Funding for Fixed Research Equipment and Systems

Slides:



Advertisements
Similar presentations
The Pay Me Game.
Advertisements

TEA Facilities Standards
Presented by: Rod Meredith Assistant Director Public Works Riley County, KS Matthew Leaper Business Development Manager Johnson Controls, Inc. IMPLEMENTING.
Technology, Energy Efficiency & Renewable Energy for Emission Reduction John Morrison and Ward Lenz Advanced Energy April 20, 2004.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District July 21, 2008 BUILDING TOMORROW TODAY 1.
Emerson in the Energy Sector Stephen C. Hassell President, Avocent 17 August 2012.
SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
Work Improvement in Small Enterprises (WISE): good examples from Asia [CD-ROM] [Publications] Compilation of PowerPoint presentations on: 1) Work station.
Energy Efficient Heating Ventilating and Air Conditioning.
Exploring Energy Management
Fullerton College Bond Fund Projects Update Fullerton College Athletics Project Scope Overview Schedule Parking.
June Energy consumption in Korea 4 primary & final energy consumption CO 2 emissions LNG Nuclear Renewables, etc Oil Coal Energy Industrial.
UNIVERSITY OF ALASKA FAIRBANKS Capital Projects Update Admin Services Open Forum October 11, 2011.
© 2007 IBM Corporation Steve Bowden Green Computing CTO IBM Systems & Technology Group UKISA Sustainable Computing in a Carbon Sensitive World Blue turning.
* A chiller capable of producing water temperatures of low 40s on the evaporator side and above 135° on the condenser side.
Jim McElwain College Architect SETTING UP A LABORATORY.
MULTIPLE PROFESSIONAL REVIEWS DOCUMENT SOLUTIONS Architectural and engineering review identifies building code and accessibility repairs needed. ($750,000.
UKSPA Conference 2008 Laboratories for the Future East Midland Conference Centre, University Park, Nottingham Incubator Buildings in Science Parks – special.
KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
Depreciation Report Discussion
1. 2 Earthquake effects on health care facilities 2.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Company Introduction…….
UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
NET ZERO STUDY ON A COMMUNITY COLLEGE By: Amanda OConnell Doenges.
Summer DEPARTMENT ORGANIZATION Capital Improvement Program Capital Improvement Program Maintenance Custodial Environmental Management 2.3 millionsquare.
Cost Total cost is up to $8,645,000 $500,000 from Capital Reserve Fund $8.145 million bond for the balance.
Program Overview February 25, Program Summary Approximately $14M in incentives per year Cap for Large Customers: $300,000 per year Prescriptive.
NCAT- Butte 3040 Continental Drive P.O. Box 3838 Butte, MT Pursuing Energy Conservation Opportunities in YOUR School.
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
Energy Savings Impacts of the Advanced Energy Design Guide: Small Office Buildings Bing Liu, P.E. Research Engineer Pacific Northwest National Laboratory.
Chomp Down on Energy PUT OFFICE/GREEN TEAM INFO HERE.
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
Making Landmark or Friendly Numbers (Multiplication)
“Children First!” ENCINITAS UNION SCHOOL DISTRICT “Children First!” PROPOSITION P.
WELCOME to JBT Food Tech presentation Food Town Concept Bulgaria
Or... What happens when Sponge Bob meets Bob the Builder??? 1.
Chapter 11 Using Energy.
Cost-Revenue Analysis for Decision Making
ORGANIZATION, TERMINOLOGY, AND FUNDS FLOW
Utility Management Providence Health System - Oregon Environment of Care.
April 23, 2015Committee for Sustainability Building Systems and Energy Use Drexel University April 24, 2008.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
INTD 51 human environments building systems. heating/ventilation/air-conditioning (HVAC) maintain a comfortable indoor climate control temperature and.
LOCAL ASSISTANCE 5 – YEAR PLAN Facilities Department Mark Thissell.
Engineering Controls and Laboratory Design Session 4 Laboratory Safety Training.
Furniture, Fixtures and Equipment Guidance Document CLC-9 April 2014 for State Operated Campuses 1.
Texas Department of Insurance State Fire Marshall’s Office Sixth Report on State University Fire Safety January 2002.
Chemical Fume Hood  A type of local ventilation device that is designed to limit the user's exposure to hazardous or noxious fumes, vapors or dusts.
Facilities—Physical Plant Operations How to get what you need. Who pays for what services?
GUHSD CITIZENS COMMUNITY MEETING MARCH 24-26, 2015 Facilities and Capital Budget Overview This Presentation Will Be Posted On Our Website:
Facilities Maintenance Department LtCol Todd A. Kerzie Facilities Maintenance Officer (760) 725 – 3807 Mr. Jeff Hunt Maintenance Control Director Marine.
Section B Inventory Process and Forms. General Inventory Actions %Getting Started Set inventory goals and objectives %Who District Program Manager Site.
7 Facility Systems Facility Systems chapter 7 chapter
HISTORICAL INFORMATION Professional Staff at Peak of Enrollment 1 Superintendent 1 Assistant Superintendent 1 Director of Secondary Education.
High School Task Force DECATUR PUBLIC SCHOOLS 02/03/2009.
AIA Guidelines for Design and Construction of Hospital and Healthcare Facilities Presented By: Michael A. Rogers, PE
Lab design Assignment 3 Unit 2.
Energy Huntsville Opportunity Report and Government Collaboration February 2016.
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS High School Building Project.
Office of Facilities & Property Management STEPHEN SALBER, DIRECTOR.
FACILITIES SERVICES NEW EMPLOYEE ORIENTATION. FUNCTION OF FACILITIES SERVICES  Facilities Services has 55 full time employees who are responsible for.
Capital Projects Requests
Earthquake effects on health care facilities
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
INNOVATION lab MEP MECHANICAL/ELECTRICAL/PLUMBING :
Carleton College Facilities Management
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Step 2: COE Phase 1 Building Project: SEC and SLINK
Presentation transcript:

Funding for Fixed Research Equipment and Systems April 2010 Dennis Bailey Associate Vice President for Facilities The Florida State University http://www.facilities.fsu.edu

New Research Facilities 2003 -2009 College of Medicine 299,200 GSF King Life Sciences Building 180,000 Psychology Department Building 176,760 Research Buildings A & B 174,800 Chemistry Research Building 161,400 IMB Renovation 51,600 Materials Research Building 47,250 Shaw Bldg Renovation, Innovation Park 14,300 Total Additional GSF 1,105,310

Plant Operations & Maintenance Funding State Appropriated Money For Basic Maintenance and Operation of Educational Facilities Includes Utilities So what’s the problem and why are we talking about this now ?

How P O & M Funding is Determined Step 1 Rate energy consumption: A. Is 70% or more of the GSF of this facility air conditioned? Yes = 1   No = 0                 B. Is the facility being designed or renovated after 1989? Yes = 10 No = 1                   C. % of the Gross Square Footage used for Labs or Research: (Multiply % times 20)     D. % of outside air supplied to the facility:   (Multiply % times 40)     E. Does the facility have a heavy equipment load? Yes = 15 No = 1                    (Computer equipment, research equipment, autoclaves, fume hoods, etc.) F. Is this facility an agricultural or maintenance utility shed? Yes = 5   No = 1                  

Step 2 Plug answers from A – F into this formula to calculate The Total Energy Factor (TEF): TEF = [ 1 + A * (B+C+D+E ÷ 100) ] * F

Step 3 Determine Building Classification Based on Total Energy Factor:   TEF = 1.00 Facility Class A - Low Energy Usage Building A building with less than 70% of the gross square footage receiving conditioned air. TEF = 1.01 to 1.25 Facility Class B - General Office Building A building that typically contains classrooms, offices, and administrative space. X TEF = 1.26 to 1.29 Facility Class C - General Classroom Building A building that typically contains classrooms, offices, administrative and special spaces such as general teaching labs, auditoriums, etc. TEF = 1.30 to 1.49 Facility Class D - Fine Arts, Specialized Use, Student Activities Building A building that typically contains classrooms, offices, auditoriums, general patient care and special support space such as locker rooms, teaching gyms, exercise rooms, studios. TEF = 1.50 to 1.60 Facility Class E - General Science Building A building that typically contains classrooms, offices, wet and dry instructional labs to support general instruction and research. X  TEF = 1.61 to 1.85 Facility Class F - Research, Medical, Advanced Technology Building A building that typically contains classrooms, offices and highly specialized labs supporting upper level undergraduate programs, graduate programs, medical technology and sponsored research efforts. TEF = < 1.00 Facility Class G - Agricultural and Maintenance Support Sheds or Buildings A building that may typically be used for agricultural and maintenance support and contains no air conditioned space and little or no utility usage.

2009-2010 Base Funding Allocation/GSF Step 4 Apply the TEF to: Utilities Consumption Factors Intensity of Use Factors General Classroom Building Research, Medical, Advanced Technology Building 2009-2010 Base Funding Allocation/GSF Building Classification A B C D E F G Utilities Multiplier 0.50 1.00 1.10 1.35 1.85 2.65 $4.45 Intensity of Use 1.000 1.069 1.115 1.140 1.092 1.046 0.500 $4.16 Base funding amount is for new space only. Once funded the rate never changes.

What Does PO&M Funding Cover? Utilities expenses Building structure and envelope (doors, windows, roof, exterior walls, etc.) Heating, ventilation and air conditioning systems Plumbing and mechanical systems Lighting and electrical systems Interior finishes Toilet and general exhaust systems Building control systems (pneumatic and digital) Basic custodial service Grounds maintenance Basic door hardware, repair and replacement Pest control Elevators Emergency egress lighting with power source

What PO&M Funding Does Not Cover Special equipment and systems dedicated to research activities Compressed or specially filtered air systems Vacuum pumps and systems Acid waste systems High purity or process water systems Process cooling or heating systems Fume hoods Cold rooms Process exhaust such as dust collectors, paint or welding booths Autoclaves Etc.

What PO&M Funding Does Not Cover continued Research Equipment Bio-safety cabinets Incubators Freezers, refrigerators, ice machines Chemical sterilizers Chemical storage rooms or cabinets Hazardous material cabinets X-ray machines Spectrometers Movable furniture or custom installed furniture Other departmental equipment Domestic potable water heaters Security systems

What PO&M Funding Does Not Cover continued CCTV systems Data equipment, computers, switches, routers and telecommunications equipment Flood damage caused by departmental equipment or connection to building systems Back up power generators Uninterruptible power supplies Clinical equipment Stages, lifts and related systems Audio/visual equipment Any non-FSU owned equipment, possession, fixtures or items in FSU facilities. This list intended as a guide for funding decisions on maintenance and operating expenditures.

So What? There is no PO&M funding available to pay for repairs and/or replacement of millions of dollars worth of research equipment and systems. What happens when a fan motor goes out on a fume hood? Other funding sources must be identified. There is no plan. We need a plan.