Multiple Award Construction (4 contracts) 1/5/11-1/5/16 $75M Cum (Contractors: Grimberg; NICC JV. Inc; Meltech; Biscayne) Protective Services Division.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

1
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 116.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 75.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
0 - 0.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Patterns and Sequences
Year 6 mental test 10 second questions
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
ZMQS ZMQS
Photo Slideshow Instructions (delete before presenting or this page will show when slideshow loops) 1.Set PowerPoint to work in Outline. View/Normal click.
Solve Multi-step Equations
Richmond House, Liverpool (1) 26 th January 2004.
Break Time Remaining 10:00.
PP Test Review Sections 6-1 to 6-6
2 |SharePoint Saturday New York City
© S Haughton more than 3?
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Addition 1’s to 20.
25 seconds left…...
Equal or Not. Equal or Not
Slippery Slope
Test B, 100 Subtraction Facts
: 3 00.
5 minutes.
Januar MDMDFSSMDMDFSSS
Week 1.
Analyzing Genes and Genomes
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Clock will move after 1 minute
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Presentation transcript:

Multiple Award Construction (4 contracts) 1/5/11-1/5/16 $75M Cum (Contractors: Grimberg; NICC JV. Inc; Meltech; Biscayne) Protective Services Division 240 MOD/Code 200 Contracts Management Operations Directorate 200 Facilities Mgmt Division 220 Environmental & Medical Division 250 Information & Logistics Mgmt Division 270 Facilities, Construction, Eng & Tech Svcs 4/19/11-4/18/16 $85M A-E Services (3 contracts) 8/10/10-8/9/15 $15M Cum (Tasks w/ construction value of $10M or greater) (Contractors: AECOM; HDR; Smithgroup) A-E Services Re- compete Acquisition strategy to begin 4 th Qtr FY13 FOMS 5/11/10-8/31/12 $48.9M (max) FOMS Re-compete Estimate: Procurement Sensitive Award Expected 7/1/12 Custodial/ Landscape Svcs/ Trash & Recycling 10/1/09-9/30/14 $27.5M ($27M Core/ $500K IDIQ Max) Custodial/ Landscape Svcs/ Trash & Recycling Re-compete Acquisition strategy to begin 1 st Qtr FY13 WFF Protective Services 11/1/07-9/30/12 (9/30/13 if last option exercised) $41M ($38M Core/ $3M IDIQ Max) Protective Services Re-compete Estimate: Procurement Sensitive Award expected 11/28/12 Environmental Services 4/1/10-3/31/15 $20M Environmental Services Re-compete Acquisition Strategy to begin 3 rd Qtr FY13 Health Unit & Fitness Center 10/1/08-9/30/13 $3.6M Health Unit & Fitness Center Re-compete Acquisition Strategy to begin 3 rd Qtr FY12 Library Services 12/29/06-6/30/12 $31.2M (Processing 1-year extension) Library Services Re- compete Estimate: Procurement Sensitive Award expected 4/11/13 Logistics Services 2/1/01-7/31/12 $468M Logistics Services Follow-On 8/1/12 – 9/30/12 (w/ 4 1-yr plus mo options) $436M (includes options but no performance incentive fees) WICC 9/1/01-8/31/12 $222M 6 1-month options available which would extend contract through 2/28/13) WICC Re-compete Estimate: Procurement Sensitive Award expected 2/7/13 A-E Services (4 contracts pending) $15M cum

Facilities Management Division Code 220 Facilities Mgmt Division 220 Facilities, Construction, Eng & Tech Svcs 4/19/11-4/18/16 $85M A-E Services (3 contracts) 8/10/10-8/9/15 $15M Cum (Tasks w/ construction value of $10M or greater) (Contractors: AECOM; HDR; Smithgroup) FOMS 5/11/10-8/31/12 $48.9M (max) Custodial/ Landscape Svcs/ Trash & Recycling 10/9/09-9/30/14 $27.5M ($27M Core/ $500K IDIQ Max) Multiple Award Construction (4 contracts) 1/5/11- 1/5/16 $75M Cum Contractors: Grimberg; NICC JV Inc; Meltech; Biscayne) A-E Services Re- compete Acquisition strategy to begin 4 th Qtr FY13 FOMS Re-compete Estimate: Procurement Sensitive Award Expected 7/1/12 Custodial/ Landscape Svcs/ Trash & Recycling Re-compete Acquisition strategy to begin 1 st Qtr FY13 A-E Services (4 contracts pending) $15M cum

Protective Services Division Code 240 Protective Services 11/1/07-9/30/12 (9/30/13 if last option exercised) $41M ($38M Core/ $3M IDIQ Max) Protective Services Division 240 Protective Services Division 240 Protective Services Re-compete Estimate: Procurement Sensitive Award expected 11/28/12

Medical & Environmental Management Division Code 250 Environmental Services 4/1/10-3/31/15 $20M Health Unit & Fitness Center 10/1/08-9/30/13 $3.6M Medical & Environmental Management Division 250 Medical & Environmental Management Division 250 Health Unit & Fitness Center Re-compete Acquisition Strategy to begin 3 rd Qtr FY12 Environmental Services Re-compete Acquisition Strategy to begin 3 rd Qtr FY13

Information and Logistics Management Division Code 270 Information & Logistics Management Division 270 Information & Logistics Management Division 270 Library Services 12/29/06-6/30/12 $31.2M (Processing 1-year extension) Logistics Services 2/1/01-7/31/12 $468M Logistics Services Follow-On 8/1/12 – 9/30/12 (w/ 4 1-yr plus 1 10-mo options) $436M (includes options but no performance incentive fees) Library Services Re- compete Estimate: Procurement Sensitive Award expected 4/11/13

Wallops Flight Facility WFF WICC 9/1/01-8/31/12 $222M (6 1-month options available which would extend contract through 2/28/13) WICC Re-compete Estimate: Procurement Sensitive Award expected 2/7/13