1 RICS Singapore Branch CPD Event 19 June 2012 An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activities Philip Jenkinson Chair of.

Slides:



Advertisements
Similar presentations
Learning from Events 12th June 2013 The Tata Steel Approach
Advertisements

1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Overview and Short Comparison between FIDIC’s Red Book & New Red Book
Chapter 24 Quality Management.
Managing Conflict and Change
Assurance Services Independent professional services that “improve the quality of information, or its context, for decision makers” Assurance service encompass.
UNITED NATIONS Shipment Details Report – January 2006.
Introduction to the Concept of Continuing Airworthiness
1 Session 9 – Government-to-government dispute settlement procedures WTO Dispute Settlement Understanding Vesile Kulaçoglu, WTO Secretariat Dar es Salaam,
Dispute Settlement in the WTO
Objectives To introduce software project management and to describe its distinctive characteristics To discuss project planning and the planning process.
ACCESS TO GENETIC RESOURCES AND BENEFIT-SHARING UNDER THE CONVENTION ON BIOLOGICAL DIVERSITY by Valérie Normand Secretariat of the Convention on Biological.
ActionDescription 1Decisions about planning and managing the coast are governed by general legal instruments. 2Sectoral stakeholders meet on an ad hoc.
The Implementation Structure DG AGRI, October 2005
The Managing Authority –Keystone of the Control System
European Union Cohesion Policy
European Commission FROM THE PROPOSAL TO THE PROJECT ESSEN February Megan Richards - DG XII - European Commission CONFERENCE TO LAUNCH.
Harmonized implementation of CDM Accreditation CDM-Accreditation Panel.
1 ITU Interconnection Workshop 17 August 2001 Role of the Regulator K S Wong Office of the Telecommunications Authority Hong Kong, China.
Module N° 6 – SMS regulation
1 Welcome to this Seminar for Board Members. 2 Board Members and Staff – Sharing of Responsibilities Voluntary Organisations and Volunteers Responsibilities.
Neighbourhood Planning - A Local Authority Perspective Beryl Guiver Principal Planning Policy Officer Tom Rice Planning Enquiry Officer.
American Society for Quality Certification Programs Presented 21 July 2009 by Diane G. Kulisek
Briefing to the Select Committee on Security and Constitutional Development 11 February
Effectively Structuring and Managing Design- Build Projects Timothy John Murphy and Jason J. Annibale Wednesday November 25, 2009.
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
EMS Checklist (ISO model)
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
Effectively applying ISO9001:2000 clauses 6 and 7.
HIT241 - PROCUREMENT & CONTRACT MANAGEMENT Introduction
Human Capital Investment Programme Disability Activation Project (DACT) WELCOME Support Workshop Thursday 7 th February
Contracts – important issues
Introduction When you choose a restaurant for a meal, are you concerned with: The price of the meal How long you have to wait to be seated The quality.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
Legacy Systems Older software systems that remain vital to an organisation.
1..
HR Essentials: Employment Contracts Presented by Kristin Ramsey Associate Director.
2 3 There are two basic areas where there is a need to have resources available. Internal:  Financial  Personnel  Assets  Time External  Consultants.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
Copyright ©2004 Pearson Education, Inc. All rights reserved. Chapter 1 Overview of a Financial Plan.
International Accounting Standard 37
LACPA ISA Presentation
Analyzing Genes and Genomes
Internal Control and Control Risk
1 Phase III: Planning Action Developing Improvement Plans.
PSSA Preparation.
Essential Cell Biology
NEC - Engineering and Construction Contract (ECC)
Contract Law 2014 NCHCA Education Series- January 23, 2014 Presented by Geoffrey Cantello, City of Ottawa and Ron Price, Rasmussen Starr Ruddy LLP.
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
FIDIC MDB Conference Brussels Putting Your Money Where Your Mouth Is OR Practising What Your Preach The Funding (or not) of DABs by International Banks.
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
ZHRC/HTI Financial Management Training
CURRENT PROPOSALS FOR FURTHER INTRODUCTION OF DISPUTE BOARDS WITHIN THE CONSTRUCTION INDUSTRY IN ROMANIA.
International Federation of Consulting Engineers FIDIC FIDIC Contracts and Infrastructure Development Athens, 28 March 2012 Dr William Godwin Barrister,
ACE, ECCE & EFCA SEMINAR 21 October 2004 New EU Public Procurement Directive: EUROPEAN HARMONISATION OF PROCUREMENT PRACTICES IN THE SECTOR OF THE ENGINEERING.
1 Smart Public and Private Procurement Lukáš Klee for BCC in CR Procurement in the construction sector and the use of FIDIC contracts British Chamber of.
Compensation events and claims Presented by Prof. Khem Dallakoti.
Public Procurement Procedure – Bidding Documents
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
Procurement and Contract Management Training
Introduction to FIDIC - Manuals
Administration of a FIDIC Contract - Project Control
Particular Conditions of Contract & Appendix to Tender
Administration of a FIDIC Contract - Financial Management
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Particular Conditions of Contract & Appendix to Tender
Presentation transcript:

1 RICS Singapore Branch CPD Event 19 June 2012 An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activities Philip Jenkinson Chair of the FIDIC Contracts Committee Principal Consultant ATKINS

Objectives Educational and informative Identify and prioritise industry issues Assess barriers, opportunities and risks Identify potential actions (by FIDIC/CC) Identify milestones, success factors and how to assess or measure progress 2

3 Consultancy Agreements Client/Consultant Model Services Agreement, Fourth Edition 2006 Sub-Consultancy Agreement, First Edition 1992 Joint Venture Agreement, First Edition 1992 Model Representative Agreement, Test Edition 2004

4 The Traditional FIDIC Forms of Contract Conditions of Contract for Works of Civil Engineering Construction (Red Book) Fourth Edition 1987 Conditions of Contract for Electrical and Mechanical Works including Erection on Site (Yellow Book) Third Edition 1987

5 Basics Between Employer and Contractor Red Book: payment monthly for work done Yellow Book: lump sum on milestones Every project is unique Guidelines of best practice Part I – General Conditions Part II – Conditions of Particular Application

6 Fair and balanced approach Risk is allocated to the party that is best able to bear and control that risk Compensation and time extension allowed when uncalculated hindrances occur Engineer whose job is principally to supervise and monitor the work –in strict accordance with the Contract to the satisfaction of the Engineer –with formal Engineers Decision

7 The Orange Book Conditions of Contract for Design-Build and Turnkey (Orange Book) First Edition 1995 Employers Representative –not required to be impartial –determine matters fairly, reasonably and in accordance with the Contract Independent dispute adjudication board 1996/7 Supplements for use of DAB (R/Y Books)

8 The 1999 Suite of Standard Conditions of Contract Conditions of Contract for Construction - design by Employer: The Construction Contract (The New Red Book) Conditions of Contract for Plant and Design-Build - design by Contractor: The Plant and Design/Build Contract (The New Yellow Book) Conditions of Contract for EPC Turnkey Projects: The EPC/Turnkey Contract (The Silver Book) Short Form of Contract: The Short Form (The Green Book) The FIDIC Contracts Guide (2000)

9 Principles behind the 1999 Books More consistent wording, with improved clarity; user-friendly format and layout Balance between legal precision and practicability; compatible with both common and civil law concepts Manuals of good engineering practice Prepared by engineers for practical use

10 Principles (continued) Traditional role of the Engineer to make impartial determinations modified to reflect current practice (Red and Yellow Books) Employers Representative introduced: must be fair and reasonable (Silver and Green Books)

11 Principles (continued) Distinction between the Books is based on: –who does the design? –who bears the risk for change in quantities? EPC (Silver Book) provides for the Contractor taking almost all risks (new for FIDIC) Short Form (Green Book) deals with the wide demand for a simpler form of contract

12 Principles (continued) Work must continue, regardless of differences: amicable settlement encouraged Strong financial management: detailed claims procedures must be followed

13 General Remarks on the 1999 Books Suitable for both international and domestic use A framework adaptable to suit local law More definitions: harmonised, except for the Short Form

14 General Remarks (continued) General Conditions not applicable can be disregarded Example Particular Conditions are given Adjudication precedes arbitration

15 The 1999 Red and Yellow Books Emphasis changed to party responsible for design 1999 Yellow Book replaced both 1987 Yellow Book and Orange Book Traditional competitive tendering procedures Risk sharing is balanced All claims, from either Party, have to follow a strict procedure Engineer is no longer stated to be impartial: he shall be deemed to act for the Employer, except when fair determinations are required

16 The 1999 Red Book For building and engineering works designed by the Employer Needs of modern multi-discipline contracts recognised Partial Contractor design possible Valuation and payment based on remeasurement of quantities, but lump sum or cost plus could be used

Red Book (continued) No Clause 67 Engineers decision If a dispute arises, reference to DAB Dispute resolution procedure is: adjudication (DAB)>>>amicable settlement >>>arbitration

18 The 1999 Yellow Book For E&M plant, and for building and engineering works, designed by the Contractor Needs of modern multi-discipline contracts recognised Partial Employer design: include in Employers Requirements

Yellow Book (continued) Valuation and payment based on lump sum with payment plan, but remeasurement possible No Clause 67 Engineers decision If a dispute arises, reference to DAB Dispute resolution procedure is: adjudication (DAB)>>>amicable settlement >>>arbitration

20 The Silver Book (EPCT Contract) More certain final price and time required - balance of risk being changed - privately financed BOT type Contractor asked to cover extra risks Employer will have to pay more Completely new Book - unbalanced risk BUT full open acceptance of risk picture Starting point for BOT type projects

21 The Silver Book (continued) The EPCT Contract is suitable for: particularly E&M and process plant projects all types of Employers civil law jurisdictions where government employer or private developer wants a fixed price turnkey basis and two-party approach There is an Introductory Note of explanation

22 Special Features of the Silver Book Responsibility for design lies with Contractor Employers Requirements usually a performance specification (functional basis) Contractor carries out all engineering, procurement, construction, ready for operation at the turn of a key No Engineer - instead the Employer Lump Sum Contract Price (but adjustments in limited specified cases)

23 Special Features (continued) Testing procedures to demonstrate achievement of specified end result Contractor carries majority of risks, so Employer pays more Final price and time should be more certain Small number of tenderers with negotiation Contractor given freedom to use own methods Has to prove reliability and performance

24 Special Features (continued) These Conditions are not suitable in the following circumstances: if time or information is insufficient before Contract signature if considerable work underground or difficult to inspect if Employer intends to supervise closely or control or review if an intermediary certifies interim payments where part of the Works is designed by Employer for public bidding without negotiations For such circumstances P&DB should be used instead Published in response to market demand

25 The Green Book (Short Form of Contract) US$ 500,000 and six months duration Simple and repetitive works All provisions necessary in 15 clauses Language uncomplicated and simple Balanced risk sharing - no Engineer Design by either party - all types of construction Payment on lump sum or any other basis

26 Dredging and Reclamation Design by Employer or Contractor Valuation – all main methods available Engineer required to act fairly in accordance with Contract No defects liability on dredging Special insurance provisions Adjudication by DAB, then arbitration

27 Red Book MDB Harmonised Version Based on 1999 Red Book Incorporates main common changes normally required by MDBs, e.g.- audits, labour provisions, corruption avoidance, dispute settlement Use subject to Licence Agreement between FIDIC and participating banks

28 Design, Build and Operate Projects Conditions of Contract for Design, Build and Operate Projects (Gold Book), First Edition 2008 Assumes ~20-year operation period Modern approach to risk and insurance Employers Representative Adjudication by DAB, then arbitration

29 Subcontracts Conditions of Subcontract for Construction, Test Edition 2009 Intended for use with 1999 Red Book General Conditions – Particular Conditions Annexes require provision of relevant information

30 Protection of the Environment The Contractor shall take all reasonable steps to protect the environment (both on and off the Site) and to limit damage and nuisance to people and property resulting from pollution, noise and other results of his operations

31 Environment (continued) The Contractor shall ensure that emissions, surface discharge and effluent from the Contractors activities shall not exceed the values indicated in the Specification, and shall not exceed the values prescribed by applicable Laws

32 Project Phases Initiation Study and Evaluation Design Development Detailed Design Contracts Construction, Manufacture, Shipping, Installation, Testing and Commissioning Operations and Maintenance

33 Initiation The Concept The Big Decisions Policy Major Choices

34 Study and Evaluation Feasibility Alternatives Strategy Statutory Requirements

35 Design Development/ Detailed Design Specifications Special Requirements Approvals Inclusion of results/outcomes from earlier Project Phases

Contracts Committee Mandate from Executive Committee Members: Christoph Theune/ Zoltán Záhonyi/Philip Jenkinson Special Advisers: Nael Bunni/ Axel Jaeger/ Michael Mortimer-Hawkins/ Chris Seppala/ Chris Wade Task Group Leaders and Members 36

Contracts Committee Terms of Reference To recommend to the Executive Committee which Conditions of Contract and related documents should be prepared or updated by FIDIC To assist the Secretariat in establishing Task Groups as required, to monitor their work at agreed intervals and to carry out a final review of the documents for submission to the Executive Committee To assist the Secretariat in handling queries on the interpretation of documents To liaise, in conjunction with the Secretariat, with organisations interested in the FIDIC Conditions of Contract To suggest topics and speakers as appropriate for seminars and workshops 37

Current Workload TG1 – DBO Form of Contract TG2 – Procurement Procedures Guide TG4 – Consultancy Agreements TG5 – Subcontract Form (Red Book) TG6 – Update of 1999 Suite (Yellow Book first) TG7 – Update of Dredging Contract (with IADC) TG8 – Update of Short Form (Green Book) TG9 – YB/SB Subcontract Forms TG10 – Tunnelling (proposed, with ITA) TG11 – ODB Form of Contract Training Courses 38