How To Leverage Your Data? Presented by Michel Ruel, Top Control Inc. 1.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Un percorso realizzato da Mario Malizia
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Fill in missing numbers or operations
Operations Management Maintenance and Reliability Chapter 17
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
/4/2010 Box and Whisker Plots Objective: Learn how to read and draw box and whisker plots Starter: Order these numbers.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Duke Power Clean Smokestacks & Mercury Efforts April, 2004.
0 - 0.
1 1  1 =.
1  1 =.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt ShapesPatterns Counting Number.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 10 second questions Numbers and number system Numbers and the number system, fractions, decimals, proportion & probability.
Year 6 mental test 10 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
ZMQS ZMQS
Reference Q-Cells Intersolar CONTENT 2 1. NETWORK OF REFERENCES UNDER MONITORING 2. EXAMPLES OF PERFORMANCE DATA 3. LIVE LOG-IN TO.
Year 6/7 mental test 5 second questions
| Copyright © 2009 Juniper Networks, Inc. | 1 WX Client Rajoo Nagar PLM, WABU.
Lessons Learned from a Low-Slope Roof System LCA Project Dr. James L. Hoff, DBA TEGNOS Research, Inc. Prepared for ASTM E-60 Workshop on.
MA Metal Finishing Forum Tools and Techniques for Optimizing Metal Finishing Process/Environmental MA Metal Finishing Forum Kevin L. Klink, P.E.
2007 Gas & Oil Application Presentation © Copyright Netronics Inc.
Selecting an Advanced Energy Management System May 2007 Chris Greenwell – Director Energy Markets Scott Muench - Manager Technical Sales © 2007 Tridium,
1 Challenge the future Subtitless On Lightweight Design of Submarine Pressure Hulls.
Khaled Mostafa, ABB Electrical Industries, Nov. 2012
5387 Avion Park Drive Highland Heights, Ohio INTUNE v4.4 Demonstration.
Capacity Planning For Products and Services
VOORBLAD.
Effects on UK of Eustatic sea Level rise GIS is used to evaluate flood risk. Insurance companies use GIS models to assess likely impact and consequently.
Squares and Square Root WALK. Solve each problem REVIEW:
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Least Common Multiples and Greatest Common Factors
Panel II Efficient Court Administration SURVEY Commercial Enforcement and Insolvency Systems Legal Vice Presidency The World Bank.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Subtraction: Adding UP
Test B, 100 Subtraction Facts
Januar MDMDFSSMDMDFSSS
Week 1.
Number bonds to 10,
We will resume in: 25 Minutes.
PSSA Preparation.
Weekly Attendance by Class w/e 6 th September 2013.
© 2006, François Brouard Case Real Group François Brouard, DBA, CA January 6, 2006.
VALUE NOW: Using PI Data to Improve and Optimize Process Control John Cunningham The RoviSys Company.
Enhancing Paper Mill Performance through Advanced Diagnostics Services Dr. BS Babji Process Automation Division ABB India Ltd, Bangalore IPPTA Zonal Seminar.
Performance Supervision System
A practical approach for process control optimization during start-up
Presentation transcript:

How To Leverage Your Data? Presented by Michel Ruel, Top Control Inc. 1

Top Control : history – Training, consulting, optimization Offices in USA, Canada Strategic partner of Matrikon Customers in 31 countries 2

Business Problem Processes are not running at their optimum because of underlying control problems Resources dont have the time or tools to diagnose Variability Reduction Potential RPI 3

Tools for Operational Excellence Value added solutions: Alarm management Control performance monitoring Equipment condition monitoring Process performance monitoring Data connectivity Data management Data and process visualization Engineering analysis 4

DataKnowledge Diagnostics Process systems Data AnalysisPerformance Diagnostics Result$ 5

Control Valves, transmitters, sensors PID Control strategies Multivariable Process equipments, pumps, reservoirs… RTO Maintenance Complexity Follow-up effort Calibration, maintenance Configuration, tuning Tuning, modeling Models Qualifications 1, 2…% 1, 2,…% 6

Impacts Time SAVINGS $$$ 7

The reality Numbers from audits, articles and our field experience 20 % Control loops, improper design 30 % Control valve related problems 15 % Not installed properly 30 % Nonsensical tuning parameters 85 % Improper tuning parameters only 25 % give a better performance in automatic control !! 8

Problems: What Could Go Wrong FIC-101 FT-101 Non-linearities Noise Variability Tuning Process design Control design Disturbance Stiction Hysteresis Valve at limit Normal mode? Interactions with other loops Operations: SP, Mode Oscillations In control? Process model Fouling In service? FIC-101 PVCO SP Mode Tuning is only one of the problems… 9

Control Performance Monitoring PI Data SP= 249 PSI PV= 247 PSI CO=36% Mode=Casc CPM server Results and Diagnostics TreeMap Prioritized lists KPIs Indices Work Order Web and Intranet Maintenance system (SAP, Maximo, …) Remote support 4 signals Crunching numbers Management Production Operation Engineering Maintenance 10

11

12

Expected Results Variability: ÷ 2 Cycling: removed Valve travel: ÷ 5 (valve wear 2 ) Robustness:X 2 Performance:X 2 Quality: Efficiency: Throughput : Energy: Maintenance costs: MPC deployment, re-testing: 30% 1 to 5% 1 to 10% 30% 70% Service factor Tuning Repair Review control strategies Optimize 13

Expected Benefits of Optimization Increase process performance Use resources (human & material) wisely Reduced energy costs Reduced waste Reduced variability Reduced valve maintenance Reduced pollution Cycling removed Increased up-time Improved product quality Improved efficiency Better operation Improved safety Smoother start-up 14

Conclusions 1-Usage2-Stability3-Performance Resources are used where they are really needed Process control systems are used to their full potential Operation and production are optimal Maintenance and engineering are efficiently used. 15

Boiler 3, November 2007 vs April 2008 November 2007April sticky valvesNone 16

November 2007 vs April 2008 November2007Mapril

An example at White Birch: PIC 1900 (tuning parameters adapted to load) February June times better 18

Steam cost over 6 months 19

Small Gestures That Count! Actions – Daily – Weekly – Monthly – Yearly Workflow, procedures What can be automated? How can the process be sustained? How can optimization be optimized? 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Time % Interest 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Time % Support 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Time % Regularity Succes$ Result$ New$ 20

Thank You Michel Ruel President Top Control Inc (877)