Studium 2010 Folie: 1.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
ALGEBRA Number Walls
Jeopardy General Compare & Order AdditionSubtraction Vocabulary Q $100 Q $200 Q $300 Q $400 Q $500 Q $100 Q $200 Q $300 Q $400 Q $500 Final Jeopardy.
1 Covalent bonds l Nonmetals hold onto their valence electrons. l They cant give away electrons to bond. l Still want noble gas configuration. l Get it.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt ShapesPatterns Counting Number.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
André Augustinus 22 June 2004 DCS Workshop Status on services controls.
NEW APPROACH TO THE MUON g2 AND EDM EXPERIMENT AT J-PARC
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
ABC Technology Project
Comments on the gas system Issues of scale What gas mix? Summary Karol Lang The University of Texas at Austin NuMI Off-axis Experiment Detector Workshop.
VOORBLAD.
Squares and Square Root WALK. Solve each problem REVIEW:
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
Equal or Not. Equal or Not
1 Atlantic Annual Viewing Trends Adults 35-54, Total TV, By Daypart Average Minute Audience (000) Average Weekly Reach (%) Average Weekly Hours Viewed.
Slide 1 of 29 Community news Slide 2 of 29 Nouvelles de la communauté…
We will resume in: 25 Minutes.
A SMALL TRUTH TO MAKE LIFE 100%
PSSA Preparation.
TASK: Skill Development A proportional relationship is a set of equivalent ratios. Equivalent ratios have equal values using different numbers. Creating.
Hydronic Balancing Balancing Valves
Circulation Review. 1. These are the lower compartments of the heart.
Chapter 30 Induction and Inductance In this chapter we will study the following topics: -Faraday’s law of induction -Lenz’s rule -Electric field induced.
Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
André Augustinus 16 June 2003 DCS Workshop Safety.
31/03/11FV 1 CEDAR from flammable gas safety point of view.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
May Exp-Area meeting1 Safety Systems Installation status Flammable Gas Detection System Fire Detection System in SG8 ODH Detection System CO2 Detection.
TC meeting P2 planning wks 7&8 A.Tauro
GIF++ gas systems 21/01/2014Ernesto, Roberto PH-DT-DI gas service1.
André Augustinus 16 September 2002 Safety issues.
J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D. J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D SAFETY J.Pothier (GLIMOS) C.Schäfer (deputy GLIMOS) DISMANTLING.
André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.
LHC Fire & Gas Detection Rui Nunes ST/AA/AS. Rui Nunes ST/AA/AS - STTC 21 Feb 2000 Project Goals Install in LHC –Fire Detection –Flammable Gas Detection.
Eric Thomas - Safety systems for LHC experiments 1 Safety Systems for LHC experiments Baseline specifications – Additional needs – Actions taken.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
1/6 ALICE GLIMOS, Marc Tavlet Hazards and Safety in ALICE - Ways to reduce the risks Presentation at the ALICE Club, Monday, December 1 st, 2003 by Marc.
Associated detection/extinction systems D. Swoboda.
Marc Tavlet - GLIMOS1 Paperwork needed to come and work at CERN 1. Access Rights – Registration 2. Tests with Beams 3. Safety Procedures to work at Point-2.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
March 8, 2006Exp. Area Meeting - E. Thomas1 Oxygen Deficiency Hazards Detection System in UX85 Two risks – Two systems 1.Top : He leaks 2.Bottom : CF4.
Review of Safety Systems for the LHC Experiments & Experimental Areas Emmanuel Tsesmelis / TS-LEA LEMIC 20 March 2007.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
LHCb Install Meeting - 12 / 05 / 2004 Paolo Guglielmini - TS / CV LHCb Cooling of the sub – detectors INNER TRACKER TRACKER TRIGGER RICH 1 RICH 2 Status.
GIF++ gas system Outline:  Beam and cosmic trigger  Gas distribution panels  Gas detection (present and final layout)  Conclusions 14/1/2015R. Guida,
LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures.
TC meeting P2 planning wks 3&4 A.Tauro
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
Some arrangements for personnel safety 1- Procedures for access
Safety Systems for ALICE
M.Tavlet, H.Taureg - ALICE
Presentation transcript:

TB-2006 Feb.23Marc Tavlet / Alice GLIMOS Fire Detection and Fire Fighting in ALICE Smoke detection in UX cavern and Counting Rooms in PX Alarms sent to CSAM (+ DCS for info) SNIFFER system in the experimental apparatus Alarms sent to CSAM + DCS for info and action Automatic fire fighting in the ITS volume by means of N 2 flush Automatic fire fighting in the racks under the Muon-arm by means of CO 2 flush

TB-2006 Feb.23Marc Tavlet / Alice GLIMOS The SNIFFER Sampling Network Sniffer system to detect – leak of flammable gas – emission of smoke (fire) – lack of oxygen …in the experimental apparatus ! Sniffer racks equipped with pumps and detectors Alarms sent to CSAM + DCS

TB-2006 Feb.23Marc Tavlet / Alice GLIMOS SNIFFER network in L3 Flam.Gas + Smoke Sniffer racks B 18 and B 19 L3 chicane to Muon-arm 12 br. to Back-Fr. 8 br. to HMPID 12 br. to Mini Fr. 2 br. to EMC rail 9 br. to Sp-Fr 2 br. to ITS

TB-2006 Feb.23Marc Tavlet / Alice GLIMOS SNIFFER network in L3 Oxygen-Deficiency Hazard Sniffer racks B 18 and B 19 L3 chicane to Muon-arm 2 branches to lower volume 2 branches to upper volume 2 branches to mid volume

TB-2006 Feb.23Marc Tavlet / Alice GLIMOS SNIFFER network in Muon arm Flam.Gas + Smoke Sniffer racks B 18 and B 19 L3 chicane 2 branches in FASS 4 branches below Trig for gas 4 branches above st. 4, 5 for smoke 4 branches above Trig for smoke 2 branches for St. 3 (in dipole)

TB-2006 Feb.23Marc Tavlet / Alice GLIMOS SNIFFER network in Muon arm Oxygen-Deficiency Hazard Sniffer racks B 18 and B 19 L3 chicane 2 branches in dipole 2 branches in FASS 2 lines point

TB-2006 Feb.23Marc Tavlet / Alice GLIMOS SNIFFER Sampling Network Recapitulation in L3 magnetin Muon armTotal Hazardlinespointslinespointslinespoints Flam. Gas + Smoke Lack of Oxygen Total

TB-2006 Feb.23Marc Tavlet / Alice GLIMOS Tuyaux = NBR Silverpress Diamètres :lignes = 7.5/13.5 mm branches principales = 6/10 branches finales = 4/7 Dans une ligne, toutes les branches doivent avoir la même longueur (+/- 10%) Connecteurs disponibles – Tés et croix SNIFFER Sampling Network Données Techniques

TB-2006 Feb.23Marc Tavlet / Alice GLIMOS Fire fighting in ITS volume by N 2 flush 60 m3 of Ar/N2 mixture at 22.5 bar 8 m3 of N2 at 200 bar 52/54 mm steel pipes to UX-25 via PX-24 Main Valve With padlock 1 st -flush Valve 2 nd -flush Valve Ventil. Unit for ITS Filling from truck to ITS in L3-Magnet

TB-2006 Feb.23Marc Tavlet / Alice GLIMOS Fire fighting in racks, area C by CO 2 flush Area C, below the μ platform is difficult to access. Automatic fire fighting installation with CO 2, Triggered from DCS-DSS. Local alarm (siren) needed before triggering. 1 bottle/rack (L = 80 cm, Ø = 15 cm) Best offer = 1152 CHF/rack (instead of 900) + maintenance for 5y (232 CHF/rack)

TB-2006 Feb.23Marc Tavlet / Alice GLIMOS Summaries of fire detection and fire fighting in ALICE General smoke detection by TS-CSE, OK SNIFFER by TS-CSE EDMS doc for ALICE in preparation Installation by summer 2006 N2 flush in ITS by ALICE + TS-CV EDMS doc in preparation CO2 flush in C-racks by PH-CMM Installation by end 2006