Summary Thursday h21: Stable beams fill #1303.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
LHC progress Report LHCC Wednesday 23 rd March 2011.
● 08h00: Adjust mode for end-of-fill study. Scraping test for determining transverse beam profile (beam 2, vertical). As expected, beam dumped with BLM.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Wednesday
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
Wednesday 8.9 External crossing angles:
LHC Commissioning with Beam
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Saturday 24 March 2012.
Friday 15th June 01:11 Injection.
Wednesday September 14th
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Summary Friday h38: Ramp down and pre-cycle.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
Tuesday TOTEM and transverse loss map (1) OK
Summary of Week 11: 14 – 21 March
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
LHC commissioning Week 38
Summary of Week 16 G. Arduini, J. Wenninger
Wed :40 Lost S78 - QPS controller.
Saturday 2/4/ :00-09:00 Problems with SPS:
Friday March 4th 08h32: Access for beam dump system.
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Week 35 – Technical Stop and Restart
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
Monday February 28th 8h00: Injection
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Friday morning 10:30 Optics measurements and corrections.
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
(on behalf of the LHC team)
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Thursday – Morning Energy matching at injection with H CODs
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
MD Planning Fri – Sat (1. – 2.7.)
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Summary for LPC (March 7th, Ralph Assmann)
Saturday :42 stable beams fill 3541
LHC Morning Meeting - G. Arduini
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Summary Tuesday h23: Machine closed. Precycle started.
Fri :52 Stable beams fill #2536
Thursday 30th September De-bunching test
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Wednesday morning Waiting for PS – problem on RF cavity.
Daniel, Gianluca and Belen (for the Collimator team)
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Summary Thursday 26.8. 04h21: Stable beams fill #1303. Lumi > 1e31 in ATLAS and CMS. Only 47 bunches instead of 50. Last injection per beam not executed due to OP error. Missing buckets: 25081, 26081, 27081 (B1), 22281, 23281, 24281 (B2) 1 RF trip 17h35: Beams dumped with fast beam loss event. Delivered ~380 nb-1 per experiment. 17h40: Ramp down and precycle. Access in Pt 4 ( for QPS problem on worldFIP problem). 8:30 meeting

New Record Lumi 8:30 meeting

Loss Spikes in Stable Beams Intensities Loss at primary collimators B1 8:30 meeting

Loss Spikes in Stable Beams factor ~30 in BLM at TCP not visible in lifetime ~50 h 8:30 meeting

RF Trip: cavity 2B1 8:30 meeting

Instantaneous Luminosity 8:30 meeting

Integrated Luminosity 370 nb-1 over 13 hours. 8:30 meeting

Cause of Beam Dump: Fast Loss in Arc Q25.R5 8:30 meeting

Summary Thursday 26.8. to Friday 21h42: Injection of 1 nominal bunch per beam. 23h08: Ramp, squeeze, collide. Loss maps for collimation monitoring. 01h38: Rampdown and precycle. 03h04: Injection for physics. 04h14: Start ramp. 06h11: Stable beams fill #1305. Initial lumi again above 1e31. What about CMS: 0? DIP still not working for transmitting collimator info!? 8:30 meeting

Loss Map: Example B2 V 8:30 meeting

Loss Map: Example B1 V 8:30 meeting

Stable Beams Fill #1305 8:30 meeting

Program ahead Fri 09h30: Adjust mode. End-of-fill study. Cannot update coordination vistar  connection problem? Fri 09h30: Adjust mode. End-of-fill study. Fri 11h00: Bunch train: Injection, ADT, PLL (450 GeV, 4x1e11) Fri 19h00: Physics 50b x 50b Sat 09h00: Physics continued or bunch train commissioning. Sat 20h00: k-modulation measurement for triplets Sun 04h00: recover for physics. Change LHC-b polarity Mon 06h00: end of beam before technical stop 8:30 meeting

Backup 8:30 meeting

List of Ongoing/Pending Work I Commissioning work for higher intensities: Multi-bunch injection: N bunches per injection, completed for beam1, to be completed for beam2. Transverse damper: Train test with 4 bunches at 150 ns. 1 shift. Adjustments for train. 1 shift. Total: 2 shifts. Multi-bunch studies for RF and BPM's, instrumentation, dump, ... Crossing-angle setup at 450 GeV. Address losses with 100 micro-rad in IP2, goal is 150 micro-rad (full, see w33 Tuesday summary). Check of orbit feedback improvement (minimize energy changing COD trims). Can be parastitic. 2 ramps. PLL commissioning work (better tune feedback with high intensities and damper on): at 450 GeV and later during ramp. 6 times 0.5 shifts. Injection preparation for 12b bunch train injection (injection protection setup). 2 shifts. Injection test for 12b bunch train. 0.5 shifts. Increase of intensity: Increase bunch intensity to 1.1e11. More bunches after 1 week with 48b?  NO. Define plan Agree target crossing angles 8:30 meeting

List of Ongoing/Pending Work II Maintenance of LHC performance & protection: Monitor collimation validity and efficiency (loss maps). 1b of 1e11 per beam. 1.5 shifts. Correct the momentum cleaning for beam 2 (collimator setup IR3). 1b of 1e11 per beam. 1 shift. Test less heavy method for loss maps (blow up selected bunches with transverse damper at end of shift). 1b of 1e11p. 1 hour. BCT response check for different bunch intensities. Parasitic to collimation loss maps. BCT response check for different bunch lengths. 450 GeV. 2 hours. Study and measurements of important LHC parameters: Independent measurement of beta* and beam offsets in triplets: k-modulation. 1b of 1e11 per beam. Not colliding. Change RQTX1/2/3 by +- 0.5 A. Measure after squeeze to 3.5m. 1 shift. Measurement of transverse beam distribution at 3.5 TeV. 8:30 meeting