Coil Coating Line Simulation An Introduction Webinar | April 2010 Graeme Peacock Peter Mitchell.

Slides:



Advertisements
Similar presentations
Symantec 2010 Windows 7 Migration Global Results.
Advertisements

Understanding Value Stream Decision Making
Home Energy Ratings in Delaware Roger Colton Fisher, Sheehan & Colton February 1999.
The REMake project: Recycling and resource efficiency in manufacturing Forum on Environmental Goods & Services and Green Business Models Brussels, 15 October.
METAL COIL SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART SSSS May CFR PART 63, SUBPART SSSS May 2006.
METAL COIL SURFACE COATING MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART SSSS May, CFR PART 63, SUBPART SSSS May, 2006.
A First-year Introduction to Life Cycle Analysis Stephanie FarrellRowan University Eduardo CavanaghGlassboro, NJ USA Mariano Savelski.
Author: Carlos Pacheco, Shuvendu K. Lahiri, Michael D. Ernst, Thomas Ball MIT CSAIL.
With TimeCard appointments are tagged with information that converts them into time sheets. This way you can report time and expenses from inside your.
Comparative LCA of Flooring materials: Ceramic vs. Marble Tiles
Carl Wirdak Occidental Petroleum Corporation GEMI Survey Water Use, Issues & Management March 2001.
What determines impedance ?
LLC «Severstal-Gonvarri-Kaluga»
1 OZONE AND OXYGEN GAS SYSTEM CLEANING AND VERIFICATION PRESENTED BY: DARYL L. ROLL, P.E.
The Likely Impact of Smart Electricity Meters in Ireland Seán Lyons (with Conor Devitt & Anne Nolan) ESRI/EPA Environmental Economics Seminar, 30 May 2011.
Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT Medium Font to be used by customers and partners.
Restaurants Can Take a Bite Out of Energy Costs a.
PRETON PRESENTATION PRINT COST SAVING (PCS) TECHNOLOGY PRETON - PRINT AND SAVE February 2006.
Confidential - All Rights Reserved - © Capacity Analysis Fill in Supplier Name and Supplier Location (Address) Fill in Part Name (Ex: Bush, Button,
eQuest Quick Energy Simulation Tool
BSE-in-NX 2.0 Integrated Plug-in for NX Users BSE-in-NX 2.0 Feature Overview December 5, 2013.
SL-10 Laboratory Hot Tack / Seal Tester TMI Group of Companies TMI Group of Companies.
MySQL Installation Guide. MySQL Downloading MySQL Installer.
Vertrel ® - Environmental Aspects General Information l l Vertrel ® HFC contains no Cl and no Br Vertrel ® HFC has a relative low atmospheric.
Module 12 WSP quality assurance tool 1. Module 12 WSP quality assurance tool Session structure Introduction About the tool Using the tool Supporting materials.
Hydrological information systems Svein Taksdal Head of section, Section for Hydroinformatics Hydrology department Norwegian Water Resources and Energy.
What is GT MASTER While GT PRO is the design program for combined cycles, GT MASTER is the corresponding simulation program for off-design calculations.
Semi-Continuous Manufacturing of Personal Care Liquids Peter Divone Sr., P.E. Director, Process Development Global Skin Category R&D Prepared for the.
Skip instructions and start Go through instructions (recommended) Rethink waste: profit through resource efficiency Module 1 – Data Collection With support.
Properties of cast resin transformers
University of Liège Faculty of Applied Sciences Thermodynamics Laboratory Workshop “Commissioning and Auditing of Buildings and HVAC Systems” Use of a.
Emissions and Energy Reporting System How to report a PEN for the Liquid Fuel Opt-in Scheme This presentation works best if you are able to use audio.
Introduction to Input-Output Based LCA. Admin Issues Friday Feb 16th? 1-2:30 confirmed HERE.
What is STEAM MASTER While STEAM PRO is the design program for conventional steam cycle plants, STEAM MASTER is the associated simulation program for off-design.
Software Demonstration Please left click to advance through the show
IAC Student Meeting February 19, 2004 Using DOE BestPractices Steam Tools And Resources Dr. Anthony L. Wright Oak Ridge National Laboratory
Coyote Landscape Products offers a broad line of steel edging products to provide you with many different solutions to design considerations.
Jed Goodell Jesse Williams. Introduction Problem How much heat does a particular heat sink dissipate How many fins are needed to dissipate a specific.
1 of 4 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
POLUTED WATER WITH OIL HYDROCARBONS, METALS, SALTS, CHEMICALS... Emulsion = Water + Concentrate.
Standard Energy Audit Manual for Government Buildings
Objective To assess the energy balance, emission of global warming gasses, and quantify the recycled nutrients by anaerobic digestion of source separated.
J.B. Speed School of Engineering University of Louisville KEEPS Energy Management Toolkit Step 2: Assess Performance & Opportunities Toolkit 2C: School.
B BASF Eco-Efficiency C. Wall BASF Corporation HELPING MAKE PRODUCTS BETTER TM 1 Eco-efficiency: Inside BASF and Beyond… Charlene Wall, BASF Corporation,
Amicus Point of Sale and Business Management System Fuel module.
Martin Kokonya ENERGY PROJECTS IDENTIICATION AND ANALYSIS TOOLS ADB FINESSE Training Course on Renewable Energy and Energy Efficiency for Poverty Reduction.
Profitability Analysis Our client is evaluating a number of scenarios How does our process compare with the others?
June 17-18, 2013 – Columbus, OH. Question: “Is there a way to improve adhesion of two-component polyurethane adhesives to polyester- and epoxy-based powder–coated.
VTS Sputter Roll Coater
Karen Herter (HMG) Mike Langley (DGS) April 15, 2008 Portfolio Manager for California State Buildings Meeting the Requirements of Executive Order S
*** CONFIDENTIAL *** © Toshiba Corporation 2008 Confidential Creating Report Templates.
OBTAINING QUALITY MILL PERFORMANCE Dan Miller
Touchstone Automation’s DART ™ (Data Analysis and Reporting Tool)
Supply Chain Management Sustainability Balanced Scorecard
Another Tool in the Toolbox. Tool Use Save Water Manipulate Water Quality Manipulate Water Quantity for Waste Treatment Save Energy Reduce Footprint/Save.
Activity Based Accounting Understanding the True Cost of Being Wasteful Timothy C. Lindsey Illinois Waste Management and Research.
Better together... we deliver MODELLING, CONTROL AND OPTIMISATION OF A DUAL CIRCUIT INDUCED DRAFT COOLING WATER SYSTEM February 2016 C.J. Muller Sasol;
Final Project Format and Deliverables Examples
Virtual Machines Module 2. Objectives Define virtual machine Define common terminology Identify advantages and disadvantages Determine what software is.
“Coil Coating” (Not to Scale) Dual Uncoilers Joiner Entry Accumulator Exit Accumulator Finish Oven Prime OvenCleaning Section Pretreat Section Inspection.
Agrartechnik Hohenheim 1 ASABE ILES VIII Brazil: September 1 st, ) 1)University of Hohenheim, Stuttgart, Germany 2)Cairo University, Giza, Egypt.
How to develop a VoIP softphone in C# by using OZEKI VoIP SIP SDK This presentation demonstrates the first steps concerning to how to develop a fully-functional.
Lecture Objectives: Learn about detailed vs. empirical modeling Discuss accuracy of energy modeling Introduce life-cycle cost analysis –integrated in eQUEST.
Maturing and cold smoking
Development Environment
Clinton A Jones Eastern Kentucky University Department of Technology
Advanced Photonics Technologies AG at The Institute of Metal Finishing
RDE Regulation Commission Meeting
ABB and sustainable development
ABB and sustainable development
Presentation transcript:

Coil Coating Line Simulation An Introduction Webinar | April 2010 Graeme Peacock Peter Mitchell

Webinar What to expect You should see this page and a toolbox to the right – If you cant hear me, check the audio settings in your toolbox – If you have a question, please type it in the question box I cant respond to everything immediately, but I will get to it before the end!

Coil Coating Line Simulation An Introduction Why coil coating line simulation? Introducing the ECCA coil coating line model Operating the ECCA coil coating line model Some examples

Why coil coating line simulation? Because a coil coating line is large, complicated and has many different inputs Because trials are expensive Because new technology is difficult, time-consuming and expensive to add to a line Because true cost calculations are very difficult

When might simulation be used? Assessing different configurations for a new line or for major upgrades – e.g. moving to no-rinse pre-treatment or recuperative oxidiser Investigating the impact of minor changes – e.g. changing solvent content of paint Optimising running conditions or product mix – e.g. effect of speed on total cost or actual cost of different products Assessing the impact of cost changes on total cost – e.g. the balance between different energy sources

How to do coil coating line simulation Using the ECCA coil coating model

The ECCA coil coating line model A model driven through Microsoft Excel – Various input variables describe a coil coating line Typical values entered as default – Instant calculations Cost by process Material use by process Environmental impact by process

Development of modelling software Developed by ECCA between 2002 and 2005 – Directed by a group of ECCA members (TC12) Initially aimed at benchmarking against LCA, so includes environmental data Development partner Innoval Over 50 registered users

8 Mb Of Free Hard Disc Space Inernet access Requirements Win NT, Windows 2000 or later Excel from the MS Office 97 suite or later

Accessing the model The software is downloaded from: – Requires validation code provided on request by ECCA – If previously installed, annual access code provided free – If a new user, invoiced at 2,000 for ECCA members, 3,500 for non-members per license – 20% discount for multiple licenses

Running the model

Overall scope of the model (1) The user selects the processes that are required to form the virtual coil line. The model represents a steady state (time-averaged) situation. The model calculates specific variable costs, itemised by cleaner, pretreatment, electricity, gas, water, effluent treatment chemicals, coatings etc based on the total annual production of the coil line.

Overall scope of the model (2) Total material & energy use specified for each user selected process is calculated. Costs & material & energy uses are displayed for each of the user selected processes. A menu of 30 processes between the entry section & the exit recoiling section of a coil line is provided.

Processes Included In The Model

Main inputs (1) Entry & exit segment – Strip parameters:- Substrate (Al, Steel), thickness, width, line speed – Size of coils – Number & size of pumps, motors & transportation systems – Length of coil scrapped for each coil change

Main inputs (2) Pre-treatment segment – Processes (Maximum):- 2 preclean stages, 6 counter current rinses 4 clean stages, 6 counter current rinses 4 rinsed pretreatments, 4 rinses, 2 post rinses 3 no-rinse pretreatments – Heating, Water, Cleaner & Pretreatment Usage Waste output (oil, aluminium & pretreatment constituents) Water softening consumables Waste treatment chemicals (quantities & costs) Drier energy use & operational costs

Main inputs (3) Coating segment – Processes (Maximum):- primers. backers, adhesives top coats including powder and UV cured coatings 2 hot laminating stages, one of which would allow the application of a top coat – Wet paint thickness, % v/v solids, SG – Required dry film thickness – The model will allow the user to specify the frequency, duration & cost of stoppages related to paint changes

Main inputs (4) Curing Segment – Various curing techniques are provided: Convection Induction Infra red Near infra red UV

Global Variables input sheet

The Switchboard

Example worksheet: Recoil (proc 20)

Main output data The model shows a series of pre-formatted reports that display: – variable costs itemised by: cleaner, pretreatment, electricity, gas, water, effluent treatment chemicals, coatings – total material use & effluent discharges for particular process sequences together with costs and material & energy uses – total energy usage itemised by the main contributors

Primer Curing Cleaning Pretreatment Drying Cooling Finish Curing CoolingScrap Waste water Treatment Solvent Incineration Cooling Output reports (1)

Primer Coating Finish Coating Waste water Treatment Output reports (2)

Cleaning Pretreatment Primer Curing Finish Curing Solvent Incineration Output reports (3)

Summary results

1.A comparison of a no-rinse and a rinsed pretreatment with regard to energy, water use, waste water and chemical requirements. 2.Savings related to reducing cleaner operating temperatures and increasing the number of subesequent rinses. 3.Paint costing exercise relating to curing techniques Examples of using the model

No-rinse vs. rinsed pre-treatment Total & Component Cost Analysis for a rinsed & No- Rinse pretreatment – Substrate: Steel. – Coil feed: 60m/min, 1200mm wide, 0.6mm thick. – Annual production: 110,000 tonnes. i.Alkaline oxide followed by 2 rinses and a chrome final rinse ii.Chrome no-rinse applied with a chemcoater

Chemicals Waste Disposal Waste Treatment Energy, Pretreatment Energy, Waste Treatment Drying DI Water Prod Conventional Pretreatment No Rinse 000 No-rinse vs. rinsed pre-treatment

000 40% 57% 25% 17% 12% 41% No-rinse vs. rinsed pre-treatment

Cleaner stage: Effect of temperature and rinses Cost analysis of using 2 or 4 rinses at 55 °C or 65 °C – Substrate: Steel. – Coil feed: 60m/min, 1200mm wide, 0.6mm thick. – Annual production: 110,000 tonnes. – Rinsing criterion: 610. – Cleaner sequence:- 1 Preclean stage followed by 1 rinse. 2 Clean stages followed by 2 or 4 reverse cascaded rinses using DI water. Temperature Rinsing stages 55 °C 65 °C 2 4

55 0 C 2 Rinses 65 0 C 2 Rinses 55 0 C 4 Rinses 65 0 C 4 Rinses Cleaner stage: Effect of temperature and rinses Temperature Rinsing stages 55 °C 65 °C 2 4

Paint cost and curing techniques

Conclusions Coil coating line modelling can benefit all coil coaters and suppliers to the industry – Provides a low-cost, low-risk assessment tool – Allows evaluation of different process sequences with regard to costs, material, water & energy usage and effluent discharge on your existing line – Can be used in designing new lines or for minor changes to existing lines – Provides data on: changed operational costs chemical consumptions waste production energy use

Next Steps To buy the software or re-activate an existing license: – Any problems with the software: – In the first instance, Please complete the feedback which will be circulated If enough people want further help, we will run another webinar to fully demonstrate an example model Any questions – please type in the questions box…