Draft Decision 2.3/1 (JCOMM-5) Internal and External Review of JCOMM

Slides:



Advertisements
Similar presentations
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Climate & Water Department Side Event I: The Role.
Advertisements

Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW.
World Meteorological OrganizationIntergovernmental Oceanographic Commission of UNESCO SOT Terms of Reference Ship Observations Team ~ integrating and coordinating.
Potential role of WMO in Space Weather Jerome LAFEUILLE WMO Space Programme Office World Meteorological Organization Geneva.
Pierre DANIEL Météo-France Technologies for Search, Assistance and Rescue Brest, France, October 2004 A review of the perspectives presented at.
Recent developments in the UNFCCC process in relation to global observations 4 th GTOS Steering Committee Paris, 1-2 December 2009 Rocio Lichte Programme.
Trade and Environment Capacity-Building WTO Symposium on Trade and Sustainable Development October 2005 Division of Technology, Industry, and Economics.
Surface Transport Service Delivery Dr Tang Xu Director, WDS WMO WMO; Name of Department (ND)
WHAT IT IS HOW IT FUNCTIONS WHAT IT OFFERS. WORLD TOURISM ORGANIZATION WHAT IT IS CREATION : MAY 1975 UNITED NATIONS SPECIALIZED AGENCY: 23 DECEMBER 2003.
STRENGTHENING the AFRICA ENVIRONMENT INFORMATION NETWORK An AMCEN initiative A framework to support development planning processes and increase access.
SWITCH – ASIA POLICY SUPPORT COMPONENT 1. What is about? 2  Create an enabling environment to strengthen or initiate policies helping to mainstream SCP.
World Meteorological Organization Working together in weather, climate and water EC WG-CD Terms of Reference and Review of Cg-XVI and EC-LXIII
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Global Action Plan and its implementation in other regions Meeting for Discussion of the draft Plan for the Implementation of the Global Strategy to Improve.
Review of progress in implementing tasks assigned, impediments to implementation and solutions.
International Fund for Cultural Diversity (IFCD) The IFCD is a multi-donor Fund established under Article 18 of the UNESCO 2005 Convention on the Protection.
MULTILATERAL COOPERATION KEY PERFORMANCE AREAS SA engagement with the UN Implementation of major summits and international conventions relevant to S&T.
Ggim.un.org. The United Nations initiative on Global Geospatial Information Management A formal mechanism under UN protocol to discuss, enhance and coordinate.
PACIFIC AID EFFECTIVENESS PRINCIPLES. Purpose of Presentation Provide an overview of Pacific Principles on Aid Effectiveness Provide an overview of Pacific.
April_2010 Partnering initiatives at country level Proposed partnering process to build a national stop tuberculosis (TB) partnership.
BMH CLINICAL GUIDELINES IN EUROPE. OUTLINE Background to the project Objectives The AGREE Instrument: validation process and results Outcomes.
JOINT FORUM Future Plan for the Joint Activities on Air Pollution in Asia-Pacific CONTENTS 1. Background 2. The First Joint Meeting 3. Future Plan 4. Next.
Introduction to the UNCCD Strategy, new monitoring and assessment system and relevant COP decisions Training of Trainers Rome, 31 May – 4 June 2010.
The Male’ Declaration Proposal for Phase 4 Implementation.
Addressing adaptation under the Convention in a coherent manner Presentation by Juan Hoffmaister Co-Chair, Adaptation Committee.
Public health, innovation and intellectual property 1 |1 | The Global Strategy on Public Health, Innovation and Intellectual Property Technical Briefing.
United Nations IMPROVING GLOBAL ROAD SAFETY Resolution adopted by the General Assembly 106th plenary meeting 19 April 2012.
Development Account: 6th Tranche Strengthening the capacity of National Statistical Offices (NSOs) in the Caribbean Small Island Developing States to fulfill.
13 TH MEETING OF THE GBIF PARTICIPANT NODE MANAGERS COMMITTEE – 6 OCTOBER 2015 Review of regional collaboration Olaf Bánki.
UNGGIM – PRIVATE SECTOR NETWORK. AGENDA > OVERVIEW OF PRIVATE SECTOR >PURPOSE AND VISION OF PRIVATE SECTOR NETWORK > STRUCTURE AND TERMS OF REFERENCE.
Presentation title 9. Defining a country-specific NAP process: rapid stocktaking using a sample NAP process to identify building blocks, workstreams and.
Monitoring Forest Resources for SFM in the UNECE Region
UNCTAD work on consumer protection issues
Building evaluation in the Department of Immigration and Citizenship
The Codex Alimentarius Commission
Introduction to the UNCCD Strategy, new monitoring and assessment system and relevant COP decisions Training of Trainers Rome, 31 May – 4 June 2010.
Implementing the New JCOMM Marine Climate Data System (MCDS)
Institutional Strengthening Support
Activity of the High-Level Group for Partnership, Coordination and Capacity Building for Statistics for Agenda 2030 on Sustainable Development (HLG) Gulmira.
16th Session of RA II (Asia)
Snow Watch Team Terms of Reference
A Short History of JCOMM
Services & Forecast Systems Programme Area Document 5.1 SFSPA Vision
Roadmap to Enhanced Technical Regulations of WMO
9/16/2018 The ACT Government’s commitment to Performance and Accountability – the role of Evaluation Presentation to the Canberra Evaluation Forum Thursday,
Documentation Overview
UN Support to SDG implementation in Seychelles.
IMPROVING JSR PRACTICES AT COUNTRY LEVEL: ACHIEVEMENTS AND GAPS
Item 16.3 Governance review
Advancing South-South Cooperation for Effective Implementation of
Scientific and Operational Context and Requirements for JCOMM Document 4.1 (3) Global Framework for Climate Services Maxx Dilley D/Climate Prediction.
2020 Round of Census in Africa: Progress and Challenges
Peter Mason, CEEMS AG Vice-Chair Guo Su, CEEMS AG Secretariat
Coordinating Operational Oceanography and Marine Meteorology
The role of the ECCP (1) The involvement of all relevant stakeholders – public authorities, economic and social partners and civil society bodies – at.
UN Management Reform: Update
IPET-OPSLS/CCl-17 relevant issues before EC-70
Momade Saide, Ministery of Planning & Development Hanoi, February 2007
Support for SOT Activities
Status and Plan of Regional WIGOS Center (West Asia) in
Scientific and Operational Context and Requirements for JCOMM Doc 3. 1
Introductory Statement by the Chair of COAG
Project overseer Song Yanqin May 11, 2004 Honolulu
Albert Fischer Head, IOC Ocean Observations and Services Section
APEC Project Cycle Overview
UNCTAD-UNECE Workshop - October 2006
UNFCCC Needs-based Finance (NBF) Project
MONITORING PROGRESS ON JOINT EVALUATION AND PARTNER COUNTRY INVOLVEMENT February th meeting.
CONSTITUENT BODY REFORM (CBR)
THE LABOUR ADMINISTRATION AND INSPECTION PROGRAMME LAB/ADMIN
Presentation transcript:

Draft Decision 2.3/1 (JCOMM-5) Internal and External Review of JCOMM Denis Chang Seng Intergovernmental Oceanographic Commission of UNESCO JCOMM-5, 25-29 October 2017, Geneva, Switzerland

Background (1) Recalling agenda item 12.2 at JCOMM-4 on JCOMM Programme and Planning, the Commission recommended the opportunity for Members/Member States to provide feedback on JCOMM’s performance. The Commission requested the Management Committee and the Secretariats to establish a mechanism for undertaking this task. 2

Background (2) Noting action 3.2.1 from JCOMM MAN-12 to carry out a JCOMM Self Evaluation and Review The results of the survey should be used for inclusion in the revision of the JCOMM Strategy

Method/Approach JCOMM Performance Assessment: Stakeholder Survey was carried out for a period of five weeks using Google Survey/Manual Forms attached from April-May 2016 84 responses out of 270 successful receipts (Click Rate) Report was prepared by Secretariats and reviewed by JCOMM experts There were 28 questions structured as follows: Experience/familiarity with JCOMM ( 5 Major objectives/activities) Impact /influence of JCOMM on Met-Ocean Institutions Importance/priority of JCOMM activities Management/coordination and capacity building of JCOMM Benefits of JCOMM Needs & new activities/ approaches of JCOMM Investment in JCOMM 3

Some Key Findings

Experience of Stakeholders with JCOMM The JCOMM stakeholder survey shows that the majority of people (85.8 %) have been involved for more than 5 years with JCOMM However, only 41.7% are very familiar with JCOMMs activities and its five major objectives Familiarity with JCOMM 5

Impact & Influence of JCOMM on Met-Ocean Institutions/activities 35.7 % of stakeholders perceived that JCOMM has positive impact-a key driver for the ongoing development of their marine-weather and oceans services. 36.9 % of the stakeholders perceived that JCOMM has positive influence on the meteorological offices and oceanographic institutions Impact of JCOMM activities on organization & activities

Coordination & Trainings 45.7 % of stakeholders perceived that JCOMM is effective in uniquely coordinating the development of an ocean-marine observation system. 50.9 % of JCOMM stakeholders perceived that the provision of relevant training is of moderate and high benefit to them[ 22 % of responses from Northern countries, 80 % of responses from Southern countries] JCOMM coordination of the development of an integrated ocean/marine observation system Northern Countries: United States, Canada, Western Europe, and developed parts of Asia, as well as Australia and New Zealand Southern Countries: Africa, Latin America, and developing Asia including the Middle East & SIDS. 6

Documentation 46.3 % of the stakeholders perceived that JCOMM was effective in documentation updates Various documents need to be reviewed and amended: Guide to Wave Analysis and Forecasting Marine Climatology and related Risk Assessment Marine Services Requirements Effectiveness in documentation updates 7

Benefits of JCOMM (1) 20.2 % of stakeholders perceived a low or non-applicable benefit to them from JCOMM sharing of met-ocean products and services [44% of responses from Northern countries,95 % of responses from Southern countries] A majority of stakeholders (83.1%) indicated that they benefit from participating in the JCOMM workshops. 8

Benefits of JCOMM(2) 80.7 % of stakeholders perceived the need for promoting the development of local use of ocean analysis and forecast to support local economies [ 77 % of responses from Northern countries, 100 % of responses from Southern countries] Only 25.9 % perceived that JCOMM was effective in facilitating and sharing new technology Development and local use of ocean analysis and forecast support local economic activities Facilitation in sharing of new technology and research 9

Stakeholders Suggestions: How to improve JCOMM? Strengthening JCOMM roles and approaches Effective consultation & less top down governance Inclusive and broader participation of countries and organizations Continue to emphasis on existing areas (e.g. Observations, Data Mang, Services and Forecasting Systems Further opportunities for capacity development and networking Improve communication strategy and coordination mechanisms Organize meetings/workshops to map out strategies/activities Develop new partnerships with the private sector (e.g. instrumentation) 11

Decision/action required Adopt draft Decision 2.3/1— Internal and External Review of JCOMM. DRAFT DECISION Draft Decision 2.3/1 (JCOMM-5) INTERNAL AND EXTERNAL REVIEW OF JCOMM THE JOINT WMO/IOC TECHNICAL COMMISSION FOR OCEANOGRAPHY AND MARINE METEOROLOGY Recalling agenda item 12.2 at JCOMM-4 on JCOMM Programme and Planning, whereby the Commission noted that a full external review of JCOMM had not been undertaken within the previous intersessional period but, nevertheless, saw value in providing the opportunity for Member/Member States to provide feedback on its past performance and future. The Commission noted that analysis of information from its past performance would assist in the preparation for meetings of JCOMM governing bodies. The Commission requested the Management Committee and the Secretariats to establish a mechanism for undertaking this task. In doing so, the Commission also requested the Management Committee to review the JCOMM priorities for intersessional period to ensure effective use of the available resources, Noting action 3.2.1 from JCOMM MAN-12 to carry out a JCOMM Self Evaluation and Review,

Decision/action required (Cont’) Noting also that a JCOMM Performance Assessment: Stakeholder Survey was carried out for a period of five weeks from April-May 2016, and a report was prepared and reviewed by JCOMM experts, Noting further that the aim of the JCOMM Performance Assessment: Stakeholder Survey is to use the results for inclusion in the revision of the JCOMM strategy, Having examined the JCOMM Performance Assessment: Stakeholder Survey (JCOMM-5/ INF. 2.3), Expresses satisfaction with the assessment; Decides that the survey results and recommendations should be included in the revision of the JCOMM strategy and capacity development activities.